{"id":{"repo_id":"iastate","oai_identifier":"oai:dr.lib.iastate.edu:20.500.12876/WwPgEd4z"},"canonical_url":"https://search.ndltd.org/etd/iastate/oai:dr.lib.iastate.edu:20.500.12876/WwPgEd4z","repository":{"repo_id":"iastate","name":"Iowa State University","base_url":"https://dr.lib.iastate.edu/server/oai/request"},"display":{"title":"New performance measures on a two-machine flowshop scheduling","abstract":"As flowshop research grows, an increasing number of objectives have been discussed. These objectives mostly deal with completion time, lateness, tardiness, and machine utilization time. Some of this research deals with multiple objective or multiple criteria. It is the intent of this study to explore certain additional objectives for two-machine flowshops. This study will use certain classical scheduling ideas to address several performance measures, including single criteria and multiple criteria. These criteria are minimization in the range of completion time, the second largest completion time, and the median completion time. The first type of problem has applications in any service whenever it is desirable to provide the customers the same treatment or less variation in the jobs completion time. The second type of problem concerns dismissing the largest completion time as possibly unrepresentative and extreme, so that only the makespan of the remaining jobs is taken into account. In the third type of problem, it is desirable to finish the first half of the jobs earlier and to minimize the conditional makespan of the remaining jobs. No relevant literature has been found that looks at scheduling for these types of objectives. Thus, the purpose of this study is to advance new objectives in sequencing jobs in a flowshop.","abstract_html":"As flowshop research grows, an increasing number of objectives have been discussed. These objectives mostly deal with completion time, lateness, tardiness, and machine utilization time. Some of this research deals with multiple objective or multiple criteria. It is the intent of this study to explore certain additional objectives for two-machine flowshops. This study will use certain classical scheduling ideas to address several performance measures, including single criteria and multiple criteria. These criteria are minimization in the range of completion time, the second largest completion time, and the median completion time. The first type of problem has applications in any service whenever it is desirable to provide the customers the same treatment or less variation in the jobs completion time. The second type of problem concerns dismissing the largest completion time as possibly unrepresentative and extreme, so that only the makespan of the remaining jobs is taken into account. In the third type of problem, it is desirable to finish the first half of the jobs earlier and to minimize the conditional makespan of the remaining jobs. No relevant literature has been found that looks at scheduling for these types of objectives. Thus, the purpose of this study is to advance new objectives in sequencing jobs in a flowshop.","abstract_has_math":false,"creators":["Charlie, Denny"],"institution":null,"degree_name":"Master of Science","degree_level":"Masters","degree_discipline":"Industrial Engineering","degree_department":"Department of Industrial and Manufacturing Systems Engineering","school":null,"contributors":[],"advisors":["David, Herbert T."],"committee_chairs":[],"committee_members":[],"year":1997,"date_issued":"1997","date_published":"1997","updated_at":"2026-11-19T04:45:28Z","subjects":[],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://dr.lib.iastate.edu/handle/20.500.12876/WwPgEd4z"],"render_values":[{"text":"https://dr.lib.iastate.edu/handle/20.500.12876/WwPgEd4z","href":"https://dr.lib.iastate.edu/handle/20.500.12876/WwPgEd4z","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.31274/td-20250603-195","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.31274/td-20250603-195","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aiastate%3Aoai%3Adr.lib.iastate.edu%3A20.500.12876%2FWwPgEd4z","prefix":"oai_dc"},"source_record":{"url":"https://dr.lib.iastate.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adr.lib.iastate.edu%3A20.500.12876%2FWwPgEd4z","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["David, Herbert T."]},{"key":"dc:creator","label":"Author","values":["Charlie, Denny"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2024-09-25T16:40:53Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2024-09-25T16:40:53Z"]},{"key":"dc:date.issued","label":"Date","values":["1997"]},{"key":"dc:type","label":"Dc Type","values":["thesis"]},{"key":"thesis:degree_department","label":"Department","values":["Department of Industrial and Manufacturing Systems Engineering"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science"]},{"key":"thesis:degree_org_unit","label":"Thesis Degree Org Unit","values":["51d8b1a0-5b93-4ee8-990a-a0e04d3501b1"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.doi","label":"DOI","values":["https://doi.org/10.31274/td-20250603-195"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://dr.lib.iastate.edu/handle/20.500.12876/WwPgEd4z"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["As flowshop research grows, an increasing number of objectives have been discussed. These objectives mostly deal with completion time, lateness, tardiness, and machine utilization time. Some of this research deals with multiple objective or multiple criteria. It is the intent of this study to explore certain additional objectives for two-machine flowshops. This study will use certain classical scheduling ideas to address several performance measures, including single criteria and multiple criteria. These criteria are minimization in the range of completion time, the second largest completion time, and the median completion time. The first type of problem has applications in any service whenever it is desirable to provide the customers the same treatment or less variation in the jobs completion time. The second type of problem concerns dismissing the largest completion time as possibly unrepresentative and extreme, so that only the makespan of the remaining jobs is taken into account. In the third type of problem, it is desirable to finish the first half of the jobs earlier and to minimize the conditional makespan of the remaining jobs. No relevant literature has been found that looks at scheduling for these types of objectives. Thus, the purpose of this study is to advance new objectives in sequencing jobs in a flowshop."]},{"key":"dc:title","label":"Title","values":["New performance measures on a two-machine flowshop scheduling"]},{"key":"dc:title.alternative","label":"Alternative Title","values":["New performance measures on a two machine flowshop scheduling"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["David, Herbert T."],"dc:creator":["Charlie, Denny"],"dc:date.accessioned":["2024-09-25T16:40:53Z"],"dc:date.available":["2024-09-25T16:40:53Z"],"dc:date.issued":["1997"],"dc:description.abstract":["As flowshop research grows, an increasing number of objectives have been discussed. These objectives mostly deal with completion time, lateness, tardiness, and machine utilization time. Some of this research deals with multiple objective or multiple criteria. It is the intent of this study to explore certain additional objectives for two-machine flowshops. This study will use certain classical scheduling ideas to address several performance measures, including single criteria and multiple criteria. These criteria are minimization in the range of completion time, the second largest completion time, and the median completion time. The first type of problem has applications in any service whenever it is desirable to provide the customers the same treatment or less variation in the jobs completion time. The second type of problem concerns dismissing the largest completion time as possibly unrepresentative and extreme, so that only the makespan of the remaining jobs is taken into account. In the third type of problem, it is desirable to finish the first half of the jobs earlier and to minimize the conditional makespan of the remaining jobs. No relevant literature has been found that looks at scheduling for these types of objectives. Thus, the purpose of this study is to advance new objectives in sequencing jobs in a flowshop."],"dc:identifier.doi":["https://doi.org/10.31274/td-20250603-195"],"dc:identifier.uri":["https://dr.lib.iastate.edu/handle/20.500.12876/WwPgEd4z"],"dc:language.iso":["en"],"dc:title":["New performance measures on a two-machine flowshop scheduling"],"dc:title.alternative":["New performance measures on a two machine flowshop scheduling"],"dc:type":["thesis"],"dspace:entity.type":["Publication"],"thesis:degree_department":["Department of Industrial and Manufacturing Systems Engineering"],"thesis:degree_discipline":["Industrial Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science"],"thesis:degree_org_unit":["51d8b1a0-5b93-4ee8-990a-a0e04d3501b1"]},"updated_at":"2026-11-19T04:45:28Z"}