{"id":{"repo_id":"greece","oai_identifier":"oai:10442/2551"},"canonical_url":"https://search.ndltd.org/etd/greece/oai:10442/2551","repository":{"repo_id":"greece","name":"Greek National Archive of PhD Theses","base_url":"https://phdtheses.ekt.gr/eadd_oai/request"},"display":{"title":"ΒΕΛΤΙΣΤΕΣ ΚΑΙ ΥΠΟΒΕΛΤΙΣΤΕΣ ΛΥΣΕΙΣ ΣΕ ΠΡΟΒΛΗΜΑΤΑ ΠΡΟΓΡΑΜΜΑΤΙΣΜΟΥ ΚΑΙ ΕΛΕΓΧΟΥ ΣΥΣΤΗΜΑΤΩΝ ΠΑΡΑΓΩΓΗΣ ΤΥΠΟΥ JOB-SHOP","abstract":"PROBLEMS RELATED TO SCHEDULING AND CONTROL OF JOB-SHOP PRODUCTION SYSTEMS ARE CONSIDERED IN THIS DISSERTATION. THREE BASIC APPROACHES ARE USED: ANALYSIS VIA MATHEMATICAL PROGRAMMING, APPLICATION OF FUZZY SETS THEORY AND INTEGRATION OF DECISION SUPPORT SYSTEMS. THE PROBLEM OF OPTIMAL DUE DATE DETERMINATION AND SEQUENCING OF N JOBS ON A SINGLE MACHINE AND THE PROBLEM OF LOT SIZING INA MULTI-PRODUCT SINGLE-MACHINE PRODUCTION SYSTEM ARE SOLVED BY MEANS OF THEFIRST AND THE SECOND APPROACH, RESPECTIVELY, WHILE BY MEANS OF THE LAST APPROACH A DECISION SUPPORT SYSTEM FOR SCHEDULING AND CONTROL OF A REAL PRODUCTION SYSTEM (TEXTILE INDUSTRY) HAS BEEN DEVELOPED.","abstract_html":"PROBLEMS RELATED TO SCHEDULING AND CONTROL OF JOB-SHOP PRODUCTION SYSTEMS ARE CONSIDERED IN THIS DISSERTATION. THREE BASIC APPROACHES ARE USED: ANALYSIS VIA MATHEMATICAL PROGRAMMING, APPLICATION OF FUZZY SETS THEORY AND INTEGRATION OF DECISION SUPPORT SYSTEMS. THE PROBLEM OF OPTIMAL DUE DATE DETERMINATION AND SEQUENCING OF N JOBS ON A SINGLE MACHINE AND THE PROBLEM OF LOT SIZING INA MULTI-PRODUCT SINGLE-MACHINE PRODUCTION SYSTEM ARE SOLVED BY MEANS OF THEFIRST AND THE SECOND APPROACH, RESPECTIVELY, WHILE BY MEANS OF THE LAST APPROACH A DECISION SUPPORT SYSTEM FOR SCHEDULING AND CONTROL OF A REAL PRODUCTION SYSTEM (TEXTILE INDUSTRY) HAS BEEN DEVELOPED.","abstract_has_math":false,"creators":["Καρακαπιλίδης, Νίκος","Karacapilidis, Nikos"],"institution":"University of