{"id":{"repo_id":"mcmaster","oai_identifier":"oai:macsphere.mcmaster.ca:11375/16095"},"canonical_url":"https://search.ndltd.org/etd/mcmaster/oai:macsphere.mcmaster.ca:11375/16095","repository":{"repo_id":"mcmaster","name":"McMaster University","base_url":"https://macsphere.mcmaster.ca/server/oai/request"},"display":{"title":"Optimal Scheduling of Converter Aisle Operation in a Nickel Smelting Plant","abstract":"The scheduling of the converter aisle of a nickel smelting plant is a non-trivial task with significant consequences to plant profitability and production. An optimization-based scheduling formulation is developed using a continuous-time paradigm to accurately represent event timings. The formulation accounts for environmental restrictions on sulfur dioxide emissions using event timing constraints. The formulation includes novel semi-continuous modeling to represent flash furnaces which operate with a continuous inlet flow and intermittent discrete material removal, as well as, a novel sequencing and symmetry-breaking scheme to account for identical units operating in parallel. A rolling horizon feature is included in the formulation to accommodate multi-period optimization. Tightening constraints are developed and used to improve the computational performance of the optimization and demonstrate the capacity of the proposed methodology to function as a real-time decision-support tool. A solution procedure is presented where an aggregate model is used to bound the objective function of the master problem in a two layer optimization scheme. Finally, a novel multi-tiered procedure is presented to enhance the optimization solution by re-optimizing for objectives of decreasing priority in order to minimize task start times and penalize deviations in the furnace flow rate. To address the closed-loop properties of scheduling, a reactive scheduling mechanism is included to allow for rescheduling to account the impact of process disturbances on the operating schedule. A methodology for reducing radical scheduling changes due to the optimization during reactive scheduling is presented. The reactive scheduling algorithm utilizes a tiered optimization approach that progressively increases the degrees of freedom available, as required, in order to achieve a feasible production schedule. The use of the reactive scheduling algorithm demonstrates the ability to reject disturbances and transition plant operation in an agile manner.","abstract_html":"The scheduling of the converter aisle of a nickel smelting plant is a non-trivial task with significant consequences to plant profitability and production. An optimization-based scheduling formulation is developed using a continuous-time paradigm to accurately represent event timings. The formulation accounts for environmental restrictions on sulfur dioxide emissions using event timing constraints. The formulation includes novel semi-continuous modeling to represent flash furnaces which operate with a continuous inlet flow and intermittent discrete material removal, as well as, a novel sequencing and symmetry-breaking scheme to account for identical units operating in parallel. A rolling horizon feature is included in the formulation to accommodate multi-period optimization. Tightening constraints are developed and used to improve the computational performance of the optimization and demonstrate the capacity of the proposed methodology to function as a real-time decision-support tool. A solution procedure is presented where an aggregate model is used to bound the objective function of the master problem in a two layer optimization scheme. Finally, a novel multi-tiered procedure is presented to enhance the optimization solution by re-optimizing for objectives of decreasing priority in order to minimize task start times and penalize deviations in the furnace flow rate. To address the closed-loop properties of scheduling, a reactive scheduling mechanism is included to allow for rescheduling to account the impact of process disturbances on the operating schedule. A methodology for reducing radical scheduling changes due to the optimization during reactive scheduling is presented. The reactive scheduling algorithm utilizes a tiered optimization approach that progressively increases the degrees of freedom available, as required, in order to achieve a feasible production schedule. The use of the reactive scheduling algorithm demonstrates the ability to reject disturbances and transition plant operation in an agile manner.","abstract_has_math":false,"creators":["Ewaschuk, Christopher"],"institution":null,"degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Chemical Engineering","school":null,"contributors":[],"advisors":["Swartz, Christopher"],"committee_chairs":[],"committee_members":[],"year":2014,"date_issued":"2014","date_published":"2014","updated_at":"2026-11-18T19:32:30Z","subjects":["Scheduling","Rolling-Horizon","Continuous-time formulation","Semi-continuous","Production Planning","Nickel Smelting Converting","Mixed-Integer Linear Programming","Tiered Optimization"],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://doi.org/10.71548/12149"],"render_values":[{"text":"https://doi.org/10.71548/12149","href":"https://doi.org/10.71548/12149","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/11375/16095","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/11375/16095","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://macsphere.mcmaster.ca/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Amacsphere.mcmaster.ca%3A11375%2F16095","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Swartz, Christopher"]},{"key":"dc:contributor.department","label":"Department","values":["Chemical