{"id":{"repo_id":"maryland","oai_identifier":"oai:drum.lib.umd.edu:1903/6912"},"canonical_url":"https://search.ndltd.org/etd/maryland/oai:drum.lib.umd.edu:1903/6912","repository":{"repo_id":"maryland","name":"University of Maryland","base_url":"https://api.drum.lib.umd.edu/server/oai/request"},"display":{"title":"Estimation of the Time of Concentration with High-Resolution GIS Data: Limitations of Existing Methods and Analysis of New Methods.","abstract":"Differences in the calculation of the time of concentration using the velocity method result from different degrees of discretization along the longest flowpath in the watershed. We examined an idealized system for which an analytical solution could be derived. Next, we studied a dataset compiled from watersheds across the State of Maryland, for which the observed time of concentration was known. In both cases we show that the time of concentration estimate increases with the degree of discretization. Two different models were developed that show good predictive agreement with the observed time of concentration. One method uses, gradually varied flow concepts to allow velocity to vary more realistically along the discretized flowpath. The other method uses a regression approach to guide the merging of GIS pixel-based flowpath elements into larger segments. Strengths and limitations of both methods are discussed in the context of future application in Maryland and elsewhere.","abstract_html":"Differences in the calculation of the time of concentration using the velocity method result from different degrees of discretization along the longest flowpath in the watershed. We examined an idealized system for which an analytical solution could be derived. Next, we studied a dataset compiled from watersheds across the State of Maryland, for which the observed time of concentration was known. In both cases we show that the time of concentration estimate increases with the degree of discretization. Two different models were developed that show good predictive agreement with the observed time of concentration. One method uses, gradually varied flow concepts to allow velocity to vary more realistically along the discretized flowpath. The other method uses a regression approach to guide the merging of GIS pixel-based flowpath elements into larger segments. Strengths and limitations of both methods are discussed in the context of future application in Maryland and elsewhere.","abstract_has_math":false,"creators":["Pavlovic, Sandra"],"institution":"Digital Repository at the University of Maryland","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Civil Engineering","school":null,"contributors":[],"advisors":["Moglen, Glenn E."],"committee_chairs":[],"committee_members":[],"year":2007,"date_issued":"2007-05-02","date_published":"2007-05-02","updated_at":"2026-11-19T08:43:13Z","subjects":[],"languages":["en_US"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1903/6912","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1903/6912","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amaryland%3Aoai%3Adrum.lib.umd.edu%3A1903%2F6912","prefix":"oai_dc"},"source_record":{"url":"https://api.drum.lib.umd.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adrum.lib.umd.edu%3A1903%2F6912","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Moglen, Glenn E."]},{"key":"dc:contributor.department","label":"Department","values":["Civil Engineering"]},{"key":"dc:creator","label":"Author","values":["Pavlovic, Sandra"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2007-06-22T05:37:09Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2007-06-22T05:37:09Z"]},{"key":"dc:date.issued","label":"Date","values":["2007-05-02"]},{"key":"dc:publisher","label":"Institution","values":["Digital Repository at the University of Maryland","University of Maryland (College Park, Md.)"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["DEM","discretization","Geographic Information System (GIS)","slope","time of concentration","velocity method","NRCS/SCS method."]},{"key":"dc:subject.proquest","label":"Dc Subject Proquest","values":["Engineering, Civil"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1903/6912"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Differences in the calculation of the time of concentration using the velocity method result from different degrees of discretization along the longest flowpath in the watershed. We examined an idealized system for which an analytical solution could be derived. Next, we studied a dataset compiled from watersheds across the State of Maryland, for which the observed time of concentration was known. In both cases we show that the time of concentration estimate increases with the degree of discretization. Two different models were developed that show good predictive agreement with the observed time of concentration. One method uses, gradually varied flow concepts to allow velocity to vary more realistically along the discretized flowpath. The other method uses a regression approach to guide the merging of GIS pixel-based flowpath elements into larger segments. Strengths and limitations of both methods are discussed in the context of future application in Maryland and elsewhere."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["1244218 bytes"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Estimation of the Time of Concentration with High-Resolution GIS Data: Limitations of Existing Methods and Analysis of New Methods."]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Moglen, Glenn E."],"dc:contributor.department":["Civil Engineering"],"dc:creator":["Pavlovic, Sandra"],"dc:date.accessioned":["2007-06-22T05:37:09Z"],"dc:date.available":["2007-06-22T05:37:09Z"],"dc:date.issued":["2007-05-02"],"dc:description.abstract":["Differences in the calculation of the time of concentration using the velocity method result from different degrees of discretization along the longest flowpath in the watershed. We examined an idealized system for which an analytical solution could be derived. Next, we studied a dataset compiled from watersheds across the State of Maryland, for which the observed time of concentration was known. In both cases we show that the time of concentration estimate increases with the degree of discretization. Two different models were developed that show good predictive agreement with the observed time of concentration. One method uses, gradually varied flow concepts to allow velocity to vary more realistically along the discretized flowpath. The other method uses a regression approach to guide the merging of GIS pixel-based flowpath elements into larger segments. Strengths and limitations of both methods are discussed in the context of future application in Maryland and elsewhere."],"dc:format.extent":["1244218 bytes"],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/1903/6912"],"dc:language.iso":["en_US"],"dc:publisher":["Digital Repository at the University of Maryland","University of Maryland (College Park, Md.)"],"dc:subject.keyword":["DEM","discretization","Geographic Information System (GIS)","slope","time of concentration","velocity method","NRCS/SCS method."],"dc:subject.proquest":["Engineering, Civil"],"dc:title":["Estimation of the Time of Concentration with High-Resolution GIS Data: Limitations of Existing Methods and Analysis of New Methods."],"dc:type":["Thesis"],"others:access_status":["open.access"]},"updated_at":"2026-11-19T08:43:13Z"}