Patras","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1993,"date_issued":"1993","date_published":"1993","updated_at":"2026-11-18T20:21:37Z","subjects":["Ασαφή σύνολα","ΚΑΘΟΡΙΣΜΟΣ ΗΜΕΡΟΜΗΝΙΩΝ ΠΑΡΑΔΟΣΗΣ","ΠΑΡΑΓΩΓΙΚΑ ΣΥΣΤΗΜΑΤΑ ΜΕ ΜΕΤΑΒΛΗΤΕΣ ΡΟΕΣ","Προγραμματισμός παραγωγής","Συστήματα υποστήριξης αποφάσεων","Decision support systems","DUE DATE DETERMINATION","Furry sets","JOB-SHOP","Scheduling","Επιστήμες Μηχανικού και Τεχνολογία","Επιστήμη Μηχανολόγου Μηχανικού","Engineering and Technology","Mechanical Engineering"],"languages":["gre"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["10.12681/eadd/2551"],"render_values":[{"text":"10.12681/eadd/2551","href":"https://doi.org/10.12681/eadd/2551","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/10442/hedi/2551","outbound_label":"Handle","outbound_source":"dc:identifier","record_url":"http://hdl.handle.net/10442/hedi/2551","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://phdtheses.ekt.gr/eadd_oai/request?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3A10442%2F2551","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Καρακαπιλίδης, Νίκος","Karacapilidis, Nikos"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1993"]},{"key":"dc:publisher","label":"Institution","values":["University of Patras","Πανεπιστήμιο Πατρών"]},{"key":"dc:type","label":"Dc Type","values":["PhD Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Ασαφή σύνολα","ΚΑΘΟΡΙΣΜΟΣ ΗΜΕΡΟΜΗΝΙΩΝ ΠΑΡΑΔΟΣΗΣ","ΠΑΡΑΓΩΓΙΚΑ ΣΥΣΤΗΜΑΤΑ ΜΕ ΜΕΤΑΒΛΗΤΕΣ ΡΟΕΣ","Προγραμματισμός παραγωγής","Συστήματα υποστήριξης αποφάσεων","Decision support systems","DUE DATE DETERMINATION","Furry sets","JOB-SHOP","Scheduling","Επιστήμες Μηχανικού και Τεχνολογία","Επιστήμη Μηχανολόγου Μηχανικού","Engineering and Technology","Mechanical Engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["gre"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["10.12681/eadd/2551","http://hdl.handle.net/10442/hedi/2551"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["PROBLEMS