{"id":{"repo_id":"mcmaster","oai_identifier":"oai:macsphere.mcmaster.ca:11375/8909"},"canonical_url":"https://search.ndltd.org/etd/mcmaster/oai:macsphere.mcmaster.ca:11375/8909","repository":{"repo_id":"mcmaster","name":"McMaster University","base_url":"https://macsphere.mcmaster.ca/server/oai/request"},"display":{"title":"A FRAMEWORK FOR INTEGRATED REACTIVE SCHEDULING OF PLANT OPERATIONS AND MAINTENANCE","abstract":"<p>This thesis addresses a reactive (closed-loop) scheduling framework for integrated<br />scheduling of process operation and maintenance. Ethylene plant furnace scheduling is<br />chosen as the process example because it is concerned with optimally scheduling the<br />furnace operations and its periodic maintenance shutdowns. The main reason for<br />choosing this example is that it addresses a special class of scheduling problems where<br />the operations and maintenance have strong interactions and so integrated decision<br />making becomes necessary.</p> <p>The major goal of this research was to select an appropriate closed-loop<br />framework and develop a reactive scheduling system. With the rolling horizon approach<br />being the most suitable method for closed-loop schedule implementation, a Model<br />Predictive Control (MPC) framework is chosen in this thesis. The presence of integer<br />variables in the scheduling model made the reactive scheduling systems resemble a<br />hybrid MPC problem.</p> <p>The research was performed in two phases. In the first phase, an open-loop<br />scheduling model was formulated as a Mixed Integer Linear programming problem<br />(MILP) using discrete time representation. To ensure the tractability of the model,<br />tailored formulation methods (disjunctive reactor modelling, constraint reformulation and tightening constraints) and efficient solution heuristics (two-stage temporal<br />decomposition heuristic) were developed in this thesis. In the second phase, the openloop scheduling model was applied in the prototype closed-loop framework to develop a reactive scheduling system to assist engineers make appropriate decisions in a timely manner.</p> <p>The automated scheduling system developed in this thesis was tested for several<br />scenarios and proved to have significant benefits over manual scheduling procedures,<br />confirmed that the scheduling model is tractable and achieved feasible solutions for all<br />the scenarios considered, including large problems with multiple feeds, multiple reactors and a long (90-day) scheduling horizon. We conclude that the technology is appropriate for further improvement and eventual application in the industry.</p>","abstract_html":"&lt;p&gt;This thesis addresses a reactive (closed-loop) scheduling framework for integrated&lt;br /&gt;scheduling of process operation and maintenance. Ethylene plant furnace scheduling is&lt;br /&gt;chosen as the process example because it is concerned with optimally scheduling the&lt;br /&gt;furnace operations and its periodic maintenance shutdowns. The main reason for&lt;br /&gt;choosing this example is that it addresses a special class of scheduling problems where&lt;br /&gt;the operations and maintenance have strong interactions and so integrated decision&lt;br /&gt;making becomes necessary.&lt;/p&gt; &lt;p&gt;The major goal of this research was to select an appropriate closed-loop&lt;br /&gt;framework and develop a reactive scheduling system. With the rolling horizon approach&lt;br /&gt;being the most suitable method for closed-loop schedule implementation, a Model&lt;br /&gt;Predictive Control (MPC) framework is chosen in this thesis. The presence of integer&lt;br /&gt;variables in the scheduling model made the reactive scheduling systems resemble a&lt;br /&gt;hybrid MPC problem.&lt;/p&gt; &lt;p&gt;The research was performed in two phases. In the first phase, an open-loop&lt;br /&gt;scheduling model was formulated as a Mixed Integer Linear programming problem&lt;br /&gt;(MILP) using discrete time representation. To ensure the tractability of the model,&lt;br /&gt;tailored formulation methods (disjunctive reactor modelling, constraint reformulation and tightening constraints) and efficient solution heuristics (two-stage temporal&lt;br /&gt;decomposition heuristic) were developed in this thesis. In the second phase, the openloop scheduling model was applied in the prototype closed-loop framework to develop a reactive scheduling system to assist engineers make appropriate decisions in a timely manner.&lt;/p&gt; &lt;p&gt;The automated scheduling system developed in this thesis was tested for several&lt;br /&gt;scenarios and proved to have significant benefits over manual scheduling procedures,&lt;br /&gt;confirmed that the scheduling model is tractable and achieved feasible solutions for all&lt;br /&gt;the scenarios considered, including large problems with multiple feeds, multiple reactors and a long (90-day) scheduling horizon. We conclude that the technology is appropriate for further improvement and eventual application in the industry.&lt;/p&gt;","abstract_has_math":false,"creators":["Pula, Ravi"],"institution":null,"degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":"Chemical Engineering","school":null,"contributors":[],"advisors":["Marlin, T.E."],"committee_chairs":[],"committee_members":[],"year":2009,"date_issued":"2009","date_published":"2009","updated_at":"2026-11-18T19:32:35Z","subjects":["Chemical Engineering"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://doi.org/10.71548/12321"],"render_values":[{"text":"https://doi.org/10.71548/12321","href":"https://doi.org/10.71548/12321","code":true}]},{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["opendissertations/4078","5096","2011324"],"render_values":[{"text":"opendissertations/4078","href":null,"code":true},{"text":"5096","href":null,"code":true},{"text":"2011324","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/11375/8909","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/11375/8909","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://macsphere.mcmaster.ca/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Amacsphere.mcmaster.ca%3A11375%2F8909","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Marlin, T.E."]