{"id":{"repo_id":"manitoba","oai_identifier":"oai:mspace.lib.umanitoba.ca:1993/32650"},"canonical_url":"https://search.ndltd.org/etd/manitoba/oai:mspace.lib.umanitoba.ca:1993/32650","repository":{"repo_id":"manitoba","name":"University of Manitoba","base_url":"https://mspace.lib.umanitoba.ca/oai/request"},"display":{"title":"Single Machine with Two-agent Scheduling Problem","abstract":"Scheduling problems have been studied for many years for optimizing resource allocation as scheduling plays a critical role in many manufacturing and service industries. During last two decades, two-agent scheduling problems have been used in many systems, such as railroad allocation system, aircraft landing system and so on. This thesis considers various two-agent scheduling problems with a single machine, which is responsible for processing jobs from two agents. The research of single machine with two-agent scheduling models can be classified into two main categories: minimality model and feasibility model. The feasibility model based two-agent scheduling problems are studied in this thesis. In a feasibility model, the scheduling problem is objective to minimize the objective function of one agent while keeping the objective function of the other agent within a pre-specified level. In the present thesis, mathematical models, heuristics, and Ant Colony Optimization based meta-heuristics are proposed for solving the problems studied in this thesis. Furthermore, this thesis also provides a detailed and systemic survey (literature review) of the two-agent scheduling problem literature on models with a given due date. In the chapter of survey of two-agent scheduling problems with due date, the computational complexity and proposed algorithms for the due-date-related two-agent scheduling problems are list. The two-agent scheduling problems studied and proposed algorithms in this thesis are extremely useful for improving the productivity and efficiency of the manufacturing environment in a supply chain system.","abstract_html":"Scheduling problems have been studied for many years for optimizing resource allocation as scheduling plays a critical role in many manufacturing and service industries. During last two decades, two-agent scheduling problems have been used in many systems, such as railroad allocation system, aircraft landing system and so on. This thesis considers various two-agent scheduling problems with a single machine, which is responsible for processing jobs from two agents. The research of single machine with two-agent scheduling models can be classified into two main categories: minimality model and feasibility model. The feasibility model based two-agent scheduling problems are studied in this thesis. In a feasibility model, the scheduling problem is objective to minimize the objective function of one agent while keeping the objective function of the other agent within a pre-specified level. In the present thesis, mathematical models, heuristics, and Ant Colony Optimization based meta-heuristics are proposed for solving the problems studied in this thesis. Furthermore, this thesis also provides a detailed and systemic survey (literature review) of the two-agent scheduling problem literature on models with a given due date. In the chapter of survey of two-agent scheduling problems with due date, the computational complexity and proposed algorithms for the due-date-related two-agent scheduling problems are list. The two-agent scheduling problems studied and proposed algorithms in this thesis are extremely useful for improving the productivity and efficiency of the manufacturing environment in a supply chain system.","abstract_has_math":false,"creators":["Li, Hongwei"],"institution":"Lecture Notes in Management Science","degree_name":null,"degree_level":"Master of Science (M.Sc.)","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Gajpal, Yuvraj (Supply Chain Management) Bector, C.R. (Supply Chain Management)"],"committee_chairs":[],"committee_members":["Appadoo, Srimantoorao (Supply Chain Management)","Thulasiraman, Parimala (Computer Science)"],"year":2016,"date_issued":"2016","date_published":"2016","updated_at":"2026-11-19T09:14:08Z","subjects":["Scheduling Problem","Two-agent","Algorithm","Completion Time","Due date"],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["Gajpal, Y., & Li, H. (2016). Single machine scheduling with two agents for total completion time objectives☆. Lecture Notes in Management Science, 8, 107."],"render_values":[{"text":"Gajpal, Y., & Li, H. (2016). Single machine scheduling with two agents for total completion time objectives☆. Lecture Notes in Management Science, 8, 107.","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1993/32650","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1993/32650","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amanitoba%3Aoai%3Amspace.lib.umanitoba.ca%3A1993%2F32650","prefix":"oai_dc"},"source_record":{"url":"https://mspace.lib.umanitoba.ca/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Amspace.lib.umanitoba.ca%3A1993%2F32650","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Appadoo, Srimantoorao (Supply Chain Management)","Thulasiraman, Parimala (Computer Science)"]},{"key":"dc:contributor.supervisor","label":"Supervisor","values":["Gajpal, Yuvraj (Supply Chain Management) Bector, C.R. (Supply Chain Management)"]},{"key":"dc:creator","label":"Author","values":["Li, Hongwei"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2017-09-27T15:16:50Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2017-09-27T15:16:50Z"]},{"key":"dc:date.issued","label":"Date","values":["2016"]},{"key":"dc:publisher","label":"Institution","values":["Lecture Notes in Management Science"]},{"key":"dc:type","label":"Dc Type","values":["master thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Master of Science (M.Sc.)