Engineering"]},{"key":"dc:creator","label":"Author","values":["Ewaschuk, Christopher"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-10-14T20:24:45Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-10-14T20:24:45Z"]},{"key":"dc:date.issued","label":"Date","values":["2014"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Scheduling","Rolling-Horizon","Continuous-time formulation","Semi-continuous","Production Planning","Nickel Smelting Converting","Mixed-Integer Linear Programming","Tiered Optimization"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/11375/16095","https://doi.org/10.71548/12149"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The scheduling of the converter aisle of a nickel smelting plant is a non-trivial task with significant consequences to plant profitability and production. An optimization-based scheduling formulation is developed using a continuous-time paradigm to accurately represent event timings. The formulation accounts for environmental restrictions on sulfur dioxide emissions using event timing constraints. The formulation includes novel semi-continuous modeling to represent flash furnaces which operate with a continuous inlet flow and intermittent discrete material removal, as well as, a novel sequencing and symmetry-breaking scheme to account for identical units operating in parallel. A rolling horizon feature is included in the formulation to accommodate multi-period optimization. Tightening constraints are developed and used to improve the computational performance of the optimization and demonstrate the capacity of the proposed methodology to function as a real-time decision-support tool. A solution procedure is presented where an aggregate model is used to bound the objective function of the master problem in a two layer optimization scheme. Finally, a novel multi-tiered procedure is presented to enhance the optimization solution by re-optimizing for objectives of decreasing priority in order to minimize task start times and penalize deviations in the furnace flow rate. To address the closed-loop properties of scheduling, a reactive scheduling mechanism is included to allow for rescheduling to account the impact of process disturbances on the operating schedule. A methodology for reducing radical scheduling changes due to the optimization during reactive scheduling is presented. The reactive scheduling algorithm utilizes a tiered optimization approach that progressively increases the degrees of freedom available, as required, in order to achieve a feasible production schedule. The use of the reactive scheduling algorithm demonstrates the ability to reject disturbances and transition plant operation in an agile manner."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Applied Science (MASc)"]},{"key":"dc:title","label":"Title","values":["Optimal Scheduling of Converter Aisle Operation in a Nickel Smelting Plant"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Swartz, Christopher"],"dc:contributor.department":["Chemical Engineering"],"dc:creator":["Ewaschuk, Christopher"],"dc:date.accessioned":["2014-10-14T20:24:45Z"],"dc:date.available":["2014-10-14T20:24:45Z"],"dc:date.issued":["2014"],"dc:description.abstract":["The scheduling of the converter aisle of a nickel smelting plant is a non-trivial task with significant consequences to plant profitability and production. An optimization-based scheduling formulation is developed using a continuous-time paradigm to accurately represent event timings. The formulation accounts for environmental restrictions on sulfur dioxide emissions using event timing constraints. The formulation includes novel semi-continuous modeling to represent flash furnaces which operate with a continuous inlet flow and intermittent discrete material removal, as well as, a novel sequencing and symmetry-breaking scheme to account for identical units operating in parallel. A rolling horizon feature is included in the formulation to accommodate multi-period optimization. Tightening constraints are developed and used to improve the computational performance of the optimization and demonstrate the capacity of the proposed methodology to function as a real-time decision-support tool. A solution procedure is presented where an aggregate model is used to bound the objective function of the master problem in a two layer optimization scheme. Finally, a novel multi-tiered procedure is presented to enhance the optimization solution by re-optimizing for objectives of decreasing priority in order to minimize task start times and penalize deviations in the furnace flow rate. To address the closed-loop properties of scheduling, a reactive scheduling mechanism is included to allow for rescheduling to account the impact of process disturbances on the operating schedule. A methodology for reducing radical scheduling changes due to the optimization during reactive scheduling is presented. The reactive scheduling algorithm utilizes a tiered optimization approach that progressively increases the degrees of freedom available, as required, in order to achieve a feasible production schedule. The use of the reactive scheduling algorithm demonstrates the ability to reject disturbances and transition plant operation in an agile manner."],"dc:description.degree":["Master of Applied Science (MASc)"],"dc:identifier.uri":["http://hdl.handle.net/11375/16095","https://doi.org/10.71548/12149"],"dc:language.iso":["en"],"dc:subject":["Scheduling","Rolling-Horizon","Continuous-time formulation","Semi-continuous","Production Planning","Nickel Smelting Converting","Mixed-Integer Linear Programming","Tiered Optimization"],"dc:title":["Optimal Scheduling of Converter Aisle Operation in a Nickel Smelting Plant"],"dc:type":["Thesis"],"others:access_status":["open.access"]},"updated_at":"2026-11-18T19:32:30Z"}