RELATED TO SCHEDULING AND CONTROL OF JOB-SHOP PRODUCTION SYSTEMS ARE CONSIDERED IN THIS DISSERTATION. THREE BASIC APPROACHES ARE USED: ANALYSIS VIA MATHEMATICAL PROGRAMMING, APPLICATION OF FUZZY SETS THEORY AND INTEGRATION OF DECISION SUPPORT SYSTEMS. THE PROBLEM OF OPTIMAL DUE DATE DETERMINATION AND SEQUENCING OF N JOBS ON A SINGLE MACHINE AND THE PROBLEM OF LOT SIZING INA MULTI-PRODUCT SINGLE-MACHINE PRODUCTION SYSTEM ARE SOLVED BY MEANS OF THEFIRST AND THE SECOND APPROACH, RESPECTIVELY, WHILE BY MEANS OF THE LAST APPROACH A DECISION SUPPORT SYSTEM FOR SCHEDULING AND CONTROL OF A REAL PRODUCTION SYSTEM (TEXTILE INDUSTRY) HAS BEEN DEVELOPED.","ΠΡΟΒΛΗΜΑΤΑ ΠΡΟΓΡΑΜΜΑΤΙΣΜΟΥ ΚΑΙ ΕΛΕΓΧΟΥ ΠΑΡΑΓΩΓΙΚΩΝ ΣΥΣΤΗΜΑΤΩΝ ΤΥΠΟΥ JOB-SHOP ΕΙΝΑΙ ΤΟ ΑΝΤΙΚΕΙΜΕΝΟ ΤΗΣ ΔΙΑΤΡΙΒΗΣ. Η ΕΡΕΥΝΑ ΕΠΙΚΕΝΤΡΩΘΗΚΕ ΣΕ ΤΡΕΙΣ ΒΑΣΙΚΕΣ ΜΕΘΟΔΟΥΣ ΠΡΟΣΕΓΓΙΣΗΣ ΤΩΝ ΠΑΡΑΠΑΝΩ ΠΡΟΒΛΗΜΑΤΩΝ: ΑΝΑΛΥΣΗ ΜΕΣΩ ΜΑΘΗΜΑΤΙΚΟΥ ΠΡΟΓΡΑΜΜΑΤΙΣΜΟΥ, ΕΦΑΡΜΟΓΗ ΤΗΣ ΘΕΩΡΙΑΣ ΤΩΝ ΑΣΑΦΩΝ ΣΥΝΟΛΩΝ ΚΑΙ ΑΝΑΠΤΥΞΗ ΣΥΣΤΗΜΑΤΩΝ ΥΠΟΣΤΗΡΙΞΗΣ ΑΠΟΦΑΣΕΩΝ. ΜΕ ΤΙΣ ΔΥΟ ΠΡΩΤΕΣ ΕΠΙΛΥΘΗΚΑΝ ΤΑ ΠΡΟΒΛΗΜΑΤΑ ΤΟΥ ΚΑΘΟΡΙΣΜΟΥ ΤΩΝ ΗΜΕΡΟΜΗΝΙΩΝ ΠΑΡΑΔΟΣΗΣ ΚΑΙ ΤΟΥ ΠΡΟΓΡΑΜΜΑΤΙΣΜΟΥ ΣΕ ΠΑΡΤΙΔΕΣ, ΑΝΤΙΣΤΟΙΧΑ, ΕΝΩ ΜΕΣΩ ΤΗΣ ΤΕΛΕΥΤΑΙΑΣ ΑΝΑΠΤΥΧΘΗΚΕ ΕΝΑ ΣΥΣΤΗΜΑ ΓΙΑ ΤΟΝ ΠΡΟΓΡΑΜΜΑΤΙΣΜΟ ΚΑΙ ΤΟΝ ΕΛΕΓΧΟ ΤΗΣ ΠΑΡΑΓΩΓΗΣ ΣΕ ΜΟΝΑΔΑ ΤΗΣ ΚΛΩΣΤΟΥΦΑΝΤΟΥΡΓΙΑΣ."]},{"key":"dc:title","label":"Title","values":["ΒΕΛΤΙΣΤΕΣ ΚΑΙ ΥΠΟΒΕΛΤΙΣΤΕΣ ΛΥΣΕΙΣ ΣΕ ΠΡΟΒΛΗΜΑΤΑ ΠΡΟΓΡΑΜΜΑΤΙΣΜΟΥ ΚΑΙ ΕΛΕΓΧΟΥ ΣΥΣΤΗΜΑΤΩΝ ΠΑΡΑΓΩΓΗΣ ΤΥΠΟΥ JOB-SHOP","SCHEDULING AND CONTROL OF JOB-SHOP PRODUCTION SYSTEMS"]}]}],"canonical_facts":{"dc:creator":["Καρακαπιλίδης, Νίκος","Karacapilidis, Nikos"],"dc:date":["1993"],"dc:description":["PROBLEMS RELATED TO SCHEDULING AND CONTROL OF JOB-SHOP PRODUCTION SYSTEMS ARE CONSIDERED IN THIS DISSERTATION. THREE BASIC APPROACHES ARE USED: ANALYSIS VIA MATHEMATICAL