{"id":{"repo_id":"gatech","oai_identifier":"oai:repository.gatech.edu:1853/59305"},"canonical_url":"https://search.ndltd.org/etd/gatech/oai:repository.gatech.edu:1853/59305","repository":{"repo_id":"gatech","name":"Georgia Tech","base_url":"https://repository.gatech.edu/server/oai/request"},"display":{"title":"Air Force asset management: preventive versus reactive work","abstract":"To combat reactive maintenance and the “run-to-failure” asset management model, the U.S. Air Force has taken steps to ensure facility condition assessment tracking and asset service life monitoring. The purpose of this study is to investigate how effectively the Air Force has embraced the sustainment of assets and to determine if such trends can be observed at the base level. To do this, a study of the Air Force’s overall spending is analyzed, comparing the amount of funds requested to support asset preservation versus asset restoration over the last four years. A hierarchical linear analysis is then accomplished for a case study of five bases for fiscal years 2010 to mid-2017. This has determined the possible effects of preventive maintenance on reactive maintenance and repair work orders. Results of the macro-study reveal that the percentage of total funds requested for sustainment projects has increased since 2013. In the fiscal year (FY) 2013, only 10% of the total requested funds were assigned to sustainment projects. By the FY 2017, sustainment funds requested made up 36% of the total. Though the transitioning nature of asset management, project-type descriptions, and the continued optimization of the scoring model are factors to consider, it appears that asset sustainment has become more prevalent. The results of the case study suggest that there is little correlation between preventive maintenance and corrective maintenance trends. More data as preventive asset management integrates into practice may reveal different results, but at this stage, preventive maintenance has neither consistently increased or appear to have effected reactive maintenance frequency, labor hours, or cost.","abstract_html":"To combat reactive maintenance and the “run-to-failure” asset management model, the U.S. Air Force has taken steps to ensure facility condition assessment tracking and asset service life monitoring. The purpose of this study is to investigate how effectively the Air Force has embraced the sustainment of assets and to determine if such trends can be observed at the base level. To do this, a study of the Air Force’s overall spending is analyzed, comparing the amount of funds requested to support asset preservation versus asset restoration over the last four years. A hierarchical linear analysis is then accomplished for a case study of five bases for fiscal years 2010 to mid-2017. This has determined the possible effects of preventive maintenance on reactive maintenance and repair work orders. Results of the macro-study reveal that the percentage of total funds requested for sustainment projects has increased since 2013. In the fiscal year (FY) 2013, only 10% of the total requested funds were assigned to sustainment projects. By the FY 2017, sustainment funds requested made up 36% of the total. Though the transitioning nature of asset management, project-type descriptions, and the continued optimization of the scoring model are factors to consider, it appears that asset sustainment has become more prevalent. The results of the case study suggest that there is little correlation between preventive maintenance and corrective maintenance trends. More data as preventive asset management integrates into practice may reveal different results, but at this stage, preventive maintenance has neither consistently increased or appear to have effected reactive maintenance frequency, labor hours, or cost.","abstract_has_math":false,"creators":["Peebles, Gemma"],"institution":"Georgia Institute of Technology","degree_name":null,"degree_level":"Masters","degree_discipline":null,"degree_department":"Building Construction","school":null,"contributors":[],"advisors":["Yang, Eunhwa"],"committee_chairs":[],"committee_members":["Song, Xinyi","Thal, Alfred"],"year":2017,"date_issued":"2017-12-11","date_published":"2017-12-11","updated_at":"2026-11-19T04:13:46Z","subjects":["Asset management","Air Force","Preventive maintenance","Reactive maintenance","Asset sustainment"],"languages":["en_US"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1853/59305","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/1853/59305","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.gatech.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.gatech.edu%3A1853%2F59305","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Yang, Eunhwa"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Song, Xinyi","Thal, Alfred"]},{"key":"dc:contributor.department","label":"Department","values":["Building Construction"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["College of Design","School of Building Construction"]},{"key":"dc:creator","label":"Author","values":["Peebles, Gemma"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2018-01-22T21:14:25Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2018-01-22T21:14:25Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2017-12"]},{"key":"dc:date.issued","label":"Date","values":["2017-12-11"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["December 2017"]},{"key":"dc:date.updated","label":"Dc Date Updated","values":["2018-01-22T21:14:26Z"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["e2c20525-980b-4c25-8295-f07d5963c48f"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Science in Building Construction and Facility