{"id":{"repo_id":"maryland","oai_identifier":"oai:drum.lib.umd.edu:1903/7375"},"canonical_url":"https://search.ndltd.org/etd/maryland/oai:drum.lib.umd.edu:1903/7375","repository":{"repo_id":"maryland","name":"University of Maryland","base_url":"https://api.drum.lib.umd.edu/server/oai/request"},"display":{"title":"Phased Development of Rail Transit Routes","abstract":"This thesis develops a method for optimizing the construction phases for rail transit extension projects with the objective of maximizing net present worth and examines the economic feasibility of such extension projects under different financial constraints. A Simulated Annealing Algorithm is used for solving this problem. A rail transit project is often divided into several phases due to its huge capital costs. A model is developed to optimize these phases for a simple, one-route rail transit system, running from a Central Business District to a suburban area. The most interesting result indicates that the economic feasibility of links with low demand is affected by the completion time of those links and their demand growth rate after extensions. Sensitivity analyses explore the effects of input parameters on optimized results. These analyses contribute useful guidelines for transportation planners and decision-makers in determining construction phases for rail transit extension projects.","abstract_html":"This thesis develops a method for optimizing the construction phases for rail transit extension projects with the objective of maximizing net present worth and examines the economic feasibility of such extension projects under different financial constraints. A Simulated Annealing Algorithm is used for solving this problem. A rail transit project is often divided into several phases due to its huge capital costs. A model is developed to optimize these phases for a simple, one-route rail transit system, running from a Central Business District to a suburban area. The most interesting result indicates that the economic feasibility of links with low demand is affected by the completion time of those links and their demand growth rate after extensions. Sensitivity analyses explore the effects of input parameters on optimized results. These analyses contribute useful guidelines for transportation planners and decision-makers in determining construction phases for rail transit extension projects.","abstract_has_math":false,"creators":["CHENG, WEI-CHEN"],"institution":"Digital Repository at the University of Maryland","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Civil Engineering","school":null,"contributors":[],"advisors":["Schonfeld, Paul M"],"committee_chairs":[],"committee_members":[],"year":2007,"date_issued":"2007-08-10","date_published":"2007-08-10","updated_at":"2026-11-19T08:54:47Z","subjects":[],"languages":["en_US"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1903/7375","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1903/7375","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amaryland%3Aoai%3Adrum.lib.umd.edu%3A1903%2F7375","prefix":"oai_dc"},"source_record":{"url":"https://api.drum.lib.umd.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adrum.lib.umd.edu%3A1903%2F7375","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Schonfeld, Paul M"]},{"key":"dc:contributor.department","label":"Department","values":["Civil Engineering"]},{"key":"dc:creator","label":"Author","values":["CHENG, WEI-CHEN"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2007-09-28T15:02:29Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2007-09-28T15:02:29Z"]},{"key":"dc:date.issued","label":"Date","values":["2007-08-10"]},{"key":"dc:publisher","label":"Institution","values":["Digital Repository at the University of Maryland","University of Maryland (College Park, Md.)"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["transit planning","scheduling","phased development"]},{"key":"dc:subject.proquest","label":"Dc Subject Proquest","values":["Engineering, Civil"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1903/7375"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis develops a method for optimizing the construction phases for rail transit extension projects with the objective of maximizing net present worth and examines the economic feasibility of such extension projects under different financial constraints. A Simulated Annealing Algorithm is used for solving this problem. A rail transit project is often divided into several phases due to its huge capital costs. A model is developed to optimize these phases for a simple, one-route rail transit system, running from a Central Business District to a suburban area. The most interesting result indicates that the economic feasibility of links with low demand is affected by the completion time of those links and their demand growth rate after extensions. Sensitivity analyses explore the effects of input parameters on optimized results. These analyses contribute useful guidelines for transportation planners and decision-makers in determining construction phases for rail transit extension projects."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["1635036 bytes"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Phased Development of Rail Transit Routes"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Schonfeld, Paul M"],"dc:contributor.department":["Civil Engineering"],"dc:creator":["CHENG, WEI-CHEN"],"dc:date.accessioned":["2007-09-28T15:02:29Z"],"dc:date.available":["2007-09-28T15:02:29Z"],"dc:date.issued":["2007-08-10"],"dc:description.abstract":["This thesis develops a method for optimizing the construction phases for rail transit extension projects with the objective of maximizing net present worth and examines the economic feasibility of such extension projects under different financial constraints. A Simulated Annealing Algorithm is used for solving this problem. A rail transit project is often divided into several phases due to its huge capital costs. A model is developed to optimize these phases for a simple, one-route rail transit system, running from a Central Business District to a suburban area. The most interesting result indicates that the economic feasibility of links with low demand is affected by the completion time of those links and their demand growth rate after extensions. Sensitivity analyses explore the effects of input parameters on optimized results. These analyses contribute useful guidelines for transportation planners and decision-makers in determining construction phases for rail transit extension projects."],"dc:format.extent":["1635036 bytes"],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/1903/7375"],"dc:language.iso":["en_US"],"dc:publisher":["Digital Repository at the University of Maryland","University of Maryland (College Park, Md.)"],"dc:subject.keyword":["transit planning","scheduling","phased development"],"dc:subject.proquest":["Engineering, Civil"],"dc:title":["Phased Development of Rail Transit Routes"],"dc:type":["Thesis"],"others:access_status":["open.access"]},"updated_at":"2026-11-19T08:54:47Z"}