{"id":{"repo_id":"gatech","oai_identifier":"oai:repository.gatech.edu:1853/63649"},"canonical_url":"https://search.ndltd.org/etd/gatech/oai:repository.gatech.edu:1853/63649","repository":{"repo_id":"gatech","name":"Georgia Tech","base_url":"https://repository.gatech.edu/server/oai/request"},"display":{"title":"Bayesian approach for feasibility determination and spatiotemporal scheduling","abstract":"This thesis mainly consists of four parts. The first three parts explore Bayesian methods in solving the feasibility determination problem that commonly arises in the study of simulation and the last part considers spatiotemporal scheduling in manufacturing. More specifically, we propose a new reward function for Bayesian feasibility determination which emphasizes the importance of barely feasible/infeasible systems whose mean performance measures are close to the threshold. We utilize our proposed reward function in developing a Bayesian procedure and show its advantage in comparison with the benchmark procedures in the first part. Then, we present new two-stage and sequential Bayesian procedures that are not only easy to compute but also effective in solving the feasibility determination problem in the second part. In the third part, we focus on solving feasibility determination using a Gaussian process and propose our novel acquisition function. Finally, the last part considers a different topic, namely, spatiotemporal scheduling which often occurs in a manufacturing site where products are large and tend to be customized, such as ships, aircraft, and constructional structures. We propose how to generate a reasonably good time and spatial schedule on the manufacturing process. We propose a two-phase approach in solving this scheduling problem with an application to block scheduling in shipbuilding.","abstract_html":"This thesis mainly consists of four parts. The first three parts explore Bayesian methods in solving the feasibility determination problem that commonly arises in the study of simulation and the last part considers spatiotemporal scheduling in manufacturing. More specifically, we propose a new reward function for Bayesian feasibility determination which emphasizes the importance of barely feasible/infeasible systems whose mean performance measures are close to the threshold. We utilize our proposed reward function in developing a Bayesian procedure and show its advantage in comparison with the benchmark procedures in the first part. Then, we present new two-stage and sequential Bayesian procedures that are not only easy to compute but also effective in solving the feasibility determination problem in the second part. In the third part, we focus on solving feasibility determination using a Gaussian process and propose our novel acquisition function. Finally, the last part considers a different topic, namely, spatiotemporal scheduling which often occurs in a manufacturing site where products are large and tend to be customized, such as ships, aircraft, and constructional structures. We propose how to generate a reasonably good time and spatial schedule on the manufacturing process. We propose a two-phase approach in solving this scheduling problem with an application to block scheduling in shipbuilding.","abstract_has_math":false,"creators":["He, Junying"],"institution":"Georgia Institute of Technology","degree_name":null,"degree_level":"Doctoral","degree_discipline":null,"degree_department":"Industrial and Systems Engineering","school":null,"contributors":[],"advisors":["Kim, Seong-Hee"],"committee_chairs":[],"committee_members":["Andradottir, Sigrun","Mei, Yajun","Zhou, Enlu","Park, Chuljin"],"year":2020,"date_issued":"2020-07-14","date_published":"2020-07-14","updated_at":"2026-11-19T05:59:48Z","subjects":["Simulation","Feasibility determination","Bayesian methods","Scheduling","Manufacturing"],"languages":["en_US"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1853/63649","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/1853/63649","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.gatech.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.gatech.edu%3A1853%2F63649","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Kim, Seong-Hee"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Andradottir, Sigrun","Mei, Yajun","Zhou, Enlu","Park, Chuljin"]},{"key":"dc:contributor.department","label":"Department","values":["Industrial and Systems Engineering"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["H. Milton Stewart School of Industrial and Systems Engineering","College of Engineering"]},{"key":"dc:creator","label":"Author","values":["He, Junying"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2020-09-08T12:47:27Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2020-09-08T12:47:27Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2020-08"]},{"key":"dc:date.issued","label":"Date","values":["2020-07-14"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["August 2020"]},{"key":"dc:date.updated","label":"Dc Date