PROGRAMMING, APPLICATION OF FUZZY SETS THEORY AND INTEGRATION OF DECISION SUPPORT SYSTEMS. THE PROBLEM OF OPTIMAL DUE DATE DETERMINATION AND SEQUENCING OF N JOBS ON A SINGLE MACHINE AND THE PROBLEM OF LOT SIZING INA MULTI-PRODUCT SINGLE-MACHINE PRODUCTION SYSTEM ARE SOLVED BY MEANS OF THEFIRST AND THE SECOND APPROACH, RESPECTIVELY, WHILE BY MEANS OF THE LAST APPROACH A DECISION SUPPORT SYSTEM FOR SCHEDULING AND CONTROL OF A REAL PRODUCTION SYSTEM (TEXTILE INDUSTRY) HAS BEEN DEVELOPED.","ΠΡΟΒΛΗΜΑΤΑ ΠΡΟΓΡΑΜΜΑΤΙΣΜΟΥ ΚΑΙ ΕΛΕΓΧΟΥ ΠΑΡΑΓΩΓΙΚΩΝ ΣΥΣΤΗΜΑΤΩΝ ΤΥΠΟΥ JOB-SHOP ΕΙΝΑΙ ΤΟ ΑΝΤΙΚΕΙΜΕΝΟ ΤΗΣ ΔΙΑΤΡΙΒΗΣ. Η ΕΡΕΥΝΑ ΕΠΙΚΕΝΤΡΩΘΗΚΕ ΣΕ ΤΡΕΙΣ ΒΑΣΙΚΕΣ ΜΕΘΟΔΟΥΣ ΠΡΟΣΕΓΓΙΣΗΣ ΤΩΝ ΠΑΡΑΠΑΝΩ ΠΡΟΒΛΗΜΑΤΩΝ: ΑΝΑΛΥΣΗ ΜΕΣΩ ΜΑΘΗΜΑΤΙΚΟΥ ΠΡΟΓΡΑΜΜΑΤΙΣΜΟΥ, ΕΦΑΡΜΟΓΗ ΤΗΣ ΘΕΩΡΙΑΣ ΤΩΝ ΑΣΑΦΩΝ ΣΥΝΟΛΩΝ ΚΑΙ ΑΝΑΠΤΥΞΗ ΣΥΣΤΗΜΑΤΩΝ ΥΠΟΣΤΗΡΙΞΗΣ ΑΠΟΦΑΣΕΩΝ. ΜΕ ΤΙΣ ΔΥΟ ΠΡΩΤΕΣ ΕΠΙΛΥΘΗΚΑΝ ΤΑ ΠΡΟΒΛΗΜΑΤΑ ΤΟΥ ΚΑΘΟΡΙΣΜΟΥ ΤΩΝ ΗΜΕΡΟΜΗΝΙΩΝ ΠΑΡΑΔΟΣΗΣ ΚΑΙ ΤΟΥ ΠΡΟΓΡΑΜΜΑΤΙΣΜΟΥ ΣΕ ΠΑΡΤΙΔΕΣ, ΑΝΤΙΣΤΟΙΧΑ, ΕΝΩ ΜΕΣΩ ΤΗΣ ΤΕΛΕΥΤΑΙΑΣ ΑΝΑΠΤΥΧΘΗΚΕ ΕΝΑ ΣΥΣΤΗΜΑ ΓΙΑ ΤΟΝ ΠΡΟΓΡΑΜΜΑΤΙΣΜΟ ΚΑΙ ΤΟΝ ΕΛΕΓΧΟ ΤΗΣ ΠΑΡΑΓΩΓΗΣ ΣΕ ΜΟΝΑΔΑ ΤΗΣ ΚΛΩΣΤΟΥΦΑΝΤΟΥΡΓΙΑΣ."],"dc:identifier":["10.12681/eadd/2551","http://hdl.handle.net/10442/hedi/2551"],"dc:language":["gre"],"dc:publisher":["University of Patras","Πανεπιστήμιο Πατρών"],"dc:subject":["Ασαφή σύνολα","ΚΑΘΟΡΙΣΜΟΣ ΗΜΕΡΟΜΗΝΙΩΝ ΠΑΡΑΔΟΣΗΣ","ΠΑΡΑΓΩΓΙΚΑ ΣΥΣΤΗΜΑΤΑ ΜΕ ΜΕΤΑΒΛΗΤΕΣ ΡΟΕΣ","Προγραμματισμός παραγωγής","Συστήματα υποστήριξης αποφάσεων","Decision support systems","DUE DATE DETERMINATION","Furry sets","JOB-SHOP","Scheduling","Επιστήμες Μηχανικού και Τεχνολογία","Επιστήμη Μηχανολόγου Μηχανικού","Engineering and Technology","Mechanical Engineering"],"dc:title":["ΒΕΛΤΙΣΤΕΣ ΚΑΙ ΥΠΟΒΕΛΤΙΣΤΕΣ ΛΥΣΕΙΣ ΣΕ ΠΡΟΒΛΗΜΑΤΑ ΠΡΟΓΡΑΜΜΑΤΙΣΜΟΥ ΚΑΙ ΕΛΕΓΧΟΥ ΣΥΣΤΗΜΑΤΩΝ ΠΑΡΑΓΩΓΗΣ ΤΥΠΟΥ JOB-SHOP","SCHEDULING AND CONTROL OF JOB-SHOP PRODUCTION SYSTEMS"],"dc:type":["PhD Thesis"]},"updated_at":"2026-11-18T20:21:37Z"}