{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/129129"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/129129","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Motion planning with dynamic constraints through pose graph optimization","abstract":"This contribution is an optimization-based method for robotic path-planning that is able to recover vehicle controls in addition to discovering an optimized, feasible trajectory from start to goal for vehicles with arbitrary dynamics. The motion planner extends the application of factor-graph optimization commonly used in simultaneous localization and mapping tasks to the path-planning task, specifically the \"timed elastic band\" trajectory optimization approach [1] for control input extraction functionality. This is achieved by the introduction of control input-dependent vertices into the factor-graph along with a way to systematically design dynamics violation costs without relying on hand-picked geometric parameters. An implementation of the planner successfully recovers vehicle control inputs and produces feasible trajectories in simulation testing.","abstract_html":"This contribution is an optimization-based method for robotic path-planning that is able to recover vehicle controls in addition to discovering an optimized, feasible trajectory from start to goal for vehicles with arbitrary dynamics. The motion planner extends the application of factor-graph optimization commonly used in simultaneous localization and mapping tasks to the path-planning task, specifically the &quot;timed elastic band&quot; trajectory optimization approach [1] for control input extraction functionality. This is achieved by the introduction of control input-dependent vertices into the factor-graph along with a way to systematically design dynamics violation costs without relying on hand-picked geometric parameters. An implementation of the planner successfully recovers vehicle control inputs and produces feasible trajectories in simulation testing.","abstract_has_math":false,"creators":["Balabanska, Nadya L."],"institution":"Massachusetts Institute of Technology","degree_name":"Master","degree_level":null,"degree_discipline":null,"degree_department":"EECS","school":null,"contributors":[],"advisors":["Sertac Karaman."],"committee_chairs":[],"committee_members":[],"year":2020,"date_issued":"2020","date_published":"2020","updated_at":"2026-11-27T07:24:38Z","subjects":["Electrical Engineering and Computer Science."],"languages":["en"],"rights":["MIT theses may be protected by copyright. Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["1227274206"],"render_values":[{"text":"1227274206","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/129129","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/129129","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F129129","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F129129","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Sertac Karaman."]},{"key":"dc:contributor.department","label":"Department","values":["EECS"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Department of Electrical Engineering and Computer Science."]},{"key":"dc:creator","label":"Author","values":["Balabanska, Nadya L."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2021-01-06T17:41:43Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2021-01-06T17:41:43Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2020"]},{"key":"dc:date.issued","label":"Date","values":["2020"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Electrical Engineering and Computer Science."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["MIT theses may be protected by copyright. Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["1227274206"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/1721.1/129129"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"40abefd1-4092-4e14-817d-531dbedbdfa3\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Motion planning with dynamic constraints through pose graph optimization</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2020</PublicationDate> <Authors> <Author> <DisplayName>Balabanska, Nadya L.</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Electrical Engineering and Computer Science.</Keyword> <Abstract>This contribution is an optimization-based method for robotic path-planning that is able to recover vehicle controls in addition to discovering an optimized, feasible trajectory from start to goal for vehicles with arbitrary dynamics. The motion planner extends the application of factor-graph optimization commonly used in simultaneous localization and mapping tasks to the path-planning task, specifically the \"timed elastic band\" trajectory optimization approach [1] for control input extraction functionality. This is achieved by the introduction of control input-dependent vertices into the factor-graph along with a way to systematically design dynamics violation costs without relying on hand-picked geometric parameters. An implementation of the planner successfully recovers vehicle control inputs and produces feasible trajectories in simulation testing.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description","label":"Description","values":["Thesis: M. Eng., Massachusetts Institute of Technology, Department of Electrical Engineering and Computer Science, September, 2020","Cataloged from student-submitted PDF of thesis.","Includes bibliographical references (pages 20-21)."]