{"id":{"repo_id":"missouri","oai_identifier":"oai:mospace.umsystem.edu:10355/4246"},"canonical_url":"https://search.ndltd.org/etd/missouri/oai:mospace.umsystem.edu:10355/4246","repository":{"repo_id":"missouri","name":"University of Missouri","base_url":"https://mospace.umsystem.edu/oai/request"},"display":{"title":"Staging approaches to reduce overall cost in a crossdock environment","abstract":"Crossdocking operations seek to move materials from inbound locations to outbound locations as quickly as possible. In some cases this can be achieved without intermediate product staging. However, in an environment with limited space, limited material handling resources, multiple operations and realistic scheduling needs, some short-term staging is required. The objective of this research is to determine what staging strategy is most appropriate in a crossdocking operation as a function of freight attributes (dimensions and number of different types of boxes), and container loading requirements The problem is described in mathematical terms and then a hybrid analytic/simulation approach is used as the basis of a cost analysis and analyzing operational performance of the different staging strategies. Staging strategies are evaluated with respect to average and maximum staging requirements, average crossdock flow time, outbound trailer cube utilization, and material flow system / space cost.","abstract_html":"Crossdocking operations seek to move materials from inbound locations to outbound locations as quickly as possible. In some cases this can be achieved without intermediate product staging. However, in an environment with limited space, limited material handling resources, multiple operations and realistic scheduling needs, some short-term staging is required. The objective of this research is to determine what staging strategy is most appropriate in a crossdocking operation as a function of freight attributes (dimensions and number of different types of boxes), and container loading requirements The problem is described in mathematical terms and then a hybrid analytic/simulation approach is used as the basis of a cost analysis and analyzing operational performance of the different staging strategies. Staging strategies are evaluated with respect to average and maximum staging requirements, average crossdock flow time, outbound trailer cube utilization, and material flow system / space cost.","abstract_has_math":false,"creators":["Sandal, Sumit"],"institution":"University of Missouri--Columbia","degree_name":"M.S.","degree_level":"Masters","degree_discipline":"Industrial and manufacturing systems engineering (MU)","degree_department":null,"school":null,"contributors":[],"advisors":["Noble, James S."],"committee_chairs":[],"committee_members":[],"year":2005,"date_issued":"2005","date_published":"2005","updated_at":"2026-11-19T08:59:22Z","subjects":["Material requirements planning -- Costs","Flexible manufacturing systems -- Costs"],"languages":["eng","English"],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.bibid","label":"Dc Identifier Bibid","values":["b57456069"],"render_values":[{"text":"b57456069","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/10355/4246","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"http://hdl.handle.net/10355/4246","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://mospace.umsystem.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Amospace.umsystem.edu%3A10355%2F4246","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Noble, James S."]},{"key":"dc:creator","label":"Author","values":["Sandal, Sumit"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2010-01-12T16:45:26Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2010-01-12T16:45:26Z"]},{"key":"dc:date.issued","label":"Date","values":["2005"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2005 Fall"]},{"key":"dc:publisher","label":"Institution","values":["University of Missouri--Columbia"]},{"key":"dc:relation.ispartof","label":"Dc Relation Ispartof","values":["University of Missouri--Columbia. Graduate School. Theses and Dissertations"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial and manufacturing systems engineering (MU)"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S."]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Missouri--Columbia"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Material requirements planning -- Costs","Flexible manufacturing systems -- Costs"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.bibid","label":"Dc Identifier Bibid","values":["b57456069"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/10355/4246"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The entire dissertation/thesis text is included in the research.pdf file; the official abstract appears in the short.pdf file (which also appears in the research.pdf); a non-technical general description, or public abstract, appears in the public.pdf file.","Title from title screen of research.pdf file viewed on (December 19, 2006)","Includes bibliographical references.","Thesis (M.S.) University of Missouri-Columbia 2005.","Dissertations, Academic -- University of Missouri--Columbia -- Industrial engineering."]},{"key":"dc:description.abstract","label":"Abstract","values":["Crossdocking operations seek to move materials from inbound locations to outbound locations as quickly as possible. In some cases this can be achieved without intermediate product staging. However, in an environment with limited space, limited material handling resources, multiple operations and realistic scheduling needs, some short-term staging is required. The objective of this research is to determine what staging strategy is most appropriate in a crossdocking operation as a function of freight attributes (dimensions and number of different types of boxes), and container loading requirements The problem is described in mathematical terms and then a hybrid analytic/simulation approach is used as the basis of a cost analysis and analyzing operational performance of the different staging strategies. Staging strategies are evaluated with respect to average and maximum staging requirements, average crossdock flow time, outbound trailer cube utilization, and material flow system / space cost."]},{"key":"dc:description.provenance","label":"Dc Description Provenance","values":["SandalS-051706-T3294"]},{"key":"dc:title","label":"Title","values":["Staging approaches to reduce overall cost in a crossdock environment"]}]}],"canonical_facts":{"dc:contributor.advisor":["Noble, James S."],"dc:creator":["Sandal, Sumit"],"dc:date.accessioned":["2010-01-12T16:45:26Z"],"dc:date.available":["2010-01-12T16:45:26Z"],"dc:date.issued":["2005"],"dc:date.submitted":["2005 Fall"],"dc:description":["The entire dissertation/thesis text is included in the research.pdf file; the official abstract appears in the short.pdf file (which also appears in the research.pdf); a non-technical general description, or public abstract, appears in the public.pdf file.","Title from title screen of research.pdf file viewed on (December 19, 2006)","Includes bibliographical references.","Thesis (M.S.) University of Missouri-Columbia 2005.","Dissertations, Academic -- University of Missouri--Columbia -- Industrial engineering."],"dc:description.abstract":["Crossdocking operations seek to move materials from inbound locations to outbound locations as quickly as possible. In some cases this can be achieved without intermediate product staging. However, in an environment with limited space, limited material handling resources, multiple operations and realistic scheduling needs, some short-term staging is required. The objective of this research is to determine what staging strategy is most appropriate in a crossdocking operation as a function of freight attributes (dimensions and number of different types of boxes), and container loading requirements The problem is described in mathematical terms and then a hybrid analytic/simulation approach is used as the basis of a cost analysis and analyzing operational performance of the different staging strategies. Staging strategies are evaluated with respect to average and maximum staging requirements, average crossdock flow time, outbound trailer cube utilization, and material flow system / space cost."],"dc:description.provenance":["SandalS-051706-T3294"],"dc:identifier.bibid":["b57456069"],"dc:identifier.uri":["http://hdl.handle.net/10355/4246"],"dc:language":["English"],"dc:language.iso":["eng"],"dc:publisher":["University of Missouri--Columbia"],"dc:relation.ispartof":["University of Missouri--Columbia. Graduate School. Theses and Dissertations"],"dc:subject.lcsh":["Material requirements planning -- Costs","Flexible manufacturing systems -- Costs"],"dc:title":["Staging approaches to reduce overall cost in a crossdock environment"],"dc:type":["Thesis"],"thesis:degree_discipline":["Industrial and manufacturing systems engineering (MU)"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S."],"thesis:institution_name":["University of Missouri--Columbia"]},"updated_at":"2026-11-19T08:59:22Z"}