Abstract
dc:description.abstract<p>For many years, the electric power industry has been using optimization methods to help them solve the unit commitment problem, which is the problem of scheduling the production of electric power generating units, over a certain time horizon, in order to minimize the energy production costs. The referred time horizon is usually daily to weekly. This work expands the traditional unit commitment problem to account for the effect of unit commitment schedules on security issues. Specifically, this thesis focuses on the identification of operational high-risk scenarios that can be mitigated by modifying unit commitment schedules. Furthermore, it also addresses a strategy for risk mitigation that consists on imposing adequate constraint into a longer-term unit commitment problem formulation (up to one year). The proposed work involves using the concept of risk-based long-term sequential simulation to develop methods of strengthening security monitoring and decision-making capability for overload, low voltage, voltage instability, and cascading overload problems. The achievement of a good balance between security level and costs is the ultimate objective of the complete procedure.</p>
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Level thesis:degree_level
- thesis
- Discipline thesis:degree_discipline
- Electrical Engineering
- Department dc:contributor.department
- Department of Electrical and Computer Engineering
- Year dc:date.issued
- 2001
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Freitas, Ana
Rights
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Identifier URI
- https://dr.lib.iastate.edu/handle/20.500.12876/98576
- Identifier
- archive/lib.dr.iastate.edu/rtd/21209/
- Dc Identifier Other
-
22208
20252346 - Mods Identifier Filename
- archive/lib.dr.iastate.edu/rtd/21209/Freitas_ISU_2001_F745.pdf|||Fri Jan 14 22:35:42 UTC 2022