{"id":{"repo_id":"gatech","oai_identifier":"oai:repository.gatech.edu:1853/4782"},"canonical_url":"https://search.ndltd.org/etd/gatech/oai:repository.gatech.edu:1853/4782","repository":{"repo_id":"gatech","name":"Georgia Tech","base_url":"https://repository.gatech.edu/server/oai/request"},"display":{"title":"Technology advancement in intelligent buildings : a through preplanning process pertaining to long-term maintainability","abstract":"Innovation and new technologies are daily changing the characteristics of facilities as building owners are requiring more automated services, increased security is becoming more prevalent, and budget constraints are affecting facility operations. Therefore, additional avenues should be evaluated to reduce long-term costs by improving facility maintainability. The conclusions of these quarries should be incorporated into the design and preplanning phases as early as possible, as this is when the most impact can be made at the least expense. As it relates to this effort, preplanning refers to the project concept development and includes some initial aspects of the design. Preplanning for maintainability is one aspect that has historically not received much industry attention. This study considered the preplanning process as it pertains to maintainability, particularly for intelligent buildings, as this is the current trend in which building construction is heading. It limitedly considered the historic aspects of construction and automation, assessed the current situation and considered the projected future needs. Based on the expectations as to where future building intelligence will lead, it was ascertained that better preplanning should be incorporated into the construction process, especially as it pertains to maintainability.","abstract_html":"Innovation and new technologies are daily changing the characteristics of facilities as building owners are requiring more automated services, increased security is becoming more prevalent, and budget constraints are affecting facility operations. Therefore, additional avenues should be evaluated to reduce long-term costs by improving facility maintainability. The conclusions of these quarries should be incorporated into the design and preplanning phases as early as possible, as this is when the most impact can be made at the least expense. As it relates to this effort, preplanning refers to the project concept development and includes some initial aspects of the design. Preplanning for maintainability is one aspect that has historically not received much industry attention. This study considered the preplanning process as it pertains to maintainability, particularly for intelligent buildings, as this is the current trend in which building construction is heading. It limitedly considered the historic aspects of construction and automation, assessed the current situation and considered the projected future needs. Based on the expectations as to where future building intelligence will lead, it was ascertained that better preplanning should be incorporated into the construction process, especially as it pertains to maintainability.","abstract_has_math":false,"creators":["Wilson, Michael Thomas"],"institution":"Georgia Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Building Construction","school":null,"contributors":[],"advisors":["Roper, Kathy O."],"committee_chairs":[],"committee_members":["Uhlik, Felix T.","Oberle, Rita","Stern, Cliff"],"year":2004,"date_issued":"2004-08-20","date_published":"2004-08-20","updated_at":"2026-11-19T03:52:43Z","subjects":["Smart buildings","Intelligent buildings","Preplanning","Controls integration","Maintainability","Sustainability","Facility technological improvements","Facility maintainability","Master planning","Maintainability (Engineering)","Buildings Maintenance"],"languages":["en_US"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1853/4782","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/1853/4782","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.gatech.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.gatech.edu%3A1853%2F4782","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Roper, Kathy O."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Uhlik, Felix T.","Oberle, Rita","Stern, Cliff"]},{"key":"dc:contributor.department","label":"Department","values":["Building Construction"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["College of Design","School of Building Construction","School of Architecture"]},{"key":"dc:creator","label":"Author","values":["Wilson, Michael Thomas"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2005-03-01T19:21:58Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2005-03-01T19:21:58Z"]},{"key":"dc:date.issued","label":"Date","values":["2004-08-20"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Science in Building Construction and Facility Management","Building Construction and Facility Management Graduate Program","Building Construction Graduate Program"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c997b6a0-7e87-4a6f-b6fc-932d776ba8d0","45be5867-cf11-4a7f-b0de-7cd1fc348427","0533a423-c95b-41cf-8e27-2faee06278ad"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["4b19e5c4-5030-482e-bc43-9aef564e1c91","1ae3308a-2b56-4c89-8669-a4c987e93f4c"]},{"key":"dc:type","label":"Dc