{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/144926"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/144926","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Decision-making under uncertainty for electric power system operation and expansion planning","abstract":"Decision-making under uncertainty is required in a multiplicity of situations in power system operation and capacity expansion planning. This thesis investigates the drivers and impact of uncertainty on power system infrastructure planning and proposes several methods to design and operate a power system at granular modeling level. The focus of the thesis is on Emerging Markets and Developing Economy countries, specifically India and Nigeria. However, the work presented in this document can be adapted to other situations, in the power sector or elsewhere, that share similar traits. Moreover, incorporating uncertainty in generalized optimization models often yields inaccurate results due to the lack of precision in representing the problem. This thesis carefully examines a set of situations and presents appropriate decision-making under uncertainty frameworks that yield meaningful results. The thesis is divided into three parts: drivers of uncertainty, the impact of uncertainty, and accounting for uncertainty in electricity resource design, with applications to Emerging Markets and Developing Economy countries.","abstract_html":"Decision-making under uncertainty is required in a multiplicity of situations in power system operation and capacity expansion planning. This thesis investigates the drivers and impact of uncertainty on power system infrastructure planning and proposes several methods to design and operate a power system at granular modeling level. The focus of the thesis is on Emerging Markets and Developing Economy countries, specifically India and Nigeria. However, the work presented in this document can be adapted to other situations, in the power sector or elsewhere, that share similar traits. Moreover, incorporating uncertainty in generalized optimization models often yields inaccurate results due to the lack of precision in representing the problem. This thesis carefully examines a set of situations and presents appropriate decision-making under uncertainty frameworks that yield meaningful results. The thesis is divided into three parts: drivers of uncertainty, the impact of uncertainty, and accounting for uncertainty in electricity resource design, with applications to Emerging Markets and Developing Economy countries.","abstract_has_math":false,"creators":["Barbar, Marc"],"institution":"Massachusetts Institute of Technology","degree_name":"Doctoral","degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Kirtley Jr., James L.","Pérez-Arriaga, Ignacio J."],"committee_chairs":[],"committee_members":[],"year":2022,"date_issued":"2022-05","date_published":"2022-05","updated_at":"2026-11-27T06:22:55Z","subjects":[],"languages":[],"rights":["In Copyright - Educational Use Permitted","Copyright MIT"],"rights_urls":["http://rightsstatements.org/page/InC-EDU/1.0/"],"identifier_entries":[],"person_identifier_entries":[{"key":"dc:identifier.orcid","label":"ORCID","values":["0000-0002-9192-1731"],"render_values":[{"text":"0000-0002-9192-1731","href":"https://orcid.org/0000-0002-9192-1731","code":true}]}]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/144926","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/144926","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F144926","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F144926","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Kirtley Jr., James L.","Pérez-Arriaga, Ignacio J."]},{"key":"dc:creator","label":"Author","values":["Barbar, Marc"]},{"key":"dc:identifier.orcid","label":"ORCID","values":["0000-0002-9192-1731"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2022-08-29T16:21:27Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2022-08-29T16:21:27Z"]},{"key":"dc:date.issued","label":"Date","values":["2022-05"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2022-06-21T19:15:54.432Z"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Doctoral","Doctor of Philosophy"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["In Copyright - Educational Use Permitted","Copyright MIT"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://rightsstatements.org/page/InC-EDU/1.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/1721.1/144926"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"336d9167-15f4-4b44-b48f-c4ef8ecc6bb5\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Title>Decision-making under uncertainty for electric power system operation and expansion planning</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2022-05</PublicationDate> <Authors> <Author> <DisplayName>Barbar, Marc</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://rightsstatements.org/page/InC-EDU/1.0/</License> <Abstract>Decision-making under uncertainty is required in a multiplicity of situations in power system operation and capacity expansion planning. This thesis investigates the drivers and impact of uncertainty on power system infrastructure planning and proposes several methods to design and operate a power system at granular modeling level. The focus of the thesis is on Emerging Markets and Developing Economy countries, specifically India and Nigeria. However, the work presented in this document can be adapted to other situations, in the power sector or elsewhere, that share similar traits. Moreover, incorporating uncertainty in generalized optimization models often yields inaccurate results due to the lack of precision in representing the problem. This thesis carefully examines a set of situations and presents appropriate decision-making under uncertainty frameworks that yield meaningful results. The thesis is divided into three parts: drivers of uncertainty, the impact of uncertainty, and accounting for uncertainty in electricity resource design, with applications to Emerging Markets and Developing Economy countries.