{"id":{"repo_id":"maryland","oai_identifier":"oai:drum.lib.umd.edu:1903/2173"},"canonical_url":"https://search.ndltd.org/etd/maryland/oai:drum.lib.umd.edu:1903/2173","repository":{"repo_id":"maryland","name":"University of Maryland","base_url":"https://api.drum.lib.umd.edu/server/oai/request"},"display":{"title":"The Quick Time Dependent Quickest Flow Problem: A Lesson in Zero-Sum Cycles","abstract":"A quick solution technique for the integral time-dependent quickest flow problem with no waiting is presented. The proposed technique is based on the successive shortest path approach and modifies an existing algorithm to improve its average performance. At each iteration, a reoptimization procedure is employed to determine the augmenting path given updates to the residual graph. The residual graph, by construction, almost always contains zero-sum cycles when employed in this context. These zero-sum cycles pose a unique problem for the reoptimization technique. A heuristic that can be embedded in the reoptimization algorithm to provide path solutions in the presence of zero-sum cycles has been proposed. In the computational experiments, the heuristic provided an optimal solution nearly 100% of the times. Further, a modified implementation of an existing path-finding algorithm has been used to solve the time-dependent quickest flow problem with source waiting.","abstract_html":"A quick solution technique for the integral time-dependent quickest flow problem with no waiting is presented. The proposed technique is based on the successive shortest path approach and modifies an existing algorithm to improve its average performance. At each iteration, a reoptimization procedure is employed to determine the augmenting path given updates to the residual graph. The residual graph, by construction, almost always contains zero-sum cycles when employed in this context. These zero-sum cycles pose a unique problem for the reoptimization technique. A heuristic that can be embedded in the reoptimization algorithm to provide path solutions in the presence of zero-sum cycles has been proposed. In the computational experiments, the heuristic provided an optimal solution nearly 100% of the times. Further, a modified implementation of an existing path-finding algorithm has been used to solve the time-dependent quickest flow problem with source waiting.","abstract_has_math":false,"creators":["Dhundia, Harsh"],"institution":"Digital Repository at the University of Maryland","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Civil Engineering","school":null,"contributors":[],"advisors":["Miller-Hooks, Elise D"],"committee_chairs":[],"committee_members":[],"year":2005,"date_issued":"2005-01-03","date_published":"2005-01-03","updated_at":"2026-11-19T08:55:18Z","subjects":[],"languages":["en_US"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1903/2173","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1903/2173","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amaryland%3Aoai%3Adrum.lib.umd.edu%3A1903%2F2173","prefix":"oai_dc"},"source_record":{"url":"https://api.drum.lib.umd.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adrum.lib.umd.edu%3A1903%2F2173","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Miller-Hooks, Elise D"]},{"key":"dc:contributor.department","label":"Department","values":["Civil Engineering"]},{"key":"dc:creator","label":"Author","values":["Dhundia, Harsh"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2005-02-02T06:59:50Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2005-02-02T06:59:50Z"]},{"key":"dc:date.issued","label":"Date","values":["2005-01-03"]},{"key":"dc:publisher","label":"Institution","values":["Digital Repository at the University of Maryland","University of Maryland (College Park, Md.)"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["successive shortest path","reoptimization","residual graph","zero-sum cycle"]},{"key":"dc:subject.proquest","label":"Dc Subject Proquest","values":["Engineering, Civil","Operations Research","Engineering, Industrial"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1903/2173"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["A quick solution technique for the integral time-dependent quickest flow problem with no waiting is presented. The proposed technique is based on the successive shortest path approach and modifies an existing algorithm to improve its average performance. At each iteration, a reoptimization procedure is employed to determine the augmenting path given updates to the residual graph. The residual graph, by construction, almost always contains zero-sum cycles when employed in this context. These zero-sum cycles pose a unique problem for the reoptimization technique. A heuristic that can be embedded in the reoptimization algorithm to provide path solutions in the presence of zero-sum cycles has been proposed. In the computational experiments, the heuristic provided an optimal solution nearly 100% of the times. Further, a modified implementation of an existing path-finding algorithm has been used to solve the time-dependent quickest flow problem with source waiting."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["403978 bytes"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["The Quick Time Dependent Quickest Flow Problem: A Lesson in Zero-Sum Cycles"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Miller-Hooks, Elise D"],"dc:contributor.department":["Civil Engineering"],"dc:creator":["Dhundia, Harsh"],"dc:date.accessioned":["2005-02-02T06:59:50Z"],"dc:date.available":["2005-02-02T06:59:50Z"],"dc:date.issued":["2005-01-03"],"dc:description.abstract":["A quick solution technique for the integral time-dependent quickest flow problem with no waiting is presented. The proposed technique is based on the successive shortest path approach and modifies an existing algorithm to improve its average performance. At each iteration, a reoptimization procedure is employed to determine the augmenting path given updates to the residual graph. The residual graph, by construction, almost always contains zero-sum cycles when employed in this context. These zero-sum cycles pose a unique problem for the reoptimization technique. A heuristic that can be embedded in the reoptimization algorithm to provide path solutions in the presence of zero-sum cycles has been proposed. In the computational experiments, the heuristic provided an optimal solution nearly 100% of the times. Further, a modified implementation of an existing path-finding algorithm has been used to solve the time-dependent quickest flow problem with source waiting."],"dc:format.extent":["403978 bytes"],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/1903/2173"],"dc:language.iso":["en_US"],"dc:publisher":["Digital Repository at the University of Maryland","University of Maryland (College Park, Md.)"],"dc:subject.keyword":["successive shortest path","reoptimization","residual graph","zero-sum cycle"],"dc:subject.proquest":["Engineering, Civil","Operations Research","Engineering, Industrial"],"dc:title":["The Quick Time Dependent Quickest Flow Problem: A Lesson in Zero-Sum Cycles"],"dc:type":["Thesis"],"others:access_status":["open.access"]},"updated_at":"2026-11-19T08:55:18Z"}