Management","Building Construction Graduate Program"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c997b6a0-7e87-4a6f-b6fc-932d776ba8d0","45be5867-cf11-4a7f-b0de-7cd1fc348427"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["4b19e5c4-5030-482e-bc43-9aef564e1c91","1ae3308a-2b56-4c89-8669-a4c987e93f4c"]},{"key":"dc:type","label":"Dc Type","values":["Text","Thesis"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Asset management","Air Force","Preventive maintenance","Reactive maintenance","Asset sustainment"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1853/59305"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["To combat reactive maintenance and the “run-to-failure” asset management model, the U.S. Air Force has taken steps to ensure facility condition assessment tracking and asset service life monitoring. The purpose of this study is to investigate how effectively the Air Force has embraced the sustainment of assets and to determine if such trends can be observed at the base level. To do this, a study of the Air Force’s overall spending is analyzed, comparing the amount of funds requested to support asset preservation versus asset restoration over the last four years. A hierarchical linear analysis is then accomplished for a case study of five bases for fiscal years 2010 to mid-2017. This has determined the possible effects of preventive maintenance on reactive maintenance and repair work orders. Results of the macro-study reveal that the percentage of total funds requested for sustainment projects has increased since 2013. In the fiscal year (FY) 2013, only 10% of the total requested funds were assigned to sustainment projects. By the FY 2017, sustainment funds requested made up 36% of the total. Though the transitioning nature of asset management, project-type descriptions, and the continued optimization of the scoring model are factors to consider, it appears that asset sustainment has become more prevalent. The results of the case study suggest that there is little correlation between preventive maintenance and corrective maintenance trends. More data as preventive asset management integrates into practice may reveal different results, but at this stage, preventive maintenance has neither consistently increased or appear to have effected reactive maintenance frequency, labor hours, or cost."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.S."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Air Force asset management: preventive versus reactive work"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Yang, Eunhwa"],"dc:contributor.committeemember":["Song, Xinyi","Thal, Alfred"],"dc:contributor.department":["Building Construction"],"dc:contributor.other":["College of Design","School of Building Construction"],"dc:creator":["Peebles, Gemma"],"dc:date.accessioned":["2018-01-22T21:14:25Z"],"dc:date.available":["2018-01-22T21:14:25Z"],"dc:date.created":["2017-12"],"dc:date.issued":["2017-12-11"],"dc:date.submitted":["December 2017"],"dc:date.updated":["2018-01-22T21:14:26Z"],"dc:description.abstract":["To combat reactive maintenance and the “run-to-failure” asset management model, the U.S. Air Force has taken steps to ensure facility condition assessment tracking and asset service life monitoring. The purpose of this study is to investigate how effectively the Air Force has embraced the sustainment of assets and to determine if such trends can be observed at the base level. To do this, a study of the Air Force’s overall spending is analyzed, comparing the amount of funds requested to support asset preservation versus asset restoration over the last four years. A hierarchical linear analysis is then accomplished for a case study of five bases for fiscal years 2010 to mid-2017. This has determined the possible effects of preventive maintenance on reactive maintenance and repair work orders. Results of the macro-study reveal that the percentage of total funds requested for sustainment projects has increased since 2013. In the fiscal year (FY) 2013, only 10% of the total requested funds were assigned to sustainment projects. By the FY 2017, sustainment funds requested made up 36% of the total. Though the transitioning nature of asset management, project-type descriptions, and the continued optimization of the scoring model are factors to consider, it appears that asset sustainment has become more prevalent. The results of the case study suggest that there is little correlation between preventive maintenance and corrective maintenance trends. More data as preventive asset management integrates into practice may reveal different results, but at this stage, preventive maintenance has neither consistently increased or appear to have effected reactive maintenance frequency, labor hours, or cost."],"dc:description.degree":["M.S."],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/1853/59305"],"dc:language.iso":["en_US"],"dc:publisher":["Georgia Institute of Technology"],"dc:relation.advisorentity":["e2c20525-980b-4c25-8295-f07d5963c48f"],"dc:relation.ispartofseries":["Master of Science in Building Construction and Facility Management","Building Construction Graduate Program"],"dc:relation.orgunit":["c997b6a0-7e87-4a6f-b6fc-932d776ba8d0","45be5867-cf11-4a7f-b0de-7cd1fc348427"],"dc:relation.seriesentity":["4b19e5c4-5030-482e-bc43-9aef564e1c91","1ae3308a-2b56-4c89-8669-a4c987e93f4c"],"dc:subject":["Asset management","Air Force","Preventive maintenance","Reactive maintenance","Asset sustainment"],"dc:title":["Air Force asset management: preventive versus reactive work"],"dc:type":["Text","Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_level":["Masters"]},"updated_at":"2026-11-19T04:13:46Z"}