{"id":{"repo_id":"gatech","oai_identifier":"oai:repository.gatech.edu:1853/58162"},"canonical_url":"https://search.ndltd.org/etd/gatech/oai:repository.gatech.edu:1853/58162","repository":{"repo_id":"gatech","name":"Georgia Tech","base_url":"https://repository.gatech.edu/server/oai/request"},"display":{"title":"Automated temporary structure safety planning using building information modeling (BIM)","abstract":"Construction safety is greatly impacted by temporary structures, such as scaffolding, formwork, and shoring. However, temporary structures are often in-stalled and utilized in many construction projects without sufficient analysis about potential safety hazards associated with the temporary structures. As a result, there are widespread safety, productivity, constructability, and site coordination problems caused by temporary structures. Focusing on scaffolding, this research proposes a method to integrate temporary structure objects into automated safety planning and optimization using Building Information Modeling (BIM). Automation algorithms for scaffolding placement, safety simulation, and optimization were created. Optimization engine generates multiple alternative scaffolding plans and the safety simulation engine simulates daily construction site conditions for quantitative evaluation of each scaffolding plan. In case studies using real world construction projects, the overall results demonstrate that the proposed approach can assist in the creation of safer construction plan by automatically evaluating and transforming a temporary structure plan into an optimized plan with lower safety risks.","abstract_html":"Construction safety is greatly impacted by temporary structures, such as scaffolding, formwork, and shoring. However, temporary structures are often in-stalled and utilized in many construction projects without sufficient analysis about potential safety hazards associated with the temporary structures. As a result, there are widespread safety, productivity, constructability, and site coordination problems caused by temporary structures. Focusing on scaffolding, this research proposes a method to integrate temporary structure objects into automated safety planning and optimization using Building Information Modeling (BIM). Automation algorithms for scaffolding placement, safety simulation, and optimization were created. Optimization engine generates multiple alternative scaffolding plans and the safety simulation engine simulates daily construction site conditions for quantitative evaluation of each scaffolding plan. In case studies using real world construction projects, the overall results demonstrate that the proposed approach can assist in the creation of safer construction plan by automatically evaluating and transforming a temporary structure plan into an optimized plan with lower safety risks.","abstract_has_math":false,"creators":["Kim, Kyungki"],"institution":"Georgia Institute of Technology","degree_name":null,"degree_level":"Doctoral","degree_discipline":null,"degree_department":"Civil and Environmental Engineering","school":null,"contributors":[],"advisors":["Cho, Yong Kwon"],"committee_chairs":[],"committee_members":["Eastman, Charles M.","Tien, Iris","Haymaker, John R.","Pishdad-Bozorgi, Pardis","Cho, Yong K."],"year":2016,"date_issued":"2016-03-10","date_published":"2016-03-10","updated_at":"2026-11-19T04:08:18Z","subjects":["Building information modeling","BIM","Construction safety","Temporary structure","Scaffolding","Simulation"],"languages":["en_US"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1853/58162","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/1853/58162","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.gatech.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.gatech.edu%3A1853%2F58162","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Cho, Yong Kwon"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Eastman, Charles M.","Tien, Iris","Haymaker, John R.","Pishdad-Bozorgi, Pardis","Cho, Yong K."]},{"key":"dc:contributor.department","label":"Department","values":["Civil and Environmental Engineering"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["School of Civil and Environmental Engineering","College of Engineering"]},{"key":"dc:creator","label":"Author","values":["Kim, Kyungki"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2017-06-07T17:37:14Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2017-06-07T17:37:14Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2016-05"]},{"key":"dc:date.issued","label":"Date","values":["2016-03-10"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["May 2016"]},{"key":"dc:date.updated","label":"Dc Date Updated","values":["2017-06-07T17:37:14Z"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["edb06af8-870c-40db-8fc2-f5b417b89165"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Doctor