{"id":{"repo_id":"guelph","oai_identifier":"oai:atrium.lib.uoguelph.ca:10214/8693"},"canonical_url":"https://search.ndltd.org/etd/guelph/oai:atrium.lib.uoguelph.ca:10214/8693","repository":{"repo_id":"guelph","name":"University of Guelph","base_url":"https://atrium.lib.uoguelph.ca/server/oai/request"},"display":{"title":"Performance of Stormwater Low Impact Development in a Commercial Application - IMAX Headquarters Parking Lot, Mississauga, Ontario","abstract":"The employee parking lot at the IMAX headquarters in Mississauga, Ontario underwent an expansion and retrofit to incorporate low impact development (LID) techniques (permeable pavers and bioretention cells) into the stormwater management system for the property. The site was also configured to include infrastructure for long-term monitoring of the LID systems. This thesis presents the findings from the research activities during the first year of operation, which focused on the analysis of the preliminary data to a) determine whether the site is functioning as designed and b) establish the baseline hydrological and water quality performance of the LIDs. The preliminary results indicate that the four (out of six) functioning LID systems achieved average volume reductions ranging from 90-100% during the 2013 monitoring period, which corresponds to an over 90% contaminant load reduction. Further troubleshooting and monitoring of the site is still required at this time to confirm performance.","abstract_html":"The employee parking lot at the IMAX headquarters in Mississauga, Ontario underwent an expansion and retrofit to incorporate low impact development (LID) techniques (permeable pavers and bioretention cells) into the stormwater management system for the property. The site was also configured to include infrastructure for long-term monitoring of the LID systems. This thesis presents the findings from the research activities during the first year of operation, which focused on the analysis of the preliminary data to a) determine whether the site is functioning as designed and b) establish the baseline hydrological and water quality performance of the LIDs. The preliminary results indicate that the four (out of six) functioning LID systems achieved average volume reductions ranging from 90-100% during the 2013 monitoring period, which corresponds to an over 90% contaminant load reduction. Further troubleshooting and monitoring of the site is still required at this time to confirm performance.","abstract_has_math":false,"creators":["Ash, Sarah"],"institution":"University of Guelph","degree_name":"Master of Applied Science","degree_level":null,"degree_discipline":null,"degree_department":"School of Engineering","school":null,"contributors":[],"advisors":["Bradford, Andrea"],"committee_chairs":[],"committee_members":[],"year":2015,"date_issued":"2015-01-08","date_published":"2015-01-08","updated_at":"2026-11-19T08:24:21Z","subjects":["Stormwater","Low Impact Development","LID","Permeable pavement","Bioretention"],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/10214/8693","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/10214/8693","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://atrium.lib.uoguelph.ca/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aatrium.lib.uoguelph.ca%3A10214%2F8693","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Bradford, Andrea"]},{"key":"dc:creator","label":"Author","values":["Ash, Sarah"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2015-01-08T20:39:36Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2015-01-08T20:39:36Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2014-12"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2014-12-19"]},{"key":"dc:date.issued","label":"Date","values":["2015-01-08"]},{"key":"dc:publisher","label":"Institution","values":["University of Guelph"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_department","label":"Department","values":["School of Engineering"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Applied Science"]},{"key":"thesis:degree_program","label":"Thesis Degree Program","values":["Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Guelph"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Stormwater","Low Impact Development","LID","Permeable pavement","Bioretention"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights.license","label":"Dc Rights License","values":["All items in the Atrium are protected by copyright with all rights reserved unless otherwise indicated."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10214/8693"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The employee parking lot at the IMAX headquarters in Mississauga, Ontario underwent an expansion and retrofit to incorporate low impact development (LID) techniques (permeable pavers and bioretention cells) into the stormwater management system for the property. The site was also configured to include infrastructure for long-term monitoring of the LID systems. This thesis presents the findings from the research activities during the first year of operation, which focused on the analysis of the preliminary data to a) determine whether the site is functioning as designed and b) establish the baseline hydrological and water quality performance of the LIDs. The preliminary results indicate that the four (out of six) functioning LID systems achieved average volume reductions ranging from 90-100% during the 2013 monitoring period, which corresponds to an over 90% contaminant load reduction. Further troubleshooting and monitoring of the site is still required at this time to confirm performance."]},{"key":"dc:title","label":"Title","values":["Performance of Stormwater Low Impact Development in a Commercial Application - IMAX Headquarters Parking Lot, Mississauga, Ontario"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Bradford, Andrea"],"dc:creator":["Ash, Sarah"],"dc:date.accessioned":["2015-01-08T20:39:36Z"],"dc:date.available":["2015-01-08T20:39:36Z"],"dc:date.copyright":["2014-12"],"dc:date.created":["2014-12-19"],"dc:date.issued":["2015-01-08"],"dc:description.abstract":["The employee parking lot at the IMAX headquarters in Mississauga, Ontario underwent an expansion and retrofit to incorporate low impact development (LID) techniques (permeable pavers and bioretention cells) into the stormwater management system for the property. The site was also configured to include infrastructure for long-term monitoring of the LID systems. This thesis presents the findings from the research activities during the first year of operation, which focused on the analysis of the preliminary data to a) determine whether the site is functioning as designed and b) establish the baseline hydrological and water quality performance of the LIDs. The preliminary results indicate that the four (out of six) functioning LID systems achieved average volume reductions ranging from 90-100% during the 2013 monitoring period, which corresponds to an over 90% contaminant load reduction. Further troubleshooting and monitoring of the site is still required at this time to confirm performance."],"dc:identifier.uri":["http://hdl.handle.net/10214/8693"],"dc:language.iso":["en"],"dc:publisher":["University of Guelph"],"dc:rights.license":["All items in the Atrium are protected by copyright with all rights reserved unless otherwise indicated."],"dc:subject":["Stormwater","Low Impact Development","LID","Permeable pavement","Bioretention"],"dc:title":["Performance of Stormwater Low Impact Development in a Commercial Application - IMAX Headquarters Parking Lot, Mississauga, Ontario"],"dc:type":["Thesis"],"others:access_status":["open.access"],"thesis:degree_department":["School of Engineering"],"thesis:degree_name":["Master of Applied Science"],"thesis:degree_program":["Engineering"],"thesis:institution_name":["University of Guelph"]},"updated_at":"2026-11-19T08:24:21Z"}