{"id":{"repo_id":"maynooth","oai_identifier":"oai:mural.maynoothuniversity.ie:21202"},"canonical_url":"https://search.ndltd.org/etd/maynooth/oai:mural.maynoothuniversity.ie:21202","repository":{"repo_id":"maynooth","name":"National University of Ireland - Maynooth","base_url":"http://mural.maynoothuniversity.ie/cgi/oai2"},"display":{"title":"Temporary Organising and the Implementation of Large-Scale Projects: A Multiple Case Study.","abstract":"This thesis examines the relationship between temporary organising and institutional logics in large-scale project implementation, focusing on two cases: The Irish Rural Electrification Scheme, and Ireland’s National Electronic Health Record Programme. It analyses implementation processes in each case to understand how temporary organising interacts with prevailing institutional logics. Using a multiple case study design and a qualitative methodology, the research explores the complexities and dynamics of temporary organising. Based on insights from the two cases, it develops a novel categorisation of the temporary organising/institutional logic relationship as: Embedded, Constellated, or Decoupled, and identifies four key categories of implementation processes as: Compliance, Competence Building, Collaboration, and Cost (the 4Cs). The findings offer both theoretical contributions, advancing understanding of how temporary organising shapes and is shaped by institutional logics, and practical guidance for managing complex, time-bound projects across instances of temporary organising.","abstract_html":"This thesis examines the relationship between temporary organising and institutional logics in large-scale project implementation, focusing on two cases: The Irish Rural Electrification Scheme, and Ireland’s National Electronic Health Record Programme. It analyses implementation processes in each case to understand how temporary organising interacts with prevailing institutional logics. Using a multiple case study design and a qualitative methodology, the research explores the complexities and dynamics of temporary organising. Based on insights from the two cases, it develops a novel categorisation of the temporary organising/institutional logic relationship as: Embedded, Constellated, or Decoupled, and identifies four key categories of implementation processes as: Compliance, Competence Building, Collaboration, and Cost (the 4Cs). The findings offer both theoretical contributions, advancing understanding of how temporary organising shapes and is shaped by institutional logics, and practical guidance for managing complex, time-bound projects across instances of temporary organising.","abstract_has_math":false,"creators":["Finnegan, Harriet"],"institution":"National University of Ireland Maynooth;","degree_name":"phd","degree_level":"doctoral","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2025,"date_issued":"2025","date_published":"2025","updated_at":"2026-11-25T20:23:05Z","subjects":[],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://mural.maynoothuniversity.ie/id/eprint/21202/","outbound_label":"Repository record","outbound_source":"dc:identifier.uri","record_url":"https://mural.maynoothuniversity.ie/id/eprint/21202/","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amaynooth%3Aoai%3Amural.maynoothuniversity.ie%3A21202","prefix":"oai_dc"},"source_record":{"url":"http://mural.maynoothuniversity.ie/cgi/oai2?verb=GetRecord&metadataPrefix=uketd_dc&identifier=oai%3Amural.maynoothuniversity.ie%3A21202","prefix":"uketd_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Finnegan, Harriet"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2025"]},{"key":"dc:date.issued","label":"Date","values":["2025"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["National University of Ireland Maynooth;"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["doctoral"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["phd"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["en"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://mural.maynoothuniversity.ie/id/eprint/21202/"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis examines the relationship between temporary organising and institutional logics in large-scale project implementation, focusing on two cases: The Irish Rural Electrification Scheme, and Ireland’s National Electronic Health Record Programme. It analyses implementation processes in each case to understand how temporary organising interacts with prevailing institutional logics. Using a multiple case study design and a qualitative methodology, the research explores the complexities and dynamics of temporary organising. Based on insights from the two cases, it develops a novel categorisation of the temporary organising/institutional logic relationship as: Embedded, Constellated, or Decoupled, and identifies four key categories of implementation processes as: Compliance, Competence Building, Collaboration, and Cost (the 4Cs). The findings offer both theoretical contributions, advancing understanding of how temporary organising shapes and is shaped by institutional logics, and practical guidance for managing complex, time-bound projects across instances of temporary organising."]},{"key":"dc:format","label":"Dc Format","values":["text"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["public"]},{"key":"dc:title","label":"Title","values":["Temporary Organising and the Implementation of Large-Scale Projects: A Multiple Case Study."]}]}],"canonical_facts":{"dc:creator":["Finnegan, Harriet"],"dc:date":["2025"],"dc:date.issued":["2025"],"dc:description.abstract":["This thesis examines the relationship between temporary organising and institutional logics in large-scale project implementation, focusing on two cases: The Irish Rural Electrification Scheme, and Ireland’s National Electronic Health Record Programme. It analyses implementation processes in each case to understand how temporary organising interacts with prevailing institutional logics. Using a multiple case study design and a qualitative methodology, the research explores the complexities and dynamics of temporary organising. Based on insights from the two cases, it develops a novel categorisation of the temporary organising/institutional logic relationship as: Embedded, Constellated, or Decoupled, and identifies four key categories of implementation processes as: Compliance, Competence Building, Collaboration, and Cost (the 4Cs). The findings offer both theoretical contributions, advancing understanding of how temporary organising shapes and is shaped by institutional logics, and practical guidance for managing complex, time-bound projects across instances of temporary organising."],"dc:format":["text"],"dc:identifier.uri":["https://mural.maynoothuniversity.ie/id/eprint/21202/"],"dc:language":["en"],"dc:publisher.institution":["National University of Ireland Maynooth;"],"dcterms:accessrights":["public"],"dc:title":["Temporary Organising and the Implementation of Large-Scale Projects: A Multiple Case Study."],"dc:type":["Thesis"],"dc:type.qualificationlevel":["doctoral"],"dc:type.qualificationname":["phd"]},"updated_at":"2026-11-25T20:23:05Z"}