of Philosophy with a Major in Civil Engineering"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["88639fad-d3ae-4867-9e7a-7c9e6d2ecc7c","7c022d60-21d5-497c-b552-95e489a06569"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["798b4626-2a54-47b0-83d4-0978cf66edaa"]},{"key":"dc:type","label":"Dc Type","values":["Text","Dissertation"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Doctoral"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Building information modeling","BIM","Construction safety","Temporary structure","Scaffolding","Simulation"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1853/58162"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Construction safety is greatly impacted by temporary structures, such as scaffolding, formwork, and shoring. However, temporary structures are often in-stalled and utilized in many construction projects without sufficient analysis about potential safety hazards associated with the temporary structures. As a result, there are widespread safety, productivity, constructability, and site coordination problems caused by temporary structures. Focusing on scaffolding, this research proposes a method to integrate temporary structure objects into automated safety planning and optimization using Building Information Modeling (BIM). Automation algorithms for scaffolding placement, safety simulation, and optimization were created. Optimization engine generates multiple alternative scaffolding plans and the safety simulation engine simulates daily construction site conditions for quantitative evaluation of each scaffolding plan. In case studies using real world construction projects, the overall results demonstrate that the proposed approach can assist in the creation of safer construction plan by automatically evaluating and transforming a temporary structure plan into an optimized plan with lower safety risks."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Ph.D."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Automated temporary structure safety planning using building information modeling (BIM)"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Cho, Yong Kwon"],"dc:contributor.committeemember":["Eastman, Charles M.","Tien, Iris","Haymaker, John R.","Pishdad-Bozorgi, Pardis","Cho, Yong K."],"dc:contributor.department":["Civil and Environmental Engineering"],"dc:contributor.other":["School of Civil and Environmental Engineering","College of Engineering"],"dc:creator":["Kim, Kyungki"],"dc:date.accessioned":["2017-06-07T17:37:14Z"],"dc:date.available":["2017-06-07T17:37:14Z"],"dc:date.created":["2016-05"],"dc:date.issued":["2016-03-10"],"dc:date.submitted":["May 2016"],"dc:date.updated":["2017-06-07T17:37:14Z"],"dc:description.abstract":["Construction safety is greatly impacted by temporary structures, such as scaffolding, formwork, and shoring. However, temporary structures are often in-stalled and utilized in many construction projects without sufficient analysis about potential safety hazards associated with the temporary structures. As a result, there are widespread safety, productivity, constructability, and site coordination problems caused by temporary structures. Focusing on scaffolding, this research proposes a method to integrate temporary structure objects into automated safety planning and optimization using Building Information Modeling (BIM). Automation algorithms for scaffolding placement, safety simulation, and optimization were created. Optimization engine generates multiple alternative scaffolding plans and the safety simulation engine simulates daily construction site conditions for quantitative evaluation of each scaffolding plan. In case studies using real world construction projects, the overall results demonstrate that the proposed approach can assist in the creation of safer construction plan by automatically evaluating and transforming a temporary structure plan into an optimized plan with lower safety risks."],"dc:description.degree":["Ph.D."],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/1853/58162"],"dc:language.iso":["en_US"],"dc:publisher":["Georgia Institute of Technology"],"dc:relation.advisorentity":["edb06af8-870c-40db-8fc2-f5b417b89165"],"dc:relation.ispartofseries":["Doctor of Philosophy with a Major in Civil Engineering"],"dc:relation.orgunit":["88639fad-d3ae-4867-9e7a-7c9e6d2ecc7c","7c022d60-21d5-497c-b552-95e489a06569"],"dc:relation.seriesentity":["798b4626-2a54-47b0-83d4-0978cf66edaa"],"dc:subject":["Building information modeling","BIM","Construction safety","Temporary structure","Scaffolding","Simulation"],"dc:title":["Automated temporary structure safety planning using building information modeling (BIM)"],"dc:type":["Text","Dissertation"],"dspace:entity.type":["Publication"],"thesis:degree_level":["Doctoral"]},"updated_at":"2026-11-19T04:08:18Z"}