{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/139456"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/139456","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Strategic Sourcing of Serial Production Processes in Jet Engine Manufacturing","abstract":"Fabrication of an individual jet engine component at Pratt & Whitney can go through upwards of 40 manufacturing processes, from an airfoil’s single crystal casting to thermal plasma spray coatings and wire EDM-drilled cooling holes. Many of these processes are extremely specialized, requiring special equipment, environmental controls, and expertise to produce at the precise tolerances required in aerospace. Utilizing contract manufacturers is an attractive and cost-effective option when lower unit process costs outweigh the associated transaction costs. However, it is not clear that Pratt & Whitney is utilizing an integrated and cost-efficient strategy when making sourcing decisions. Decisions are made locally, by individual production areas with little visibility into overall company impact. Furthermore, outsourcing arrangements established to temporarily supplement capacity end up persisting and becoming longer term or permanent arrangements. Based on research with Pratt Whitney, this project arrives at a methodology to operationalize continuous analysis of transaction costs in order to arrive an efficient sourcing decision.","abstract_html":"Fabrication of an individual jet engine component at Pratt &amp; Whitney can go through upwards of 40 manufacturing processes, from an airfoil’s single crystal casting to thermal plasma spray coatings and wire EDM-drilled cooling holes. Many of these processes are extremely specialized, requiring special equipment, environmental controls, and expertise to produce at the precise tolerances required in aerospace. Utilizing contract manufacturers is an attractive and cost-effective option when lower unit process costs outweigh the associated transaction costs. However, it is not clear that Pratt &amp; Whitney is utilizing an integrated and cost-efficient strategy when making sourcing decisions. Decisions are made locally, by individual production areas with little visibility into overall company impact. Furthermore, outsourcing arrangements established to temporarily supplement capacity end up persisting and becoming longer term or permanent arrangements. Based on research with Pratt Whitney, this project arrives at a methodology to operationalize continuous analysis of transaction costs in order to arrive an efficient sourcing decision.","abstract_has_math":false,"creators":["Forehand, Brandy"],"institution":"Massachusetts Institute of Technology","degree_name":"Master","degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Welsch, Roy","Simchi-Levi, David"],"committee_chairs":[],"committee_members":[],"year":2021,"date_issued":"2021-06","date_published":"2021-06","updated_at":"2026-11-27T04:19:33Z","subjects":[],"languages":[],"rights":["In Copyright - Educational Use Permitted","Copyright retained by author(s)"],"rights_urls":["https://rightsstatements.org/page/InC-EDU/1.0/"],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/139456","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/139456","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F139456","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F139456","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Welsch, Roy","Simchi-Levi, David"]},{"key":"dc:creator","label":"Author","values":["Forehand, Brandy"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2022-01-14T15:12:32Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2022-01-14T15:12:32Z"]},{"key":"dc:date.issued","label":"Date","values":["2021-06"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2021-06-10T19:13:07.907Z"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master","Master of Business Administration","Master of Science in Civil and Environmental Engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["In Copyright - Educational Use Permitted","Copyright retained by author(s)"]},{"key":"dc:rights.uri","label":"Rights URI","values":["https://rightsstatements.org/page/InC-EDU/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/1721.1/139456"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"1841493b-4510-43e5-9ad1-bf457c997e03\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Title>Strategic Sourcing of Serial Production Processes in Jet Engine Manufacturing</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2021-06</PublicationDate> <Authors> <Author> <DisplayName>Forehand, Brandy</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>https://rightsstatements.org/page/InC-EDU/1.0/</License> <Abstract>Fabrication of an individual jet engine component at Pratt & Whitney can go through upwards of 40 manufacturing processes, from an airfoil’s single crystal casting to thermal plasma spray coatings and wire EDM-drilled cooling holes. Many of these processes are extremely specialized, requiring special equipment, environmental controls, and expertise to produce at the precise tolerances required in aerospace. Utilizing contract manufacturers is an attractive and cost-effective option when lower unit process costs outweigh the associated transaction costs. However, it is not clear that Pratt & Whitney is utilizing an integrated and cost-efficient strategy when making sourcing decisions. Decisions are made locally, by individual production areas with little visibility into overall company impact. Furthermore, outsourcing arrangements established to temporarily supplement capacity end up persisting and becoming longer term or permanent arrangements. Based on research with Pratt Whitney, this project arrives at a methodology to operationalize continuous analysis of transaction costs in order to arrive an efficient sourcing decision.