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Scheduling Problem","Two-agent","Algorithm","Completion Time","Due date"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["Gajpal, Y., & Li, H. (2016). Single machine scheduling with two agents for total completion time objectives☆. Lecture Notes in Management Science, 8, 107."]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1993/32650"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Scheduling problems have been studied for many years for optimizing resource allocation as scheduling plays a critical role in many manufacturing and service industries. During last two decades, two-agent scheduling problems have been used in many systems, such as railroad allocation system, aircraft landing system and so on. This thesis considers various two-agent scheduling problems with a single machine, which is responsible for processing jobs from two agents. The research of single machine with two-agent scheduling models can be classified into two main categories: minimality model and feasibility model. The feasibility model based two-agent scheduling problems are studied in this thesis. In a feasibility model, the scheduling problem is objective to minimize the objective function of one agent while keeping the objective function of the other agent within a pre-specified level. In the present thesis, mathematical models, heuristics, and Ant Colony Optimization based meta-heuristics are proposed for solving the problems studied in this thesis. Furthermore, this thesis also provides a detailed and systemic survey (literature review) of the two-agent scheduling problem literature on models with a given due date. In the chapter of survey of two-agent scheduling problems with due date, the computational complexity and proposed algorithms for the due-date-related two-agent scheduling problems are list. The two-agent scheduling problems studied and proposed algorithms in this thesis are extremely useful for improving the productivity and efficiency of the manufacturing environment in a supply chain system."]},{"key":"dc:description.note","label":"Dc Description Note","values":["February 2018"]},{"key":"dc:title","label":"Title","values":["Single Machine with Two-agent Scheduling Problem"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.committeemember":["Appadoo, Srimantoorao (Supply Chain Management)","Thulasiraman, Parimala (Computer Science)"],"dc:contributor.supervisor":["Gajpal, Yuvraj (Supply Chain Management) Bector, C.R. (Supply Chain Management)"],"dc:creator":["Li, Hongwei"],"dc:date.accessioned":["2017-09-27T15:16:50Z"],"dc:date.available":["2017-09-27T15:16:50Z"],"dc:date.issued":["2016"],"dc:description.abstract":["Scheduling problems have been studied for many years for optimizing resource allocation as scheduling plays a critical role in many manufacturing and service industries. During last two decades, two-agent scheduling problems have been used in many systems, such as railroad allocation system, aircraft landing system and so on. This thesis considers various two-agent scheduling problems with a single machine, which is responsible for processing jobs from two agents. The research of single machine with two-agent scheduling models can be classified into two main categories: minimality model and feasibility model. The feasibility model based two-agent scheduling problems are studied in this thesis. In a feasibility model, the scheduling problem is objective to minimize the objective function of one agent while keeping the objective function of the other agent within a pre-specified level. In the present thesis, mathematical models, heuristics, and Ant Colony Optimization based meta-heuristics are proposed for solving the problems studied in this thesis. Furthermore, this thesis also provides a detailed and systemic survey (literature review) of the two-agent scheduling problem literature on models with a given due date. In the chapter of survey of two-agent scheduling problems with due date, the computational complexity and proposed algorithms for the due-date-related two-agent scheduling problems are list. The two-agent scheduling problems studied and proposed algorithms in this thesis are extremely useful for improving the productivity and efficiency of the manufacturing environment in a supply chain system."],"dc:description.note":["February 2018"],"dc:identifier.citation":["Gajpal, Y., & Li, H. (2016). Single machine scheduling with two agents for total completion time objectives☆. Lecture Notes in Management Science, 8, 107."],"dc:identifier.uri":["http://hdl.handle.net/1993/32650"],"dc:language.iso":["eng"],"dc:publisher":["Lecture Notes in Management Science"],"dc:subject":["Scheduling Problem","Two-agent","Algorithm","Completion Time","Due date"],"dc:title":["Single Machine with Two-agent Scheduling Problem"],"dc:type":["master thesis"],"others:access_status":["open.access"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Master of Science (M.Sc.)"]},"updated_at":"2026-11-19T09:14:08Z"}