{"id":{"repo_id":"gatech","oai_identifier":"oai:repository.gatech.edu:1853/6838"},"canonical_url":"https://search.ndltd.org/etd/gatech/oai:repository.gatech.edu:1853/6838","repository":{"repo_id":"gatech","name":"Georgia Tech","base_url":"https://repository.gatech.edu/server/oai/request"},"display":{"title":"Assessment of in-stream processes in urban streams for development of sediment total maximum daily load","abstract":"The Clean Water Act requires the establishment of Total Maximum Daily Loads (TMDLs) for quantifying allowable pollutant loads for stream reaches in which the biological integrity of the stream is threatened. Sediment TMDLs in urban streams are particularly difficult to establish because they require (1) reliable measurement of sediment loads and (2) the ability to locate sediment sources. This research has attempted to address these challenges through a field study of North Peachtree Creek located in DeKalb County, Georgia, which has been sampled at the Century Boulevard crossing through automatic point sampling and depth-integrated sampling. Storm events from October 2003 through October 2004 provided a field record of sediment concentration and turbidity data over a wide range of storm events. Bed and bank sediment samples were collected for comparison with the point samples and depth-integrated samples. A methodology is presented whereby point sampling is used to calculate suspended sediment discharge and turbidity analysis is used to locate and characterize sediment sources. Point samples provide the boundary condition in the Rouse solution for the vertical distribution of suspended sediment to obtain suspended sediment discharge, which is then calibrated through comparison with depth-integrated sampling. The computer model HEC-RAS (U.S. Army Corps of Engineers, 1998) was applied to the stream reach to calculate the energy grade line slope throughout each storm event for input into the sediment discharge calculations. A favorable relationship between turbidity and suspended fine sediment was found at the sampling cross-section and, through comparison with bed and bank sediment samples, was used to identify the contribution of eroded bank sediment to the total sediment discharge.","abstract_html":"The Clean Water Act requires the establishment of Total Maximum Daily Loads (TMDLs) for quantifying allowable pollutant loads for stream reaches in which the biological integrity of the stream is threatened. Sediment TMDLs in urban streams are particularly difficult to establish because they require (1) reliable measurement of sediment loads and (2) the ability to locate sediment sources. This research has attempted to address these challenges through a field study of North Peachtree Creek located in DeKalb County, Georgia, which has been sampled at the Century Boulevard crossing through automatic point sampling and depth-integrated sampling. Storm events from October 2003 through October 2004 provided a field record of sediment concentration and turbidity data over a wide range of storm events. Bed and bank sediment samples were collected for comparison with the point samples and depth-integrated samples. A methodology is presented whereby point sampling is used to calculate suspended sediment discharge and turbidity analysis is used to locate and characterize sediment sources. Point samples provide the boundary condition in the Rouse solution for the vertical distribution of suspended sediment to obtain suspended sediment discharge, which is then calibrated through comparison with depth-integrated sampling. The computer model HEC-RAS (U.S. Army Corps of Engineers, 1998) was applied to the stream reach to calculate the energy grade line slope throughout each storm event for input into the sediment discharge calculations. A favorable relationship between turbidity and suspended fine sediment was found at the sampling cross-section and, through comparison with bed and bank sediment samples, was used to identify the contribution of eroded bank sediment to the total sediment discharge.","abstract_has_math":false,"creators":["Robinson, Joshua Lee"],"institution":"Georgia Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Civil and Environmental Engineering","school":null,"contributors":[],"advisors":["Sturm, Terry W."],"committee_chairs":[],"committee_members":["Debo, Thomas","Stieglitz, Marc"],"year":2005,"date_issued":"2005-01-17","date_published":"2005-01-17","updated_at":"2026-11-19T06:06:03Z","subjects":["Washload","Water Pollution Total maximum daily load","Sediment transport Georgia Atlanta","Sedimentation and deposition Georgia Atlanta","Water Pollution Total maximum daily load Georgia Atlanta"],"languages":["en_US"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/1853/6838","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/1853/6838","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.gatech.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.gatech.edu%3A1853%2F6838","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Sturm, Terry W."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Debo, Thomas","Stieglitz, Marc"]},{"key":"dc:contributor.department","label":"Department","values":["Civil and Environmental Engineering"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["School of Civil and Environmental Engineering","College of Engineering"]},{"key":"dc:creator","label":"Author","values":["Robinson, Joshua Lee"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2005-07-28T17:51:14Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2005-07-28T17:51:14Z"]},{"key":"dc:date.issued","label":"Date","values":["2005-01-17"]},{"key":"dc:publisher","label":"Institution","values":["Georgia Institute of Technology"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Science in Civil Engineering"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["88639fad-d3ae-4867-9e7a-7c9e6d2ecc7c","7c022d60-21d5-497c-b552-95e489a06569"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["451ac1ce-0dd6-43a5-8843-bae81fd68e33"]},{"key":"dc:type","label":"Dc