{"id":{"repo_id":"mcmaster","oai_identifier":"oai:macsphere.mcmaster.ca:11375/23995"},"canonical_url":"https://search.ndltd.org/etd/mcmaster/oai:macsphere.mcmaster.ca:11375/23995","repository":{"repo_id":"mcmaster","name":"McMaster University","base_url":"https://macsphere.mcmaster.ca/server/oai/request"},"display":{"title":"Linearization-Based Strategies for Optimal Scheduling of a Hydroelectric Power Plant Under Uncertainty","abstract":"This thesis examines the optimal scheduling of a hydroelectric power plant with cascaded reservoirs each with multiple generating units under uncertainty after testing three linearization methods. These linearization methods are Successive Linear Programming, Piecewise Linear Approximations, and a Hybrid of the two together. There are two goals of this work. The first goal of this work aims to replace the nonconvex mixed-integer nonlinear program (MINLP) with a computationally efficient linearized mixed-integer linear program (MILP) that will be capable of finding a high quality solution, preferably the global optimum. The second goal is to implement a stochastic approach on the linearized method in a pseudo-rolling horizon method which keeps the ending time step fixed. Overall, the Hybrid method proved to be a viable replacement and performs well in the pseudo-rolling horizon tests.","abstract_html":"This thesis examines the optimal scheduling of a hydroelectric power plant with cascaded reservoirs each with multiple generating units under uncertainty after testing three linearization methods. These linearization methods are Successive Linear Programming, Piecewise Linear Approximations, and a Hybrid of the two together. There are two goals of this work. The first goal of this work aims to replace the nonconvex mixed-integer nonlinear program (MINLP) with a computationally efficient linearized mixed-integer linear program (MILP) that will be capable of finding a high quality solution, preferably the global optimum. The second goal is to implement a stochastic approach on the linearized method in a pseudo-rolling horizon method which keeps the ending time step fixed. Overall, the Hybrid method proved to be a viable replacement and performs well in the pseudo-rolling horizon tests.","abstract_has_math":false,"creators":["Tikk, Alexander"],"institution":null,"degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Chemical Engineering","school":null,"contributors":[],"advisors":["Swartz, Christopher L. E."],"committee_chairs":[],"committee_members":[],"year":2019,"date_issued":"2019","date_published":"2019","updated_at":"2026-11-18T19:32:26Z","subjects":["Hydropower/Hydroelectric","Uncertainty","Linearization","Scheduling","Optimization","Mixed-Integer Nonlinear Programming Problem (MINLP)","Mixed-Integer Linear Programming Problem (MILP)","Successive Linear Programming (SLP)","Piecewise Linear Approximations (PLA)","Stochastic","Nervousness","Rolling Horizon","Cascaded Reservoirs","Hybrid","nonconvex","Start-up costs","Generators"],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://doi.org/10.71548/11936"],"render_values":[{"text":"https://doi.org/10.71548/11936","href":"https://doi.org/10.71548/11936","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/11375/23995","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/11375/23995","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://macsphere.mcmaster.ca/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Amacsphere.mcmaster.ca%3A11375%2F23995","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Swartz, Christopher L. E."]},{"key":"dc:contributor.department","label":"Department","values":["Chemical Engineering"]},{"key":"dc:creator","label":"Author","values":["Tikk, Alexander"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2019-03-12T18:53:20Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2019-03-12T18:53:20Z"]},{"key":"dc:date.issued","label":"Date","values":["2019"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Hydropower/Hydroelectric","Uncertainty","Linearization","Scheduling","Optimization","Mixed-Integer Nonlinear Programming Problem (MINLP)","Mixed-Integer Linear Programming Problem (MILP)","Successive Linear Programming (SLP)","Piecewise Linear Approximations (PLA)","Stochastic","Nervousness","Rolling Horizon","Cascaded Reservoirs","Hybrid","nonconvex","Start-up costs","Generators"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/11375/23995","https://doi.org/10.71548/11936"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis examines the optimal scheduling of a hydroelectric power plant with cascaded reservoirs each with multiple generating units under uncertainty after testing three linearization methods. These linearization methods are Successive Linear Programming, Piecewise Linear Approximations, and a Hybrid of the two together. There are two goals of this work. The first goal of this work aims to replace the nonconvex mixed-integer nonlinear program (MINLP) with a computationally efficient linearized mixed-integer linear program (MILP) that will be capable of finding a high quality solution, preferably the global optimum. The second goal is to implement a stochastic approach on the linearized method in a pseudo-rolling horizon method which keeps the ending time step fixed. Overall, the Hybrid method proved to be a viable replacement and performs well in the pseudo-rolling horizon tests."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Applied Science (MASc)"]},{"key":"dc:title","label":"Title","values":["Linearization-Based Strategies for Optimal Scheduling of a Hydroelectric Power Plant Under Uncertainty"]},{"key":"dc:title.alternative","label":"Alternative Title","values":["Linearization-Based Scheduling of Hydropower Systems"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Swartz, Christopher L. E."],"dc:contributor.department":["Chemical Engineering"],"dc:creator":["Tikk, Alexander"],"dc:date.accessioned":["2019-03-12T18:53:20Z"],"dc:date.available":["2019-03-12T18:53:20Z"],"dc:date.issued":["2019"],"dc:description.abstract":["This thesis examines the optimal scheduling of a hydroelectric power plant with cascaded reservoirs each with multiple generating units under uncertainty after testing three linearization methods. These linearization methods are Successive Linear Programming, Piecewise Linear Approximations, and a Hybrid of the two together. There are two goals of this work. The first goal of this work aims to replace the nonconvex mixed-integer nonlinear program (MINLP) with a computationally efficient linearized mixed-integer linear program (MILP) that will be capable of finding a high quality solution, preferably the global optimum. The second goal is to implement a stochastic approach on the linearized method in a pseudo-rolling horizon method which keeps the ending time step fixed. Overall, the Hybrid method proved to be a viable replacement and performs well in the pseudo-rolling horizon tests."],"dc:description.degree":["Master of Applied Science (MASc)"],"dc:identifier.uri":["http://hdl.handle.net/11375/23995","https://doi.org/10.71548/11936"],"dc:language.iso":["en"],"dc:subject":["Hydropower/Hydroelectric","Uncertainty","Linearization","Scheduling","Optimization","Mixed-Integer Nonlinear Programming Problem (MINLP)","Mixed-Integer Linear Programming Problem (MILP)","Successive Linear Programming (SLP)","Piecewise Linear Approximations (PLA)","Stochastic","Nervousness","Rolling Horizon","Cascaded Reservoirs","Hybrid","nonconvex","Start-up costs","Generators"],"dc:title":["Linearization-Based Strategies for Optimal Scheduling of a Hydroelectric Power Plant Under Uncertainty"],"dc:title.alternative":["Linearization-Based Scheduling of Hydropower Systems"],"dc:type":["Thesis"],"others:access_status":["open.access"]},"updated_at":"2026-11-18T19:32:26Z"}