{"id":{"repo_id":"manitoba","oai_identifier":"oai:mspace.lib.umanitoba.ca:1993/2026"},"canonical_url":"https://search.ndltd.org/etd/manitoba/oai:mspace.lib.umanitoba.ca:1993/2026","repository":{"repo_id":"manitoba","name":"University of Manitoba","base_url":"https://mspace.lib.umanitoba.ca/oai/request"},"display":{"title":"Capacity planning under fuzzy environment","abstract":"In recent years, in manufacturing industry, their has been a great deal of interest in capacity planning because the focus is shifting on techniques that determine flexibility of the amount and timing of work center capacity to satisfy the master production schedule. There are several techniques available for preparing work center capacity plans under crisp environment, but there is a scarcity of technique available for finding the required capacity in terms of labor hours under fuzzy environment. In the present thesis, we analyze the Bill of Labor (BOL), Resource Profile (RP) and Capacity Requirements Planning (CRP) approaches under fuzzy environment with a variety of assumptions. Chapter 1 provides an introduction to the concepts of capacity planning problems considered in the thesis, followed by the literature survey in Chapter 2. The capacity analysis under fuzzy envi onment using BOL approach for rough cut capacity planning (RCCP) is considered in Chapter 3. Assuming that all the components of an item are manufactured in the same time period as the end item, i.e. lead-time offsets are considered to zero. Chapter 4 deals with the capacity analysis under fuzzy environment using RP approach for RCCP by including the lead-time dimension in it. Chapter 5 deals with the capacity requirements planning under fuzzy environment. Finally, conclusion, contribution and recommendations for further research on the aforementioned problems are presented in Chapter 6.","abstract_html":"In recent years, in manufacturing industry, their has been a great deal of interest in capacity planning because the focus is shifting on techniques that determine flexibility of the amount and timing of work center capacity to satisfy the master production schedule. There are several techniques available for preparing work center capacity plans under crisp environment, but there is a scarcity of technique available for finding the required capacity in terms of labor hours under fuzzy environment. In the present thesis, we analyze the Bill of Labor (BOL), Resource Profile (RP) and Capacity Requirements Planning (CRP) approaches under fuzzy environment with a variety of assumptions. Chapter 1 provides an introduction to the concepts of capacity planning problems considered in the thesis, followed by the literature survey in Chapter 2. The capacity analysis under fuzzy envi onment using BOL approach for rough cut capacity planning (RCCP) is considered in Chapter 3. Assuming that all the components of an item are manufactured in the same time period as the end item, i.e. lead-time offsets are considered to zero. Chapter 4 deals with the capacity analysis under fuzzy environment using RP approach for RCCP by including the lead-time dimension in it. Chapter 5 deals with the capacity requirements planning under fuzzy environment. Finally, conclusion, contribution and recommendations for further research on the aforementioned problems are presented in Chapter 6.","abstract_has_math":false,"creators":["Verma, Manoj Kumar"],"institution":null,"degree_name":null,"degree_level":"Master of Science (M.Sc.)","degree_discipline":"Mechanical and Manufacturing Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2001,"date_issued":"2001-04-01T00:00:00Z","date_published":"2001-04-01T00:00:00Z","updated_at":"2026-11-19T09:02:53Z","subjects":[],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1993/2026","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1993/2026","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amanitoba%3Aoai%3Amspace.lib.umanitoba.ca%3A1993%2F2026","prefix":"oai_dc"},"source_record":{"url":"https://mspace.lib.umanitoba.ca/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Amspace.lib.umanitoba.ca%3A1993%2F2026","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Verma, Manoj Kumar"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2007-05-22T15:13:37Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2007-05-22T15:13:37Z"]},{"key":"dc:date.issued","label":"Date","values":["2001-04-01T00:00:00Z"]},{"key":"dc:type","label":"Dc Type","values":["master thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Mechanical and Manufacturing Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master of Science (M.Sc.)"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1993/2026"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["In recent years, in manufacturing industry, their has been a great deal of interest in capacity planning because the focus is shifting on techniques that determine flexibility of the amount and timing of work center capacity to satisfy the master production schedule. There are several techniques available for preparing work center capacity plans under crisp environment, but there is a scarcity of technique available for finding the required capacity in terms of labor hours under fuzzy environment. In the present thesis, we analyze the Bill of Labor (BOL), Resource Profile (RP) and Capacity Requirements Planning (CRP) approaches under fuzzy environment with a variety of assumptions. Chapter 1 provides an introduction to the concepts of capacity planning problems considered in the thesis, followed by the literature survey in Chapter 2. The capacity analysis under fuzzy envi onment using BOL approach for rough cut capacity planning (RCCP) is considered in Chapter 3. Assuming that all the components of an item are manufactured in the same time period as the end item, i.e. lead-time offsets are considered to zero. Chapter 4 deals with the capacity analysis under fuzzy environment using RP approach for RCCP by including the lead-time dimension in it. Chapter 5 deals with the capacity requirements planning under fuzzy environment. Finally, conclusion, contribution and recommendations for further research on the aforementioned problems are presented in Chapter 6."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["6536361 bytes","184 bytes"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf","text/plain"]},{"key":"dc:title","label":"Title","values":["Capacity planning under fuzzy environment"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:creator":["Verma, Manoj Kumar"],"dc:date.accessioned":["2007-05-22T15:13:37Z"],"dc:date.available":["2007-05-22T15:13:37Z"],"dc:date.issued":["2001-04-01T00:00:00Z"],"dc:description.abstract":["In recent years, in manufacturing industry, their has been a great deal of interest in capacity planning because the focus is shifting on techniques that determine flexibility of the amount and timing of work center capacity to satisfy the master production schedule. There are several techniques available for preparing work center capacity plans under crisp environment, but there is a scarcity of technique available for finding the required capacity in terms of labor hours under fuzzy environment. In the present thesis, we analyze the Bill of Labor (BOL), Resource Profile (RP) and Capacity Requirements Planning (CRP) approaches under fuzzy environment with a variety of assumptions. Chapter 1 provides an introduction to the concepts of capacity planning problems considered in the thesis, followed by the literature survey in Chapter 2. The capacity analysis under fuzzy envi onment using BOL approach for rough cut capacity planning (RCCP) is considered in Chapter 3. Assuming that all the components of an item are manufactured in the same time period as the end item, i.e. lead-time offsets are considered to zero. Chapter 4 deals with the capacity analysis under fuzzy environment using RP approach for RCCP by including the lead-time dimension in it. Chapter 5 deals with the capacity requirements planning under fuzzy environment. Finally, conclusion, contribution and recommendations for further research on the aforementioned problems are presented in Chapter 6."],"dc:format.extent":["6536361 bytes","184 bytes"],"dc:format.mimetype":["application/pdf","text/plain"],"dc:identifier.uri":["http://hdl.handle.net/1993/2026"],"dc:language.iso":["eng"],"dc:title":["Capacity planning under fuzzy environment"],"dc:type":["master thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Mechanical and Manufacturing Engineering"],"thesis:degree_level":["Master of Science (M.Sc.)"]},"updated_at":"2026-11-19T09:02:53Z"}