{"id":{"repo_id":"guelph","oai_identifier":"oai:atrium.lib.uoguelph.ca:10214/7825"},"canonical_url":"https://search.ndltd.org/etd/guelph/oai:atrium.lib.uoguelph.ca:10214/7825","repository":{"repo_id":"guelph","name":"University of Guelph","base_url":"https://atrium.lib.uoguelph.ca/server/oai/request"},"display":{"title":"Scheduling an Automotive Manufacturing Facility Using Hyper-Heuristics","abstract":"Since the automotive crisis of 2008 manufactures world wide have been forced to adopt leaner styles of day to day operation. This study focuses on modelling a real world scheduling problem for a high volume company which plays an integral part of the global supply chain. Two models are considered using rapidly changing demand from actual customers. In the first model a proof of concept is demonstrated on a subset of the over all data showing the benefits of specific low level heuristics. In the final model additional heuristics are employed to provide richer, robust solutions which easily meet or exceed the performance of highly trained employees that previously had been responsible for scheduling the facility.","abstract_html":"Since the automotive crisis of 2008 manufactures world wide have been forced to adopt leaner styles of day to day operation. This study focuses on modelling a real world scheduling problem for a high volume company which plays an integral part of the global supply chain. Two models are considered using rapidly changing demand from actual customers. In the first model a proof of concept is demonstrated on a subset of the over all data showing the benefits of specific low level heuristics. In the final model additional heuristics are employed to provide richer, robust solutions which easily meet or exceed the performance of highly trained employees that previously had been responsible for scheduling the facility.","abstract_has_math":false,"creators":["Brown, Sarah"],"institution":"University of Guelph","degree_name":"Master of Science","degree_level":null,"degree_discipline":null,"degree_department":"Department of Mathematics and Statistics","school":null,"contributors":[],"advisors":["Ashlock, Daniel"],"committee_chairs":[],"committee_members":[],"year":2014,"date_issued":"2014-01-17","date_published":"2014-01-17","updated_at":"2026-11-19T08:21:03Z","subjects":["Mathematics","Scheduling","Hyper-heuristic","Heuristic","Job Shop Scheduling","Evolutionary Computation","Industrial Mathematics"],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10214/7825","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10214/7825","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aguelph%3Aoai%3Aatrium.lib.uoguelph.ca%3A10214%2F7825","prefix":"oai_dc"},"source_record":{"url":"https://atrium.lib.uoguelph.ca/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aatrium.lib.uoguelph.ca%3A10214%2F7825","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Ashlock, Daniel"]},{"key":"dc:creator","label":"Author","values":["Brown, Sarah"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-01-17T16:45:50Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-01-17T16:45:50Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2014-01"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2013-10-16"]},{"key":"dc:date.issued","label":"Date","values":["2014-01-17"]},{"key":"dc:publisher","label":"Institution","values":["University of Guelph"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_department","label":"Department","values":["Department of Mathematics and Statistics"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:degree_program","label":"Thesis Degree Program","values":["Mathematics and Statistics"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Guelph"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Mathematics","Scheduling","Hyper-heuristic","Heuristic","Job Shop Scheduling","Evolutionary Computation","Industrial Mathematics"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights.license","label":"Dc Rights License","values":["All items in the Atrium are protected by copyright with all rights reserved unless otherwise indicated."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10214/7825"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Since the automotive crisis of 2008 manufactures world wide have been forced to adopt leaner styles of day to day operation. This study focuses on modelling a real world scheduling problem for a high volume company which plays an integral part of the global supply chain. Two models are considered using rapidly changing demand from actual customers. In the first model a proof of concept is demonstrated on a subset of the over all data showing the benefits of specific low level heuristics. In the final model additional heuristics are employed to provide richer, robust solutions which easily meet or exceed the performance of highly trained employees that previously had been responsible for scheduling the facility."]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["Natural Sciences and Engineering Research Council of Canada","University of Guelph"]},{"key":"dc:title","label":"Title","values":["Scheduling an Automotive Manufacturing Facility Using Hyper-Heuristics"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Ashlock, Daniel"],"dc:creator":["Brown, Sarah"],"dc:date.accessioned":["2014-01-17T16:45:50Z"],"dc:date.available":["2014-01-17T16:45:50Z"],"dc:date.copyright":["2014-01"],"dc:date.created":["2013-10-16"],"dc:date.issued":["2014-01-17"],"dc:description.abstract":["Since the automotive crisis of 2008 manufactures world wide have been forced to adopt leaner styles of day to day operation. This study focuses on modelling a real world scheduling problem for a high volume company which plays an integral part of the global supply chain. Two models are considered using rapidly changing demand from actual customers. In the first model a proof of concept is demonstrated on a subset of the over all data showing the benefits of specific low level heuristics. In the final model additional heuristics are employed to provide richer, robust solutions which easily meet or exceed the performance of highly trained employees that previously had been responsible for scheduling the facility."],"dc:description.sponsorship":["Natural Sciences and Engineering Research Council of Canada","University of Guelph"],"dc:identifier.uri":["http://hdl.handle.net/10214/7825"],"dc:language.iso":["en"],"dc:publisher":["University of Guelph"],"dc:rights.license":["All items in the Atrium are protected by copyright with all rights reserved unless otherwise indicated."],"dc:subject":["Mathematics","Scheduling","Hyper-heuristic","Heuristic","Job Shop Scheduling","Evolutionary Computation","Industrial Mathematics"],"dc:title":["Scheduling an Automotive Manufacturing Facility Using Hyper-Heuristics"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_department":["Department of Mathematics and Statistics"],"thesis:degree_name":["Master of Science"],"thesis:degree_program":["Mathematics and Statistics"],"thesis:institution_name":["University of Guelph"]},"updated_at":"2026-11-19T08:21:03Z"}