},{"key":"dc:contributor.department","label":"Department","values":["Chemical Engineering"]},{"key":"dc:creator","label":"Author","values":["Pula, Ravi"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-06-18T16:44:37Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-06-18T16:44:37Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2011-05-12"]},{"key":"dc:date.issued","label":"Date","values":["2009"]},{"key":"dc:type","label":"Dc Type","values":["thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Chemical Engineering"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["opendissertations/4078","5096","2011324"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/11375/8909","https://doi.org/10.71548/12321"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["<p>This thesis addresses a reactive (closed-loop) scheduling framework for integrated<br />scheduling of process operation and maintenance. Ethylene plant furnace scheduling is<br />chosen as the process example because it is concerned with optimally scheduling the<br />furnace operations and its periodic maintenance shutdowns. The main reason for<br />choosing this example is that it addresses a special class of scheduling problems where<br />the operations and maintenance have strong interactions and so integrated decision<br />making becomes necessary.</p> <p>The major goal of this research was to select an appropriate closed-loop<br />framework and develop a reactive scheduling system. With the rolling horizon approach<br />being the most suitable method for closed-loop schedule implementation, a Model<br />Predictive Control (MPC) framework is chosen in this thesis. The presence of integer<br />variables in the scheduling model made the reactive scheduling systems resemble a<br />hybrid MPC problem.</p> <p>The research was performed in two phases. In the first phase, an open-loop<br />scheduling model was formulated as a Mixed Integer Linear programming problem<br />(MILP) using discrete time representation. To ensure the tractability of the model,<br />tailored formulation methods (disjunctive reactor modelling, constraint reformulation and tightening constraints) and efficient solution heuristics (two-stage temporal<br />decomposition heuristic) were developed in this thesis. In the second phase, the openloop scheduling model was applied in the prototype closed-loop framework to develop a reactive scheduling system to assist engineers make appropriate decisions in a timely manner.</p> <p>The automated scheduling system developed in this thesis was tested for several<br />scenarios and proved to have significant benefits over manual scheduling procedures,<br />confirmed that the scheduling model is tractable and achieved feasible solutions for all<br />the scenarios considered, including large problems with multiple feeds, multiple reactors and a long (90-day) scheduling horizon. We conclude that the technology is appropriate for further improvement and eventual application in the industry.</p>"]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Master of Applied Science (MASc)"]},{"key":"dc:title","label":"Title","values":["A FRAMEWORK FOR INTEGRATED REACTIVE SCHEDULING OF PLANT OPERATIONS AND MAINTENANCE"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Marlin, T.E."],"dc:contributor.department":["Chemical Engineering"],"dc:creator":["Pula, Ravi"],"dc:date.accessioned":["2014-06-18T16:44:37Z"],"dc:date.available":["2014-06-18T16:44:37Z"],"dc:date.created":["2011-05-12"],"dc:date.issued":["2009"],"dc:description.abstract":["<p>This thesis addresses a reactive (closed-loop) scheduling framework for integrated<br />scheduling of process operation and maintenance. Ethylene plant furnace scheduling is<br />chosen as the process example because it is concerned with optimally scheduling the<br />furnace operations and its periodic maintenance shutdowns. The main reason for<br />choosing this example is that it addresses a special class of scheduling problems where<br />the operations and maintenance have strong interactions and so integrated decision<br />making becomes necessary.</p> <p>The major goal of this research was to select an appropriate closed-loop<br />framework and develop a reactive scheduling system. With the rolling horizon approach<br />being the most suitable method for closed-loop schedule implementation, a Model<br />Predictive Control (MPC) framework is chosen in this thesis. The presence of integer<br />variables in the scheduling model made the reactive scheduling systems resemble a<br />hybrid MPC problem.</p> <p>The research was performed in two phases. In the first phase, an open-loop<br />scheduling model was formulated as a Mixed Integer Linear programming problem<br />(MILP) using discrete time representation. To ensure the tractability of the model,<br />tailored formulation methods (disjunctive reactor modelling, constraint reformulation and tightening constraints) and efficient solution heuristics (two-stage temporal<br />decomposition heuristic) were developed in this thesis. In the second phase, the openloop scheduling model was applied in the prototype closed-loop framework to develop a reactive scheduling system to assist engineers make appropriate decisions in a timely manner.</p> <p>The automated scheduling system developed in this thesis was tested for several<br />scenarios and proved to have significant benefits over manual scheduling procedures,<br />confirmed that the scheduling model is tractable and achieved feasible solutions for all<br />the scenarios considered, including large problems with multiple feeds, multiple reactors and a long (90-day) scheduling horizon. We conclude that the technology is appropriate for further improvement and eventual application in the industry.</p>"],"dc:description.degree":["Master of Applied Science (MASc)"],"dc:identifier.other":["opendissertations/4078","5096","2011324"],"dc:identifier.uri":["http://hdl.handle.net/11375/8909","https://doi.org/10.71548/12321"],"dc:subject":["Chemical Engineering"],"dc:title":["A FRAMEWORK FOR INTEGRATED REACTIVE SCHEDULING OF PLANT OPERATIONS AND MAINTENANCE"],"dc:type":["thesis"],"others:access_status":["open.access"]},"updated_at":"2026-11-18T19:32:35Z"}