{"id":{"repo_id":"maryland","oai_identifier":"oai:drum.lib.umd.edu:1903/114"},"canonical_url":"https://search.ndltd.org/etd/maryland/oai:drum.lib.umd.edu:1903/114","repository":{"repo_id":"maryland","name":"University of Maryland","base_url":"https://api.drum.lib.umd.edu/server/oai/request"},"display":{"title":"The Evaluation of a Performance-Based Design Process for a Hotel Building: The Comparison of Two Egress Models","abstract":"This work emphasizes the importance for egress model users to choose a model for each project with the appropriate input features and simulation capabilities. This report also gives model users a mechanism for choosing the appropriate model by providing a detailed egress model review (Chapter 2). Specifically this report focuses on the ability of two egress models, EXIT89 and Simulex, to simulate a high-rise hotel building evacuation. When EXIT89 and Simulex are used to 1) simulate the same design scenarios and 2) perform a bounding analysis of the hotel building, significant differences in egress times were identified. EXIT89's evacuation times were found to be 25-40% lower than Simulex for the design scenarios, attributed to differences in unimpeded speeds, movement algorithms, methods of simulating slow occupants, density in the stairs, and stair configuration input between the models. For the bounding analysis, EXIT89 produced maximum evacuation times 30-40% lower than Simulex.","abstract_html":"This work emphasizes the importance for egress model users to choose a model for each project with the appropriate input features and simulation capabilities. This report also gives model users a mechanism for choosing the appropriate model by providing a detailed egress model review (Chapter 2). Specifically this report focuses on the ability of two egress models, EXIT89 and Simulex, to simulate a high-rise hotel building evacuation. When EXIT89 and Simulex are used to 1) simulate the same design scenarios and 2) perform a bounding analysis of the hotel building, significant differences in egress times were identified. EXIT89&#x27;s evacuation times were found to be 25-40% lower than Simulex for the design scenarios, attributed to differences in unimpeded speeds, movement algorithms, methods of simulating slow occupants, density in the stairs, and stair configuration input between the models. For the bounding analysis, EXIT89 produced maximum evacuation times 30-40% lower than Simulex.","abstract_has_math":false,"creators":["Kuligowski, Erica Dawn"],"institution":null,"degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Fire Protection Engineering","school":null,"contributors":[],"advisors":["Milke, James A","Bryan, John L","Notarianni, Kathy A"],"committee_chairs":[],"committee_members":[],"year":2003,"date_issued":"2003-12-15","date_published":"2003-12-15","updated_at":"2026-11-19T08:49:45Z","subjects":[],"languages":["en_US"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1903/114","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1903/114","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amaryland%3Aoai%3Adrum.lib.umd.edu%3A1903%2F114","prefix":"oai_dc"},"source_record":{"url":"https://api.drum.lib.umd.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adrum.lib.umd.edu%3A1903%2F114","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Milke, James A","Bryan, John L","Notarianni, Kathy A"]},{"key":"dc:contributor.department","label":"Department","values":["Fire Protection Engineering"]},{"key":"dc:creator","label":"Author","values":["Kuligowski, Erica Dawn"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2004-05-31T19:50:29Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2004-05-31T19:50:29Z"]},{"key":"dc:date.issued","label":"Date","values":["2003-12-15"]},{"key":"dc:relation","label":"Dc Relation","values":["Digital Repository at the University of Maryland","University of Maryland (College Park, Md.)"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.proquest","label":"Dc Subject Proquest","values":["Engineering, General"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1903/114"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This work emphasizes the importance for egress model users to choose a model for each project with the appropriate input features and simulation capabilities. This report also gives model users a mechanism for choosing the appropriate model by providing a detailed egress model review (Chapter 2). Specifically this report focuses on the ability of two egress models, EXIT89 and Simulex, to simulate a high-rise hotel building evacuation. When EXIT89 and Simulex are used to 1) simulate the same design scenarios and 2) perform a bounding analysis of the hotel building, significant differences in egress times were identified. EXIT89's evacuation times were found to be 25-40% lower than Simulex for the design scenarios, attributed to differences in unimpeded speeds, movement algorithms, methods of simulating slow occupants, density in the stairs, and stair configuration input between the models. For the bounding analysis, EXIT89 produced maximum evacuation times 30-40% lower than Simulex."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["2520528 bytes"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["The Evaluation of a Performance-Based Design Process for a Hotel Building: The Comparison of Two Egress Models"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Milke, James A","Bryan, John L","Notarianni, Kathy A"],"dc:contributor.department":["Fire Protection Engineering"],"dc:creator":["Kuligowski, Erica Dawn"],"dc:date.accessioned":["2004-05-31T19:50:29Z"],"dc:date.available":["2004-05-31T19:50:29Z"],"dc:date.issued":["2003-12-15"],"dc:description.abstract":["This work emphasizes the importance for egress model users to choose a model for each project with the appropriate input features and simulation capabilities. This report also gives model users a mechanism for choosing the appropriate model by providing a detailed egress model review (Chapter 2). Specifically this report focuses on the ability of two egress models, EXIT89 and Simulex, to simulate a high-rise hotel building evacuation. When EXIT89 and Simulex are used to 1) simulate the same design scenarios and 2) perform a bounding analysis of the hotel building, significant differences in egress times were identified. EXIT89's evacuation times were found to be 25-40% lower than Simulex for the design scenarios, attributed to differences in unimpeded speeds, movement algorithms, methods of simulating slow occupants, density in the stairs, and stair configuration input between the models. For the bounding analysis, EXIT89 produced maximum evacuation times 30-40% lower than Simulex."],"dc:format.extent":["2520528 bytes"],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/1903/114"],"dc:language.iso":["en_US"],"dc:relation":["Digital Repository at the University of Maryland","University of Maryland (College Park, Md.)"],"dc:subject.proquest":["Engineering, General"],"dc:title":["The Evaluation of a Performance-Based Design Process for a Hotel Building: The Comparison of Two Egress Models"],"dc:type":["Thesis"],"others:access_status":["open.access"]},"updated_at":"2026-11-19T08:49:45Z"}