{"id":{"repo_id":"guelph","oai_identifier":"oai:atrium.lib.uoguelph.ca:10214/29034"},"canonical_url":"https://search.ndltd.org/etd/guelph/oai:atrium.lib.uoguelph.ca:10214/29034","repository":{"repo_id":"guelph","name":"University of Guelph","base_url":"https://atrium.lib.uoguelph.ca/server/oai/request"},"display":{"title":"Development of Algorithm for Scheduling an Assembly Shop: An Industrial Case Study","abstract":"This research presents a Mixed-Integer Linear Programming (MILP) model for project scheduling with parallel machines, incorporating sequence-dependent setup times and dual resource constraints. The model aims to minimize delays and optimize resource utilization. Due to computational limitations, a Genetic Algorithm (GA)-based framework was developed, which outperformed the Branch-and-Cut algorithm in terms of efficiency and solution quality. The GA achieved a near-optimal makespan of 1785 minutes, while the BC algorithm required 69 hours to converge to a suboptimal solution. This research contributes to the advancement of heuristic optimization techniques for complex scheduling environments, offering insights for industries seeking efficient solutions for production planning and resource management.","abstract_html":"This research presents a Mixed-Integer Linear Programming (MILP) model for project scheduling with parallel machines, incorporating sequence-dependent setup times and dual resource constraints. The model aims to minimize delays and optimize resource utilization. Due to computational limitations, a Genetic Algorithm (GA)-based framework was developed, which outperformed the Branch-and-Cut algorithm in terms of efficiency and solution quality. The GA achieved a near-optimal makespan of 1785 minutes, while the BC algorithm required 69 hours to converge to a suboptimal solution. This research contributes to the advancement of heuristic optimization techniques for complex scheduling environments, offering insights for industries seeking efficient solutions for production planning and resource management.","abstract_has_math":false,"creators":["Sanchi, Sanchi"],"institution":"University of Guelph","degree_name":"Master of Applied Science","degree_level":null,"degree_discipline":null,"degree_department":"School of Engineering","school":null,"contributors":[],"advisors":["Defersha, Fantahun M."],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T08:23:25Z","subjects":["project scheduling","genetic algorithm","MILP programming","manufacturing systems"],"languages":["en"],"rights":["Attribution 4.0 International"],"rights_urls":["http://creativecommons.org/licenses/by/4.0/"],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10214/29034","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10214/29034","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aguelph%3Aoai%3Aatrium.lib.uoguelph.ca%3A10214%2F29034","prefix":"oai_dc"},"source_record":{"url":"https://atrium.lib.uoguelph.ca/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aatrium.lib.uoguelph.ca%3A10214%2F29034","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Defersha, Fantahun M."]},{"key":"dc:creator","label":"Author","values":["Sanchi, Sanchi"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2025-05-14T18:16:05Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2025-05-14T18:16:05Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2025-04-29"]},{"key":"dc:publisher","label":"Institution","values":["University of Guelph"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_department","label":"Department","values":["School of Engineering"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Applied Science"]},{"key":"thesis:degree_program","label":"Thesis Degree Program","values":["Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Guelph"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["project scheduling","genetic algorithm","MILP programming","manufacturing systems"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["Attribution 4.0 International"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://creativecommons.org/licenses/by/4.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10214/29034"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This research presents a Mixed-Integer Linear Programming (MILP) model for project scheduling with parallel machines, incorporating sequence-dependent setup times and dual resource constraints. The model aims to minimize delays and optimize resource utilization. Due to computational limitations, a Genetic Algorithm (GA)-based framework was developed, which outperformed the Branch-and-Cut algorithm in terms of efficiency and solution quality. The GA achieved a near-optimal makespan of 1785 minutes, while the BC algorithm required 69 hours to converge to a suboptimal solution. This research contributes to the advancement of heuristic optimization techniques for complex scheduling environments, offering insights for industries seeking efficient solutions for production planning and resource management."]},{"key":"dc:title","label":"Title","values":["Development of Algorithm for Scheduling an Assembly Shop: An Industrial Case Study"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Defersha, Fantahun M."],"dc:creator":["Sanchi, Sanchi"],"dc:date.accessioned":["2025-05-14T18:16:05Z"],"dc:date.available":["2025-05-14T18:16:05Z"],"dc:date.copyright":["2025-04-29"],"dc:description.abstract":["This research presents a Mixed-Integer Linear Programming (MILP) model for project scheduling with parallel machines, incorporating sequence-dependent setup times and dual resource constraints. The model aims to minimize delays and optimize resource utilization. Due to computational limitations, a Genetic Algorithm (GA)-based framework was developed, which outperformed the Branch-and-Cut algorithm in terms of efficiency and solution quality. The GA achieved a near-optimal makespan of 1785 minutes, while the BC algorithm required 69 hours to converge to a suboptimal solution. This research contributes to the advancement of heuristic optimization techniques for complex scheduling environments, offering insights for industries seeking efficient solutions for production planning and resource management."],"dc:identifier.uri":["https://hdl.handle.net/10214/29034"],"dc:language.iso":["en"],"dc:publisher":["University of Guelph"],"dc:rights":["Attribution 4.0 International"],"dc:rights.uri":["http://creativecommons.org/licenses/by/4.0/"],"dc:subject":["project scheduling","genetic algorithm","MILP programming","manufacturing systems"],"dc:title":["Development of Algorithm for Scheduling an Assembly Shop: An Industrial Case Study"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_department":["School of Engineering"],"thesis:degree_name":["Master of Applied Science"],"thesis:degree_program":["Engineering"],"thesis:institution_name":["University of Guelph"]},"updated_at":"2026-11-19T08:23:25Z"}