Type","values":["Text","Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Washload","Water Pollution Total maximum daily load","Sediment transport Georgia Atlanta","Sedimentation and deposition Georgia Atlanta"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Sediment transport Georgia Atlanta","Water Pollution Total maximum daily load Georgia Atlanta","Sedimentation and deposition Georgia Atlanta"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1853/6838"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The Clean Water Act requires the establishment of Total Maximum Daily Loads (TMDLs) for quantifying allowable pollutant loads for stream reaches in which the biological integrity of the stream is threatened. Sediment TMDLs in urban streams are particularly difficult to establish because they require (1) reliable measurement of sediment loads and (2) the ability to locate sediment sources. This research has attempted to address these challenges through a field study of North Peachtree Creek located in DeKalb County, Georgia, which has been sampled at the Century Boulevard crossing through automatic point sampling and depth-integrated sampling. Storm events from October 2003 through October 2004 provided a field record of sediment concentration and turbidity data over a wide range of storm events. Bed and bank sediment samples were collected for comparison with the point samples and depth-integrated samples. A methodology is presented whereby point sampling is used to calculate suspended sediment discharge and turbidity analysis is used to locate and characterize sediment sources. Point samples provide the boundary condition in the Rouse solution for the vertical distribution of suspended sediment to obtain suspended sediment discharge, which is then calibrated through comparison with depth-integrated sampling. The computer model HEC-RAS (U.S. Army Corps of Engineers, 1998) was applied to the stream reach to calculate the energy grade line slope throughout each storm event for input into the sediment discharge calculations. A favorable relationship between turbidity and suspended fine sediment was found at the sampling cross-section and, through comparison with bed and bank sediment samples, was used to identify the contribution of eroded bank sediment to the total sediment discharge."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.S."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["407021 bytes"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Assessment of in-stream processes in urban streams for development of sediment total maximum daily load"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Sturm, Terry W."],"dc:contributor.committeemember":["Debo, Thomas","Stieglitz, Marc"],"dc:contributor.department":["Civil and Environmental Engineering"],"dc:contributor.other":["School of Civil and Environmental Engineering","College of Engineering"],"dc:creator":["Robinson, Joshua Lee"],"dc:date.accessioned":["2005-07-28T17:51:14Z"],"dc:date.available":["2005-07-28T17:51:14Z"],"dc:date.issued":["2005-01-17"],"dc:description.abstract":["The Clean Water Act requires the establishment of Total Maximum Daily Loads (TMDLs) for quantifying allowable pollutant loads for stream reaches in which the biological integrity of the stream is threatened. Sediment TMDLs in urban streams are particularly difficult to establish because they require (1) reliable measurement of sediment loads and (2) the ability to locate sediment sources. This research has attempted to address these challenges through a field study of North Peachtree Creek located in DeKalb County, Georgia, which has been sampled at the Century Boulevard crossing through automatic point sampling and depth-integrated sampling. Storm events from October 2003 through October 2004 provided a field record of sediment concentration and turbidity data over a wide range of storm events. Bed and bank sediment samples were collected for comparison with the point samples and depth-integrated samples. A methodology is presented whereby point sampling is used to calculate suspended sediment discharge and turbidity analysis is used to locate and characterize sediment sources. Point samples provide the boundary condition in the Rouse solution for the vertical distribution of suspended sediment to obtain suspended sediment discharge, which is then calibrated through comparison with depth-integrated sampling. The computer model HEC-RAS (U.S. Army Corps of Engineers, 1998) was applied to the stream reach to calculate the energy grade line slope throughout each storm event for input into the sediment discharge calculations. A favorable relationship between turbidity and suspended fine sediment was found at the sampling cross-section and, through comparison with bed and bank sediment samples, was used to identify the contribution of eroded bank sediment to the total sediment discharge."],"dc:description.degree":["M.S."],"dc:format.extent":["407021 bytes"],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/1853/6838"],"dc:language.iso":["en_US"],"dc:publisher":["Georgia Institute of Technology"],"dc:relation.ispartofseries":["Master of Science in Civil Engineering"],"dc:relation.orgunit":["88639fad-d3ae-4867-9e7a-7c9e6d2ecc7c","7c022d60-21d5-497c-b552-95e489a06569"],"dc:relation.seriesentity":["451ac1ce-0dd6-43a5-8843-bae81fd68e33"],"dc:subject":["Washload","Water Pollution Total maximum daily load","Sediment transport Georgia Atlanta","Sedimentation and deposition Georgia Atlanta"],"dc:subject.lcsh":["Sediment transport Georgia Atlanta","Water Pollution Total maximum daily load Georgia Atlanta","Sedimentation and deposition Georgia Atlanta"],"dc:title":["Assessment of in-stream processes in urban streams for development of sediment total maximum daily load"],"dc:type":["Text","Thesis"],"dspace:entity.type":["Publication"]},"updated_at":"2026-11-19T06:06:03Z"}