{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/12781"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/12781","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"A model for predicting and managing a production ramp-up of a new product","abstract":"Thesis (M.S.)--Massachusetts Institute of Technology, Sloan School of Management, 1992 and (M.S.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1992.","abstract_html":"Thesis (M.S.)--Massachusetts Institute of Technology, Sloan School of Management, 1992 and (M.S.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1992.","abstract_has_math":false,"creators":["Casamento, James William"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["George Chryssolouris and Alfredo M. Kofman."],"committee_chairs":[],"committee_members":[],"year":1992,"date_issued":"1992","date_published":"1992","updated_at":"2026-11-29T16:47:51Z","subjects":["Sloan School of Management","Mechanical Engineering"],"languages":["en"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["27122357"],"render_values":[{"text":"27122357","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/12781","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/12781","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F12781","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F12781","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["George Chryssolouris and Alfredo M. Kofman."]},{"key":"dc:creator","label":"Author","values":["Casamento, James William"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2005-08-15T18:39:38Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2005-08-15T18:39:38Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["1992"]},{"key":"dc:date.issued","label":"Date","values":["1992"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Sloan School of Management","Mechanical Engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["27122357"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/12781"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"6caf3706-b257-4138-b6f0-6fa3d2f9659d\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>A model for predicting and managing a production ramp-up of a new product</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>1992</PublicationDate> <Authors> <Author> <DisplayName>Casamento, James William</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Sloan School of Management</Keyword> <Keyword>Mechanical Engineering</Keyword> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description","label":"Description","values":["Thesis (M.S.)--Massachusetts Institute of Technology, Sloan School of Management, 1992 and (M.S.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1992.","Includes bibliographical references."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.S."]},{"key":"dc:description.statementofresponsibility","label":"Dc Description Statementofresponsibility","values":["by James William Casamento."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["83 p.","5496538 bytes","5496299 bytes"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["A model for predicting and managing a production ramp-up of a new product"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"6caf3706-b257-4138-b6f0-6fa3d2f9659d\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>A model for predicting and managing a production ramp-up of a new product</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>1992</PublicationDate> <Authors> <Author> <DisplayName>Casamento, James William</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Sloan School of Management</Keyword> <Keyword>Mechanical Engineering</Keyword> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["George Chryssolouris and Alfredo M. Kofman."],"dc:creator":["Casamento, James William"],"dc:date.accessioned":["2005-08-15T18:39:38Z"],"dc:date.available":["2005-08-15T18:39:38Z"],"dc:date.copyright":["1992"],"dc:date.issued":["1992"],"dc:description":["Thesis (M.S.)--Massachusetts Institute of Technology, Sloan School of Management, 1992 and (M.S.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1992.","Includes bibliographical references."],"dc:description.degree":["M.S."],"dc:description.statementofresponsibility":["by James William Casamento."],"dc:format.extent":["83 p.","5496538 bytes","5496299 bytes"],"dc:format.mimetype":["application/pdf"],"dc:identifier.oclc":["27122357"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/12781"],"dc:language.iso":["en"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Sloan School of Management","Mechanical Engineering"],"dc:title":["A model for predicting and managing a production ramp-up of a new product"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"]},"updated_at":"2026-11-29T16:47:51Z"}