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description.abstract","label":"Abstract","values":["Fabrication of an individual jet engine component at Pratt & Whitney can go through upwards of 40 manufacturing processes, from an airfoil’s single crystal casting to thermal plasma spray coatings and wire EDM-drilled cooling holes. Many of these processes are extremely specialized, requiring special equipment, environmental controls, and expertise to produce at the precise tolerances required in aerospace. Utilizing contract manufacturers is an attractive and cost-effective option when lower unit process costs outweigh the associated transaction costs. However, it is not clear that Pratt & Whitney is utilizing an integrated and cost-efficient strategy when making sourcing decisions. Decisions are made locally, by individual production areas with little visibility into overall company impact. Furthermore, outsourcing arrangements established to temporarily supplement capacity end up persisting and becoming longer term or permanent arrangements. Based on research with Pratt Whitney, this project arrives at a methodology to operationalize continuous analysis of transaction costs in order to arrive an efficient sourcing decision."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.B.A.","S.M."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Strategic Sourcing of Serial Production Processes in Jet Engine Manufacturing"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"1841493b-4510-43e5-9ad1-bf457c997e03\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Title>Strategic Sourcing of Serial Production Processes in Jet Engine Manufacturing</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2021-06</PublicationDate> <Authors> <Author> <DisplayName>Forehand, Brandy</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>https://rightsstatements.org/page/InC-EDU/1.0/</License> <Abstract>Fabrication of an individual jet engine component at Pratt & Whitney can go through upwards of 40 manufacturing processes, from an airfoil’s single crystal casting to thermal plasma spray coatings and wire EDM-drilled cooling holes. Many of these processes are extremely specialized, requiring special equipment, environmental controls, and expertise to produce at the precise tolerances required in aerospace. Utilizing contract manufacturers is an attractive and cost-effective option when lower unit process costs outweigh the associated transaction costs. However, it is not clear that Pratt & Whitney is utilizing an integrated and cost-efficient strategy when making sourcing decisions. Decisions are made locally, by individual production areas with little visibility into overall company impact. Furthermore, outsourcing arrangements established to temporarily supplement capacity end up persisting and becoming longer term or permanent arrangements. Based on research with Pratt Whitney, this project arrives at a methodology to operationalize continuous analysis of transaction costs in order to arrive an efficient sourcing decision.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["Welsch, Roy","Simchi-Levi, David"],"dc:creator":["Forehand, Brandy"],"dc:date.accessioned":["2022-01-14T15:12:32Z"],"dc:date.available":["2022-01-14T15:12:32Z"],"dc:date.issued":["2021-06"],"dc:date.submitted":["2021-06-10T19:13:07.907Z"],"dc:description.abstract":["Fabrication of an individual jet engine component at Pratt & Whitney can go through upwards of 40 manufacturing processes, from an airfoil’s single crystal casting to thermal plasma spray coatings and wire EDM-drilled cooling holes. Many of these processes are extremely specialized, requiring special equipment, environmental controls, and expertise to produce at the precise tolerances required in aerospace. Utilizing contract manufacturers is an attractive and cost-effective option when lower unit process costs outweigh the associated transaction costs. However, it is not clear that Pratt & Whitney is utilizing an integrated and cost-efficient strategy when making sourcing decisions. Decisions are made locally, by individual production areas with little visibility into overall company impact. Furthermore, outsourcing arrangements established to temporarily supplement capacity end up persisting and becoming longer term or permanent arrangements. Based on research with Pratt Whitney, this project arrives at a methodology to operationalize continuous analysis of transaction costs in order to arrive an efficient sourcing decision."],"dc:description.degree":["M.B.A.","S.M."],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["https://hdl.handle.net/1721.1/139456"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["In Copyright - Educational Use Permitted","Copyright retained by author(s)"],"dc:rights.uri":["https://rightsstatements.org/page/InC-EDU/1.0/"],"dc:title":["Strategic Sourcing of Serial Production Processes in Jet Engine Manufacturing"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"],"thesis:degree_name":["Master","Master of Business Administration","Master of Science in Civil and Environmental Engineering"]},"updated_at":"2026-11-27T04:19:33Z"}