{"id":{"repo_id":"gatech","oai_identifier":"oai:repository.gatech.edu:1853/56340"},"canonical_url":"https://search.ndltd.org/etd/gatech/oai:repository.gatech.edu:1853/56340","repository":{"repo_id":"gatech","name":"Georgia Tech","base_url":"https://repository.gatech.edu/server/oai/request"},"display":{"title":"Change order insurance policy (COIP) in the U.S. design and construction industry: Is there any likelihood of acceptance?","abstract":"Throughout the construction industry and for a long period of time, the issue of change orders poses as an undesirable problem in maintaining the efficiency and cost of construction projects. This research study will investigate a new mechanism for dealing with such problems. Accordingly, it will propose sharing the risk of cost overrun as a consequence of change orders, with a third-party insurance company, which can also be known as Change Order Insurance Policy (COIP). In order to check for the possibility of implementing such a policy in the U.S. market, this study will primarily test for the acceptance rate of design and construction professionals spanning the industry. Accordingly, participants were chosen from a list of 25 top construction firms found in The Atlanta Business Chronicle. Two anonymous surveys were then administered to assess the extent to which construction-affiliated professionals accept the concept of using COIP. Accordingly, results showed that the majority of participants do not accept the idea of using such a policy. However, program managers and owners did portray higher acceptance rates, as opposed to architects and contractors.","abstract_html":"Throughout the construction industry and for a long period of time, the issue of change orders poses as an undesirable problem in maintaining the efficiency and cost of construction projects. This research study will investigate a new mechanism for dealing with such problems. Accordingly, it will propose sharing the risk of cost overrun as a consequence of change orders, with a third-party insurance company, which can also be known as Change Order Insurance Policy (COIP). In order to check for the possibility of implementing such a policy in the U.S. market, this study will primarily test for the acceptance rate of design and construction professionals spanning the industry. Accordingly, participants were chosen from a list of 25 top construction firms found in The Atlanta Business Chronicle. Two anonymous surveys were then administered to assess the extent to which construction-affiliated professionals accept the concept of using COIP. Accordingly, results showed that the majority of participants do not accept the idea of using such a policy. However, program managers and owners did portray higher acceptance rates, as opposed to architects and contractors.","abstract_has_math":false,"creators":["Ghaziri, Louay"],"institution":"Georgia Institute of Technology","degree_name":null,"degree_level":"Masters","degree_discipline":null,"degree_department":"Building Construction","school":null,"contributors":[],"advisors":["Castro-Lacouture, Daniel"],"committee_chairs":[],"committee_members":["Parker, Ennis","Song, Xinyi"],"year":2016,"date_issued":"2016-11-15","date_published":"2016-11-15","updated_at":"2026-11-19T04:55:10Z","subjects":["Change orders","Building construction","Construction management","Program management","Errors and omissions"],"languages":["en_US"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1853/56340","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/1853/56340","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.gatech.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.gatech.edu%3A1853%2F56340","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Castro-Lacouture, Daniel"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Parker, Ennis","Song, Xinyi"]},{"key":"dc:contributor.department","label":"Department","values":["Building Construction"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["College of Design","School of Building Construction"]},{"key":"dc:creator","label":"Author","values":["Ghaziri, Louay"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2017-01-11T14:05:29Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2017-01-11T14:05:29Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2016-12"]},{"key":"dc:date.issued","label":"Date","values":["2016-11-15"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["December 2016"]},{"key":"dc:date.updated","label":"Dc Date Updated","values":["2017-01-11T14:05:29Z"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["6d614946-815e-49ef-b07a-ccf3260a0846"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Science in Building Construction and Facility Management","Building Construction and Facility Management Graduate Program","Building Construction Graduate Program"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c997b6a0-7e87-4a6f-b6fc-932d776ba8d0","45be5867-cf11-4a7f-b0de-7cd1fc348427"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["4b19e5c4-5030-482e-bc43-9aef564e1c91","1ae3308a-2b56-4c89-8669-a4c987e93f4c"]},{"key":"dc:type","label":"Dc Type","values":["Text","Thesis"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Change orders","Building construction","Construction management","Program management","Errors and omissions"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1853/56340"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Throughout the construction industry and for a long period of time, the issue of change orders poses as an undesirable problem in maintaining the efficiency and cost of construction projects. This research study will investigate a new mechanism for dealing with such problems. Accordingly, it will propose sharing the risk of cost overrun as a consequence of change orders, with a third-party insurance company, which can also be known as Change Order Insurance Policy (COIP). In order to check for the possibility of implementing such a policy in the U.S. market, this study will primarily test for the acceptance rate of design and construction professionals spanning the industry. Accordingly, participants were chosen from a list of 25 top construction firms found in The Atlanta Business Chronicle. Two anonymous surveys were then administered to assess the extent to which construction-affiliated professionals accept the concept of using COIP. Accordingly, results showed that the majority of participants do not accept the idea of using such a policy. However, program managers and owners did portray higher acceptance rates, as opposed to architects and contractors."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.S."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Change order insurance policy (COIP) in the U.S. design and construction industry: Is there any likelihood of acceptance?"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Castro-Lacouture, Daniel"],"dc:contributor.committeemember":["Parker, Ennis","Song, Xinyi"],"dc:contributor.department":["Building Construction"],"dc:contributor.other":["College of Design","School of Building Construction"],"dc:creator":["Ghaziri, Louay"],"dc:date.accessioned":["2017-01-11T14:05:29Z"],"dc:date.available":["2017-01-11T14:05:29Z"],"dc:date.created":["2016-12"],"dc:date.issued":["2016-11-15"],"dc:date.submitted":["December 2016"],"dc:date.updated":["2017-01-11T14:05:29Z"],"dc:description.abstract":["Throughout the construction industry and for a long period of time, the issue of change orders poses as an undesirable problem in maintaining the efficiency and cost of construction projects. This research study will investigate a new mechanism for dealing with such problems. Accordingly, it will propose sharing the risk of cost overrun as a consequence of change orders, with a third-party insurance company, which can also be known as Change Order Insurance Policy (COIP). In order to check for the possibility of implementing such a policy in the U.S. market, this study will primarily test for the acceptance rate of design and construction professionals spanning the industry. Accordingly, participants were chosen from a list of 25 top construction firms found in The Atlanta Business Chronicle. Two anonymous surveys were then administered to assess the extent to which construction-affiliated professionals accept the concept of using COIP. Accordingly, results showed that the majority of participants do not accept the idea of using such a policy. However, program managers and owners did portray higher acceptance rates, as opposed to architects and contractors."],"dc:description.degree":["M.S."],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/1853/56340"],"dc:language.iso":["en_US"],"dc:publisher":["Georgia Institute of Technology"],"dc:relation.advisorentity":["6d614946-815e-49ef-b07a-ccf3260a0846"],"dc:relation.ispartofseries":["Master of Science in Building Construction and Facility Management","Building Construction and Facility Management Graduate Program","Building Construction Graduate Program"],"dc:relation.orgunit":["c997b6a0-7e87-4a6f-b6fc-932d776ba8d0","45be5867-cf11-4a7f-b0de-7cd1fc348427"],"dc:relation.seriesentity":["4b19e5c4-5030-482e-bc43-9aef564e1c91","1ae3308a-2b56-4c89-8669-a4c987e93f4c"],"dc:subject":["Change orders","Building construction","Construction management","Program management","Errors and omissions"],"dc:title":["Change order insurance policy (COIP) in the U.S. design and construction industry: Is there any likelihood of acceptance?"],"dc:type":["Text","Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_level":["Masters"]},"updated_at":"2026-11-19T04:55:10Z"}