Updated","values":["2020-09-08T12:47:27Z"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:relation.advisorentity","label":"Dc Relation Advisorentity","values":["7d0731d7-690b-4695-86cd-fbf52c7c8b6f"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["29ad75f0-242d-49a7-9b3d-0ac88893323c","7c022d60-21d5-497c-b552-95e489a06569"]},{"key":"dc:type","label":"Dc Type","values":["Text","Dissertation"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Doctoral"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Simulation","Feasibility determination","Bayesian methods","Scheduling","Manufacturing"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1853/63649"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis mainly consists of four parts. The first three parts explore Bayesian methods in solving the feasibility determination problem that commonly arises in the study of simulation and the last part considers spatiotemporal scheduling in manufacturing. More specifically, we propose a new reward function for Bayesian feasibility determination which emphasizes the importance of barely feasible/infeasible systems whose mean performance measures are close to the threshold. We utilize our proposed reward function in developing a Bayesian procedure and show its advantage in comparison with the benchmark procedures in the first part. Then, we present new two-stage and sequential Bayesian procedures that are not only easy to compute but also effective in solving the feasibility determination problem in the second part. In the third part, we focus on solving feasibility determination using a Gaussian process and propose our novel acquisition function. Finally, the last part considers a different topic, namely, spatiotemporal scheduling which often occurs in a manufacturing site where products are large and tend to be customized, such as ships, aircraft, and constructional structures. We propose how to generate a reasonably good time and spatial schedule on the manufacturing process. We propose a two-phase approach in solving this scheduling problem with an application to block scheduling in shipbuilding."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Ph.D."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Bayesian approach for feasibility determination and spatiotemporal scheduling"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Kim, Seong-Hee"],"dc:contributor.committeemember":["Andradottir, Sigrun","Mei, Yajun","Zhou, Enlu","Park, Chuljin"],"dc:contributor.department":["Industrial and Systems Engineering"],"dc:contributor.other":["H. Milton Stewart School of Industrial and Systems Engineering","College of Engineering"],"dc:creator":["He, Junying"],"dc:date.accessioned":["2020-09-08T12:47:27Z"],"dc:date.available":["2020-09-08T12:47:27Z"],"dc:date.created":["2020-08"],"dc:date.issued":["2020-07-14"],"dc:date.submitted":["August 2020"],"dc:date.updated":["2020-09-08T12:47:27Z"],"dc:description.abstract":["This thesis mainly consists of four parts. The first three parts explore Bayesian methods in solving the feasibility determination problem that commonly arises in the study of simulation and the last part considers spatiotemporal scheduling in manufacturing. More specifically, we propose a new reward function for Bayesian feasibility determination which emphasizes the importance of barely feasible/infeasible systems whose mean performance measures are close to the threshold. We utilize our proposed reward function in developing a Bayesian procedure and show its advantage in comparison with the benchmark procedures in the first part. Then, we present new two-stage and sequential Bayesian procedures that are not only easy to compute but also effective in solving the feasibility determination problem in the second part. In the third part, we focus on solving feasibility determination using a Gaussian process and propose our novel acquisition function. Finally, the last part considers a different topic, namely, spatiotemporal scheduling which often occurs in a manufacturing site where products are large and tend to be customized, such as ships, aircraft, and constructional structures. We propose how to generate a reasonably good time and spatial schedule on the manufacturing process. We propose a two-phase approach in solving this scheduling problem with an application to block scheduling in shipbuilding."],"dc:description.degree":["Ph.D."],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/1853/63649"],"dc:language.iso":["en_US"],"dc:publisher":["Georgia Institute of Technology"],"dc:relation.advisorentity":["7d0731d7-690b-4695-86cd-fbf52c7c8b6f"],"dc:relation.orgunit":["29ad75f0-242d-49a7-9b3d-0ac88893323c","7c022d60-21d5-497c-b552-95e489a06569"],"dc:subject":["Simulation","Feasibility determination","Bayesian methods","Scheduling","Manufacturing"],"dc:title":["Bayesian approach for feasibility determination and spatiotemporal scheduling"],"dc:type":["Text","Dissertation"],"dspace:entity.type":["Publication"],"thesis:degree_level":["Doctoral"]},"updated_at":"2026-11-19T05:59:48Z"}