Type","values":["Text","Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Smart buildings","Intelligent buildings","Preplanning","Controls integration","Maintainability","Sustainability","Facility technological improvements","Facility maintainability","Master planning"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Maintainability (Engineering)","Buildings Maintenance","Intelligent buildings"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1853/4782"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Innovation and new technologies are daily changing the characteristics of facilities as building owners are requiring more automated services, increased security is becoming more prevalent, and budget constraints are affecting facility operations. Therefore, additional avenues should be evaluated to reduce long-term costs by improving facility maintainability. The conclusions of these quarries should be incorporated into the design and preplanning phases as early as possible, as this is when the most impact can be made at the least expense. As it relates to this effort, preplanning refers to the project concept development and includes some initial aspects of the design. Preplanning for maintainability is one aspect that has historically not received much industry attention. This study considered the preplanning process as it pertains to maintainability, particularly for intelligent buildings, as this is the current trend in which building construction is heading. It limitedly considered the historic aspects of construction and automation, assessed the current situation and considered the projected future needs. Based on the expectations as to where future building intelligence will lead, it was ascertained that better preplanning should be incorporated into the construction process, especially as it pertains to maintainability."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.S."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["4453947 bytes"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Technology advancement in intelligent buildings : a through preplanning process pertaining to long-term maintainability"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Roper, Kathy O."],"dc:contributor.committeemember":["Uhlik, Felix T.","Oberle, Rita","Stern, Cliff"],"dc:contributor.department":["Building Construction"],"dc:contributor.other":["College of Design","School of Building Construction","School of Architecture"],"dc:creator":["Wilson, Michael Thomas"],"dc:date.accessioned":["2005-03-01T19:21:58Z"],"dc:date.available":["2005-03-01T19:21:58Z"],"dc:date.issued":["2004-08-20"],"dc:description.abstract":["Innovation and new technologies are daily changing the characteristics of facilities as building owners are requiring more automated services, increased security is becoming more prevalent, and budget constraints are affecting facility operations. Therefore, additional avenues should be evaluated to reduce long-term costs by improving facility maintainability. The conclusions of these quarries should be incorporated into the design and preplanning phases as early as possible, as this is when the most impact can be made at the least expense. As it relates to this effort, preplanning refers to the project concept development and includes some initial aspects of the design. Preplanning for maintainability is one aspect that has historically not received much industry attention. This study considered the preplanning process as it pertains to maintainability, particularly for intelligent buildings, as this is the current trend in which building construction is heading. It limitedly considered the historic aspects of construction and automation, assessed the current situation and considered the projected future needs. Based on the expectations as to where future building intelligence will lead, it was ascertained that better preplanning should be incorporated into the construction process, especially as it pertains to maintainability."],"dc:description.degree":["M.S."],"dc:format.extent":["4453947 bytes"],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/1853/4782"],"dc:language.iso":["en_US"],"dc:publisher":["Georgia Institute of Technology"],"dc:relation.ispartofseries":["Master of Science in Building Construction and Facility Management","Building Construction and Facility Management Graduate Program","Building Construction Graduate Program"],"dc:relation.orgunit":["c997b6a0-7e87-4a6f-b6fc-932d776ba8d0","45be5867-cf11-4a7f-b0de-7cd1fc348427","0533a423-c95b-41cf-8e27-2faee06278ad"],"dc:relation.seriesentity":["4b19e5c4-5030-482e-bc43-9aef564e1c91","1ae3308a-2b56-4c89-8669-a4c987e93f4c"],"dc:subject":["Smart buildings","Intelligent buildings","Preplanning","Controls integration","Maintainability","Sustainability","Facility technological improvements","Facility maintainability","Master planning"],"dc:subject.lcsh":["Maintainability (Engineering)","Buildings Maintenance","Intelligent buildings"],"dc:title":["Technology advancement in intelligent buildings : a through preplanning process pertaining to long-term maintainability"],"dc:type":["Text","Thesis"],"dspace:entity.type":["Publication"]},"updated_at":"2026-11-19T03:52:43Z"}