{"id":{"repo_id":"iastate","oai_identifier":"oai:dr.lib.iastate.edu:20.500.12876/EzR26O2z"},"canonical_url":"https://search.ndltd.org/etd/iastate/oai:dr.lib.iastate.edu:20.500.12876/EzR26O2z","repository":{"repo_id":"iastate","name":"Iowa State University","base_url":"https://dr.lib.iastate.edu/server/oai/request"},"display":{"title":"Deterministic look-ahead horizons in simulation-based real-time scheduling of an FMS","abstract":"The emergence of flexible manufacturing systems (FMS) has helped to solve some production problems in the real world. But, there are many areas where the efficiency of an FMS can be improved. Precise scheduling is one of those areas. Real-time simulation scheduling has caught many researchers' interest since it was first introduced. Simulation horizons play an important role because of their impact on the statistical output obtained during a simulation run. The aim of this study was to examine the impact on decision making resulting from the choice of different simulation horizons. An experiment is designed for this purpose. A statistical method, one-tailed tests of significance of binomial proportion by means of the normal approximation with a correction for continuity, was employed for analyzing these data. Results indicated a low success rate in both experiments. This indicated that the decision generated by the simulation mechanism tends to be different as different simulation horizons are used. Therefore, the length of simulation horizon will affect the decision generated by the real-time scheduling mechanism and therefore the overall performance of the system.","abstract_html":"The emergence of flexible manufacturing systems (FMS) has helped to solve some production problems in the real world. But, there are many areas where the efficiency of an FMS can be improved. Precise scheduling is one of those areas. Real-time simulation scheduling has caught many researchers&#x27; interest since it was first introduced. Simulation horizons play an important role because of their impact on the statistical output obtained during a simulation run. The aim of this study was to examine the impact on decision making resulting from the choice of different simulation horizons. An experiment is designed for this purpose. A statistical method, one-tailed tests of significance of binomial proportion by means of the normal approximation with a correction for continuity, was employed for analyzing these data. Results indicated a low success rate in both experiments. This indicated that the decision generated by the simulation mechanism tends to be different as different simulation horizons are used. Therefore, the length of simulation horizon will affect the decision generated by the real-time scheduling mechanism and therefore the overall performance of the system.","abstract_has_math":false,"creators":["Lai, Yi-Chiuan"],"institution":null,"degree_name":"Master of Science","degree_level":"Masters","degree_discipline":"Industrial Engineering","degree_department":"Department of Industrial and Manufacturing Systems Engineering","school":null,"contributors":[],"advisors":["Gemmill, Douglas D."],"committee_chairs":[],"committee_members":[],"year":1997,"date_issued":"1997","date_published":"1997","updated_at":"2026-11-19T04:44:56Z","subjects":[],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.31274/td-20250603-82"],"render_values":[{"text":"https://doi.org/10.31274/td-20250603-82","href":"https://doi.org/10.31274/td-20250603-82","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://dr.lib.iastate.edu/handle/20.500.12876/EzR26O2z","outbound_label":"Repository record","outbound_source":"dc:identifier.uri","record_url":"https://dr.lib.iastate.edu/handle/20.500.12876/EzR26O2z","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://dr.lib.iastate.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adr.lib.iastate.edu%3A20.500.12876%2FEzR26O2z","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Gemmill, Douglas D."]},{"key":"dc:creator","label":"Author","values":["Lai, Yi-Chiuan"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2024-10-11T16:59:34Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2024-10-11T16:59:34Z"]},{"key":"dc:date.issued","label":"Date","values":["1997"]},{"key":"dc:type","label":"Dc Type","values":["thesis"]},{"key":"thesis:degree_department","label":"Department","values":["Department of Industrial and Manufacturing Systems Engineering"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:degree_org_unit","label":"Thesis Degree Org Unit","values":["51d8b1a0-5b93-4ee8-990a-a0e04d3501b1"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.31274/td-20250603-82"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://dr.lib.iastate.edu/handle/20.500.12876/EzR26O2z"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The emergence of flexible manufacturing systems (FMS) has helped to solve some production problems in the real world. But, there are many areas where the efficiency of an FMS can be improved. Precise scheduling is one of those areas. Real-time simulation scheduling has caught many researchers' interest since it was first introduced. Simulation horizons play an important role because of their impact on the statistical output obtained during a simulation run. The aim of this study was to examine the impact on decision making resulting from the choice of different simulation horizons. An experiment is designed for this purpose. A statistical method, one-tailed tests of significance of binomial proportion by means of the normal approximation with a correction for continuity, was employed for analyzing these data. Results indicated a low success rate in both experiments. This indicated that the decision generated by the simulation mechanism tends to be different as different simulation horizons are used. Therefore, the length of simulation horizon will affect the decision generated by the real-time scheduling mechanism and therefore the overall performance of the system."]},{"key":"dc:title","label":"Title","values":["Deterministic look-ahead horizons in simulation-based real-time scheduling of an FMS"]},{"key":"dc:title.alternative","label":"Alternative Title","values":["Deterministic look-ahead horizons in simulation based real time scheduling of an FMS"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Gemmill, Douglas D."],"dc:creator":["Lai, Yi-Chiuan"],"dc:date.accessioned":["2024-10-11T16:59:34Z"],"dc:date.available":["2024-10-11T16:59:34Z"],"dc:date.issued":["1997"],"dc:description.abstract":["The emergence of flexible manufacturing systems (FMS) has helped to solve some production problems in the real world. But, there are many areas where the efficiency of an FMS can be improved. Precise scheduling is one of those areas. Real-time simulation scheduling has caught many researchers' interest since it was first introduced. Simulation horizons play an important role because of their impact on the statistical output obtained during a simulation run. The aim of this study was to examine the impact on decision making resulting from the choice of different simulation horizons. An experiment is designed for this purpose. A statistical method, one-tailed tests of significance of binomial proportion by means of the normal approximation with a correction for continuity, was employed for analyzing these data. Results indicated a low success rate in both experiments. This indicated that the decision generated by the simulation mechanism tends to be different as different simulation horizons are used. Therefore, the length of simulation horizon will affect the decision generated by the real-time scheduling mechanism and therefore the overall performance of the system."],"dc:identifier.doi":["https://doi.org/10.31274/td-20250603-82"],"dc:identifier.uri":["https://dr.lib.iastate.edu/handle/20.500.12876/EzR26O2z"],"dc:language.iso":["en"],"dc:title":["Deterministic look-ahead horizons in simulation-based real-time scheduling of an FMS"],"dc:title.alternative":["Deterministic look-ahead horizons in simulation based real time scheduling of an FMS"],"dc:type":["thesis"],"dspace:entity.type":["Publication"],"thesis:degree_department":["Department of Industrial and Manufacturing Systems Engineering"],"thesis:degree_discipline":["Industrial Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science"],"thesis:degree_org_unit":["51d8b1a0-5b93-4ee8-990a-a0e04d3501b1"]},"updated_at":"2026-11-19T04:44:56Z"}