{"id":{"repo_id":"guelph","oai_identifier":"oai:atrium.lib.uoguelph.ca:10214/17357"},"canonical_url":"https://search.ndltd.org/etd/guelph/oai:atrium.lib.uoguelph.ca:10214/17357","repository":{"repo_id":"guelph","name":"University of Guelph","base_url":"https://atrium.lib.uoguelph.ca/server/oai/request"},"display":{"title":"Assessing the Performance of Low Impact Development (LID) Measures During Large Rainfall Events in the Humber River Watershed, Ontario, Canada","abstract":"This research used an EPA SWMM model of the Humber River watershed and simulated the 2 to 100 year rainfall event to assess peak flow attenuation for LID measures. The EPA SWMM model used a semi-distributed modelling approach to test three configurations of LID measures. The LID measures were implemented on 39 subcatchments grouped into four categories. Two design storm distributions (Chicago and AES) and a continuous simulation from 1976 to 1997 were input as rainfall into the model. The continuous simulation was compared to the design storm results by converting maximum annual peak flows using the extreme value distribution to 2 to 100 year peak flows. The design storm and continuous simulation modelling demonstrated that LID measures offer minimal reduction to the peak flow for large rainfall events and provide inconclusive conclusions for smaller rainfall events suggesting design storm modelling can be inaccurate in determining peak flow.","abstract_html":"This research used an EPA SWMM model of the Humber River watershed and simulated the 2 to 100 year rainfall event to assess peak flow attenuation for LID measures. The EPA SWMM model used a semi-distributed modelling approach to test three configurations of LID measures. The LID measures were implemented on 39 subcatchments grouped into four categories. Two design storm distributions (Chicago and AES) and a continuous simulation from 1976 to 1997 were input as rainfall into the model. The continuous simulation was compared to the design storm results by converting maximum annual peak flows using the extreme value distribution to 2 to 100 year peak flows. The design storm and continuous simulation modelling demonstrated that LID measures offer minimal reduction to the peak flow for large rainfall events and provide inconclusive conclusions for smaller rainfall events suggesting design storm modelling can be inaccurate in determining peak flow.","abstract_has_math":false,"creators":["De Boer, Philip"],"institution":"University of Guelph","degree_name":"Master of Applied Science","degree_level":null,"degree_discipline":null,"degree_department":"School of Engineering","school":null,"contributors":[],"advisors":["Binns, Andrew","Guo, Yiping"],"committee_chairs":[],"committee_members":[],"year":2019,"date_issued":"2019-09-04","date_published":"2019-09-04","updated_at":"2026-11-19T08:25:48Z","subjects":["LID","Low Impact Development","Design Storm","Continuous Simulation","EPA SWMM","Stormwater Modelling","Extreme Value Distribution","Humber River Watershed"],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10214/17357","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10214/17357","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aguelph%3Aoai%3Aatrium.lib.uoguelph.ca%3A10214%2F17357","prefix":"oai_dc"},"source_record":{"url":"https://atrium.lib.uoguelph.ca/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aatrium.lib.uoguelph.ca%3A10214%2F17357","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Binns, Andrew","Guo, Yiping"]},{"key":"dc:creator","label":"Author","values":["De Boer, Philip"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2019-09-04T13:15:13Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2019-09-04T13:15:13Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2019-08"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2019-08-15"]},{"key":"dc:date.issued","label":"Date","values":["2019-09-04"]},{"key":"dc:publisher","label":"Institution","values":["University of Guelph"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_department","label":"Department","values":["School of Engineering"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Applied Science"]},{"key":"thesis:degree_program","label":"Thesis Degree Program","values":["Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Guelph"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["LID","Low Impact Development","Design Storm","Continuous Simulation","EPA SWMM","Stormwater Modelling","Extreme Value Distribution","Humber River Watershed"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights.license","label":"Dc Rights License","values":["All items in the Atrium are protected by copyright with all rights reserved unless otherwise indicated."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10214/17357"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This research used an EPA SWMM model of the Humber River watershed and simulated the 2 to 100 year rainfall event to assess peak flow attenuation for LID measures. The EPA SWMM model used a semi-distributed modelling approach to test three configurations of LID measures. The LID measures were implemented on 39 subcatchments grouped into four categories. Two design storm distributions (Chicago and AES) and a continuous simulation from 1976 to 1997 were input as rainfall into the model. The continuous simulation was compared to the design storm results by converting maximum annual peak flows using the extreme value distribution to 2 to 100 year peak flows. The design storm and continuous simulation modelling demonstrated that LID measures offer minimal reduction to the peak flow for large rainfall events and provide inconclusive conclusions for smaller rainfall events suggesting design storm modelling can be inaccurate in determining peak flow."]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["Natural Sciences and Engineering Research Council of Canada","Floodnet"]},{"key":"dc:title","label":"Title","values":["Assessing the Performance of Low Impact Development (LID) Measures During Large Rainfall Events in the Humber River Watershed, Ontario, Canada"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Binns, Andrew","Guo, Yiping"],"dc:creator":["De Boer, Philip"],"dc:date.accessioned":["2019-09-04T13:15:13Z"],"dc:date.available":["2019-09-04T13:15:13Z"],"dc:date.copyright":["2019-08"],"dc:date.created":["2019-08-15"],"dc:date.issued":["2019-09-04"],"dc:description.abstract":["This research used an EPA SWMM model of the Humber River watershed and simulated the 2 to 100 year rainfall event to assess peak flow attenuation for LID measures. The EPA SWMM model used a semi-distributed modelling approach to test three configurations of LID measures. The LID measures were implemented on 39 subcatchments grouped into four categories. Two design storm distributions (Chicago and AES) and a continuous simulation from 1976 to 1997 were input as rainfall into the model. The continuous simulation was compared to the design storm results by converting maximum annual peak flows using the extreme value distribution to 2 to 100 year peak flows. The design storm and continuous simulation modelling demonstrated that LID measures offer minimal reduction to the peak flow for large rainfall events and provide inconclusive conclusions for smaller rainfall events suggesting design storm modelling can be inaccurate in determining peak flow."],"dc:description.sponsorship":["Natural Sciences and Engineering Research Council of Canada","Floodnet"],"dc:identifier.uri":["http://hdl.handle.net/10214/17357"],"dc:language.iso":["en"],"dc:publisher":["University of Guelph"],"dc:rights.license":["All items in the Atrium are protected by copyright with all rights reserved unless otherwise indicated."],"dc:subject":["LID","Low Impact Development","Design Storm","Continuous Simulation","EPA SWMM","Stormwater Modelling","Extreme Value Distribution","Humber River Watershed"],"dc:title":["Assessing the Performance of Low Impact Development (LID) Measures During Large Rainfall Events in the Humber River Watershed, Ontario, Canada"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_department":["School of Engineering"],"thesis:degree_name":["Master of Applied Science"],"thesis:degree_program":["Engineering"],"thesis:institution_name":["University of Guelph"]},"updated_at":"2026-11-19T08:25:48Z"}