{"id":{"repo_id":"gatech","oai_identifier":"oai:repository.gatech.edu:1853/59960"},"canonical_url":"https://search.ndltd.org/etd/gatech/oai:repository.gatech.edu:1853/59960","repository":{"repo_id":"gatech","name":"Georgia Tech","base_url":"https://repository.gatech.edu/server/oai/request"},"display":{"title":"Changes in quality management approaches for design-build highway projects","abstract":"The purpose of this study is to determine changes in quality management approaches of design-build (DB) highway projects compared to those in design-bid-build (DBB) projects. Identifying the existing challenges in the quality management procedures in DB environment requires conducting a content analysis. This involved reviewing regulations, FHWA policy documents, quality manuals, and state DOT solicitation documents. To obtain a deeper understanding of the state of the practice in state DOTs and to identify best practices in handling the identified challenges, this study conducted structured interviews of DOT personnel and industry experts. The results indicate that responsibility for quality assurance is being transferred to design-build teams. The findings of this study show six areas of changes in DB highway projects: (1) acceptance approaches; (2) selection criteria; (3) independent assurance procedures; (4) non-conformance reports; (5) cost mechanisms; and (6) pay factor adjustment.","abstract_html":"The purpose of this study is to determine changes in quality management approaches of design-build (DB) highway projects compared to those in design-bid-build (DBB) projects. Identifying the existing challenges in the quality management procedures in DB environment requires conducting a content analysis. This involved reviewing regulations, FHWA policy documents, quality manuals, and state DOT solicitation documents. To obtain a deeper understanding of the state of the practice in state DOTs and to identify best practices in handling the identified challenges, this study conducted structured interviews of DOT personnel and industry experts. The results indicate that responsibility for quality assurance is being transferred to design-build teams. The findings of this study show six areas of changes in DB highway projects: (1) acceptance approaches; (2) selection criteria; (3) independent assurance procedures; (4) non-conformance reports; (5) cost mechanisms; and (6) pay factor adjustment.","abstract_has_math":false,"creators":["Lee, Jung Hyun"],"institution":"Georgia Institute of Technology","degree_name":null,"degree_level":"Masters","degree_discipline":null,"degree_department":"Building Construction","school":null,"contributors":[],"advisors":["Ashuri, Baabak"],"committee_chairs":[],"committee_members":["Yang, Eunhwa","El Asmar, Mounir"],"year":2018,"date_issued":"2018-04-27","date_published":"2018-04-27","updated_at":"2026-11-19T04:51:23Z","subjects":["Quality management","Design-build","Highway project","Quality assurance"],"languages":["en_US"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1853/59960","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/1853/59960","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.gatech.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.gatech.edu%3A1853%2F59960","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Ashuri, Baabak"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Yang, Eunhwa","El Asmar, Mounir"]},{"key":"dc:contributor.department","label":"Department","values":["Building Construction"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["College of Design","School of Building Construction"]},{"key":"dc:creator","label":"Author","values":["Lee, Jung Hyun"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2018-05-31T18:17:38Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2018-05-31T18:17:38Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2018-05"]},{"key":"dc:date.issued","label":"Date","values":["2018-04-27"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["May 2018"]},{"key":"dc:date.updated","label":"Dc Date Updated","values":["2018-05-31T18:17:38Z"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["61494ab3-3f45-44e8-abe2-b57df371eada"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Science in Building Construction and Facility Management","Building Construction and Facility Management Graduate Program","Building Construction Graduate Program"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c997b6a0-7e87-4a6f-b6fc-932d776ba8d0","45be5867-cf11-4a7f-b0de-7cd1fc348427"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["4b19e5c4-5030-482e-bc43-9aef564e1c91","1ae3308a-2b56-4c89-8669-a4c987e93f4c"]},{"key":"dc:type","label":"Dc Type","values":["Text","Thesis"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Quality management","Design-build","Highway project","Quality assurance"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1853/59960"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this study is to determine changes in quality management approaches of design-build (DB) highway projects compared to those in design-bid-build (DBB) projects. Identifying the existing challenges in the quality management procedures in DB environment requires conducting a content analysis. This involved reviewing regulations, FHWA policy documents, quality manuals, and state DOT solicitation documents. To obtain a deeper understanding of the state of the practice in state DOTs and to identify best practices in handling the identified challenges, this study conducted structured interviews of DOT personnel and industry experts. The results indicate that responsibility for quality assurance is being transferred to design-build teams. The findings of this study show six areas of changes in DB highway projects: (1) acceptance approaches; (2) selection criteria; (3) independent assurance procedures; (4) non-conformance reports; (5) cost mechanisms; and (6) pay factor adjustment."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.S."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Changes in quality management approaches for design-build highway projects"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Ashuri, Baabak"],"dc:contributor.committeemember":["Yang, Eunhwa","El Asmar, Mounir"],"dc:contributor.department":["Building Construction"],"dc:contributor.other":["College of Design","School of Building Construction"],"dc:creator":["Lee, Jung Hyun"],"dc:date.accessioned":["2018-05-31T18:17:38Z"],"dc:date.available":["2018-05-31T18:17:38Z"],"dc:date.created":["2018-05"],"dc:date.issued":["2018-04-27"],"dc:date.submitted":["May 2018"],"dc:date.updated":["2018-05-31T18:17:38Z"],"dc:description.abstract":["The purpose of this study is to determine changes in quality management approaches of design-build (DB) highway projects compared to those in design-bid-build (DBB) projects. Identifying the existing challenges in the quality management procedures in DB environment requires conducting a content analysis. This involved reviewing regulations, FHWA policy documents, quality manuals, and state DOT solicitation documents. To obtain a deeper understanding of the state of the practice in state DOTs and to identify best practices in handling the identified challenges, this study conducted structured interviews of DOT personnel and industry experts. The results indicate that responsibility for quality assurance is being transferred to design-build teams. The findings of this study show six areas of changes in DB highway projects: (1) acceptance approaches; (2) selection criteria; (3) independent assurance procedures; (4) non-conformance reports; (5) cost mechanisms; and (6) pay factor adjustment."],"dc:description.degree":["M.S."],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/1853/59960"],"dc:language.iso":["en_US"],"dc:publisher":["Georgia Institute of Technology"],"dc:relation.advisorentity":["61494ab3-3f45-44e8-abe2-b57df371eada"],"dc:relation.ispartofseries":["Master of Science in Building Construction and Facility Management","Building Construction and Facility Management Graduate Program","Building Construction Graduate Program"],"dc:relation.orgunit":["c997b6a0-7e87-4a6f-b6fc-932d776ba8d0","45be5867-cf11-4a7f-b0de-7cd1fc348427"],"dc:relation.seriesentity":["4b19e5c4-5030-482e-bc43-9aef564e1c91","1ae3308a-2b56-4c89-8669-a4c987e93f4c"],"dc:subject":["Quality management","Design-build","Highway project","Quality assurance"],"dc:title":["Changes in quality management approaches for design-build highway projects"],"dc:type":["Text","Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_level":["Masters"]},"updated_at":"2026-11-19T04:51:23Z"}