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description.abstract","label":"Abstract","values":["Decision-making under uncertainty is required in a multiplicity of situations in power system operation and capacity expansion planning. This thesis investigates the drivers and impact of uncertainty on power system infrastructure planning and proposes several methods to design and operate a power system at granular modeling level. The focus of the thesis is on Emerging Markets and Developing Economy countries, specifically India and Nigeria. However, the work presented in this document can be adapted to other situations, in the power sector or elsewhere, that share similar traits. Moreover, incorporating uncertainty in generalized optimization models often yields inaccurate results due to the lack of precision in representing the problem. This thesis carefully examines a set of situations and presents appropriate decision-making under uncertainty frameworks that yield meaningful results. The thesis is divided into three parts: drivers of uncertainty, the impact of uncertainty, and accounting for uncertainty in electricity resource design, with applications to Emerging Markets and Developing Economy countries."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Ph.D."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Decision-making under uncertainty for electric power system operation and expansion planning"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"336d9167-15f4-4b44-b48f-c4ef8ecc6bb5\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Title>Decision-making under uncertainty for electric power system operation and expansion planning</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2022-05</PublicationDate> <Authors> <Author> <DisplayName>Barbar, Marc</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://rightsstatements.org/page/InC-EDU/1.0/</License> <Abstract>Decision-making under uncertainty is required in a multiplicity of situations in power system operation and capacity expansion planning. This thesis investigates the drivers and impact of uncertainty on power system infrastructure planning and proposes several methods to design and operate a power system at granular modeling level. The focus of the thesis is on Emerging Markets and Developing Economy countries, specifically India and Nigeria. However, the work presented in this document can be adapted to other situations, in the power sector or elsewhere, that share similar traits. Moreover, incorporating uncertainty in generalized optimization models often yields inaccurate results due to the lack of precision in representing the problem. This thesis carefully examines a set of situations and presents appropriate decision-making under uncertainty frameworks that yield meaningful results. The thesis is divided into three parts: drivers of uncertainty, the impact of uncertainty, and accounting for uncertainty in electricity resource design, with applications to Emerging Markets and Developing Economy countries.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["Kirtley Jr., James L.","Pérez-Arriaga, Ignacio J."],"dc:creator":["Barbar, Marc"],"dc:date.accessioned":["2022-08-29T16:21:27Z"],"dc:date.available":["2022-08-29T16:21:27Z"],"dc:date.issued":["2022-05"],"dc:date.submitted":["2022-06-21T19:15:54.432Z"],"dc:description.abstract":["Decision-making under uncertainty is required in a multiplicity of situations in power system operation and capacity expansion planning. This thesis investigates the drivers and impact of uncertainty on power system infrastructure planning and proposes several methods to design and operate a power system at granular modeling level. The focus of the thesis is on Emerging Markets and Developing Economy countries, specifically India and Nigeria. However, the work presented in this document can be adapted to other situations, in the power sector or elsewhere, that share similar traits. Moreover, incorporating uncertainty in generalized optimization models often yields inaccurate results due to the lack of precision in representing the problem. This thesis carefully examines a set of situations and presents appropriate decision-making under uncertainty frameworks that yield meaningful results. The thesis is divided into three parts: drivers of uncertainty, the impact of uncertainty, and accounting for uncertainty in electricity resource design, with applications to Emerging Markets and Developing Economy countries."],"dc:description.degree":["Ph.D."],"dc:format.mimetype":["application/pdf"],"dc:identifier.orcid":["0000-0002-9192-1731"],"dc:identifier.uri":["https://hdl.handle.net/1721.1/144926"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["In Copyright - Educational Use Permitted","Copyright MIT"],"dc:rights.uri":["http://rightsstatements.org/page/InC-EDU/1.0/"],"dc:title":["Decision-making under uncertainty for electric power system operation and expansion planning"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"],"thesis:degree_name":["Doctoral","Doctor of Philosophy"]},"updated_at":"2026-11-27T06:22:55Z"}