},{"key":"dc:description.abstract","label":"Abstract","values":["This contribution is an optimization-based method for robotic path-planning that is able to recover vehicle controls in addition to discovering an optimized, feasible trajectory from start to goal for vehicles with arbitrary dynamics. The motion planner extends the application of factor-graph optimization commonly used in simultaneous localization and mapping tasks to the path-planning task, specifically the \"timed elastic band\" trajectory optimization approach [1] for control input extraction functionality. This is achieved by the introduction of control input-dependent vertices into the factor-graph along with a way to systematically design dynamics violation costs without relying on hand-picked geometric parameters. An implementation of the planner successfully recovers vehicle control inputs and produces feasible trajectories in simulation testing."]},{"key":"dc:description.collection","label":"Dc Description Collection","values":["M.Eng. Massachusetts Institute of Technology, Department of Electrical Engineering and Computer Science"]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.Eng."]},{"key":"dc:description.imported","label":"Dc Description Imported","values":["2021-01-06T17:41:43Z"]},{"key":"dc:description.statementofresponsibility","label":"Dc Description Statementofresponsibility","values":["by Nadya L. Balabanska."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["27 pages"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Motion planning with dynamic constraints through pose graph optimization"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"40abefd1-4092-4e14-817d-531dbedbdfa3\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Motion planning with dynamic constraints through pose graph optimization</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2020</PublicationDate> <Authors> <Author> <DisplayName>Balabanska, Nadya L.</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Electrical Engineering and Computer Science.</Keyword> <Abstract>This contribution is an optimization-based method for robotic path-planning that is able to recover vehicle controls in addition to discovering an optimized, feasible trajectory from start to goal for vehicles with arbitrary dynamics. The motion planner extends the application of factor-graph optimization commonly used in simultaneous localization and mapping tasks to the path-planning task, specifically the \"timed elastic band\" trajectory optimization approach [1] for control input extraction functionality. This is achieved by the introduction of control input-dependent vertices into the factor-graph along with a way to systematically design dynamics violation costs without relying on hand-picked geometric parameters. An implementation of the planner successfully recovers vehicle control inputs and produces feasible trajectories in simulation testing.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["Sertac Karaman."],"dc:contributor.department":["EECS"],"dc:contributor.other":["Massachusetts Institute of Technology. Department of Electrical Engineering and Computer Science."],"dc:creator":["Balabanska, Nadya L."],"dc:date.accessioned":["2021-01-06T17:41:43Z"],"dc:date.available":["2021-01-06T17:41:43Z"],"dc:date.copyright":["2020"],"dc:date.issued":["2020"],"dc:description":["Thesis: M. Eng., Massachusetts Institute of Technology, Department of Electrical Engineering and Computer Science, September, 2020","Cataloged from student-submitted PDF of thesis.","Includes bibliographical references (pages 20-21)."],"dc:description.abstract":["This contribution is an optimization-based method for robotic path-planning that is able to recover vehicle controls in addition to discovering an optimized, feasible trajectory from start to goal for vehicles with arbitrary dynamics. The motion planner extends the application of factor-graph optimization commonly used in simultaneous localization and mapping tasks to the path-planning task, specifically the \"timed elastic band\" trajectory optimization approach [1] for control input extraction functionality. This is achieved by the introduction of control input-dependent vertices into the factor-graph along with a way to systematically design dynamics violation costs without relying on hand-picked geometric parameters. An implementation of the planner successfully recovers vehicle control inputs and produces feasible trajectories in simulation testing."],"dc:description.collection":["M.Eng. Massachusetts Institute of Technology, Department of Electrical Engineering and Computer Science"],"dc:description.degree":["M.Eng."],"dc:description.imported":["2021-01-06T17:41:43Z"],"dc:description.statementofresponsibility":["by Nadya L. Balabanska."],"dc:format.extent":["27 pages"],"dc:format.mimetype":["application/pdf"],"dc:identifier.oclc":["1227274206"],"dc:identifier.uri":["https://hdl.handle.net/1721.1/129129"],"dc:language.iso":["en"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["MIT theses may be protected by copyright. Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Electrical Engineering and Computer Science."],"dc:title":["Motion planning with dynamic constraints through pose graph optimization"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"],"thesis:degree_name":["Master"]},"updated_at":"2026-11-27T07:24:38Z"}