{"id":{"repo_id":"maryland","oai_identifier":"oai:drum.lib.umd.edu:1903/7377"},"canonical_url":"https://search.ndltd.org/etd/maryland/oai:drum.lib.umd.edu:1903/7377","repository":{"repo_id":"maryland","name":"University of Maryland","base_url":"https://api.drum.lib.umd.edu/server/oai/request"},"display":{"title":"Development and Evaluation of Algorithms for Scheduling Two Unrelated Parallel Processors","abstract":"Given a group of tasks and two non-identical processors with the ability to complete each task, how should the tasks be assigned to complete the group of tasks as quickly as possible? This thesis considers this unrelated parallel machine scheduling problem with the objective of minimizing the completion time of a group of tasks (the makespan) from the perspective of a local printed circuit board manufacturer. An analytical model representing the job dependent processing time for each manufacturing line is developed and actual job data supplied by the manufacturer is used for analysis. Two versions of a complete enumeration algorithm which identify the optimal assignment schedule are presented. Several classic assignment heuristics are considered with several additional heuristics developed as part of this work. The algorithms are evaluated and their performance compared for jobs built at the local manufacturing site. Finally, a cost-benefit tradeoff for the algorithms considered is presented.","abstract_html":"Given a group of tasks and two non-identical processors with the ability to complete each task, how should the tasks be assigned to complete the group of tasks as quickly as possible? This thesis considers this unrelated parallel machine scheduling problem with the objective of minimizing the completion time of a group of tasks (the makespan) from the perspective of a local printed circuit board manufacturer. An analytical model representing the job dependent processing time for each manufacturing line is developed and actual job data supplied by the manufacturer is used for analysis. Two versions of a complete enumeration algorithm which identify the optimal assignment schedule are presented. Several classic assignment heuristics are considered with several additional heuristics developed as part of this work. The algorithms are evaluated and their performance compared for jobs built at the local manufacturing site. Finally, a cost-benefit tradeoff for the algorithms considered is presented.","abstract_has_math":false,"creators":["Leber, Dennis D"],"institution":"Digital Repository at the University of Maryland","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Mechanical Engineering","school":null,"contributors":[],"advisors":["Herrmann, Jeffrey W"],"committee_chairs":[],"committee_members":[],"year":2007,"date_issued":"2007-08-09","date_published":"2007-08-09","updated_at":"2026-11-19T08:43:22Z","subjects":[],"languages":["en_US"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1903/7377","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1903/7377","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amaryland%3Aoai%3Adrum.lib.umd.edu%3A1903%2F7377","prefix":"oai_dc"},"source_record":{"url":"https://api.drum.lib.umd.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adrum.lib.umd.edu%3A1903%2F7377","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Herrmann, Jeffrey W"]},{"key":"dc:contributor.department","label":"Department","values":["Mechanical Engineering"]},{"key":"dc:creator","label":"Author","values":["Leber, Dennis D"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2007-09-28T15:02:32Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2007-09-28T15:02:32Z"]},{"key":"dc:date.issued","label":"Date","values":["2007-08-09"]},{"key":"dc:publisher","label":"Institution","values":["Digital Repository at the University of Maryland","University of Maryland (College Park, Md.)"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["unrelated parallel machine","scheduling","makespan","printed circuit board fabrication","scheduling heuristic","scheduling algorithm"]},{"key":"dc:subject.proquest","label":"Dc Subject Proquest","values":["Engineering, Industrial","Engineering, Mechanical","Operations Research"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en_US"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1903/7377"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Given a group of tasks and two non-identical processors with the ability to complete each task, how should the tasks be assigned to complete the group of tasks as quickly as possible? This thesis considers this unrelated parallel machine scheduling problem with the objective of minimizing the completion time of a group of tasks (the makespan) from the perspective of a local printed circuit board manufacturer. An analytical model representing the job dependent processing time for each manufacturing line is developed and actual job data supplied by the manufacturer is used for analysis. Two versions of a complete enumeration algorithm which identify the optimal assignment schedule are presented. Several classic assignment heuristics are considered with several additional heuristics developed as part of this work. The algorithms are evaluated and their performance compared for jobs built at the local manufacturing site. Finally, a cost-benefit tradeoff for the algorithms considered is presented."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["1345199 bytes"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Development and Evaluation of Algorithms for Scheduling Two Unrelated Parallel Processors"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Herrmann, Jeffrey W"],"dc:contributor.department":["Mechanical Engineering"],"dc:creator":["Leber, Dennis D"],"dc:date.accessioned":["2007-09-28T15:02:32Z"],"dc:date.available":["2007-09-28T15:02:32Z"],"dc:date.issued":["2007-08-09"],"dc:description.abstract":["Given a group of tasks and two non-identical processors with the ability to complete each task, how should the tasks be assigned to complete the group of tasks as quickly as possible? This thesis considers this unrelated parallel machine scheduling problem with the objective of minimizing the completion time of a group of tasks (the makespan) from the perspective of a local printed circuit board manufacturer. An analytical model representing the job dependent processing time for each manufacturing line is developed and actual job data supplied by the manufacturer is used for analysis. Two versions of a complete enumeration algorithm which identify the optimal assignment schedule are presented. Several classic assignment heuristics are considered with several additional heuristics developed as part of this work. The algorithms are evaluated and their performance compared for jobs built at the local manufacturing site. Finally, a cost-benefit tradeoff for the algorithms considered is presented."],"dc:format.extent":["1345199 bytes"],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["http://hdl.handle.net/1903/7377"],"dc:language.iso":["en_US"],"dc:publisher":["Digital Repository at the University of Maryland","University of Maryland (College Park, Md.)"],"dc:subject.keyword":["unrelated parallel machine","scheduling","makespan","printed circuit board fabrication","scheduling heuristic","scheduling algorithm"],"dc:subject.proquest":["Engineering, Industrial","Engineering, Mechanical","Operations Research"],"dc:title":["Development and Evaluation of Algorithms for Scheduling Two Unrelated Parallel Processors"],"dc:type":["Thesis"],"others:access_status":["open.access"]},"updated_at":"2026-11-19T08:43:22Z"}