{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/15145"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/15145","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Analysis and quantification of risk of cost overruns in construction projects","abstract":"Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1985.","abstract_html":"Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1985.","abstract_has_math":false,"creators":["Bermúdez Marcos, José"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Erik Vanmarcke."],"committee_chairs":[],"committee_members":[],"year":1985,"date_issued":"1985","date_published":"1985","updated_at":"2026-11-29T16:48:21Z","subjects":["Civil Engineering."],"languages":["en"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["14229340"],"render_values":[{"text":"14229340","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/15145","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/15145","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F15145","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F15145","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Erik Vanmarcke."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Dept. of Civil Engineering."]},{"key":"dc:creator","label":"Author","values":["Bermúdez Marcos, José"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2005-08-08T15:51:48Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2005-08-08T15:51:48Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["1985"]},{"key":"dc:date.issued","label":"Date","values":["1985"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Civil Engineering."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["14229340"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/15145"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"70f413a7-1082-4678-ad61-4f1ed15add55\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Analysis and quantification of risk of cost overruns in construction projects</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>1985</PublicationDate> <Authors> <Author> <DisplayName>Bermúdez Marcos, José</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Civil Engineering.</Keyword> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description","label":"Description","values":["Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1985.","MICROFICHE COPY AVAILABLE IN ARCHIVES AND ENGINEERING","Bibliography: leaves 121-123."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.S."]},{"key":"dc:description.statementofresponsibility","label":"Dc Description Statementofresponsibility","values":["by José Bermúdez Marcos."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["123 leaves","6733871 bytes","6733630 bytes"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Analysis and quantification of risk of cost overruns in construction projects"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"70f413a7-1082-4678-ad61-4f1ed15add55\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Analysis and quantification of risk of cost overruns in construction projects</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>1985</PublicationDate> <Authors> <Author> <DisplayName>Bermúdez Marcos, José</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Civil Engineering.</Keyword> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["Erik Vanmarcke."],"dc:contributor.other":["Massachusetts Institute of Technology. Dept. of Civil Engineering."],"dc:creator":["Bermúdez Marcos, José"],"dc:date.accessioned":["2005-08-08T15:51:48Z"],"dc:date.available":["2005-08-08T15:51:48Z"],"dc:date.copyright":["1985"],"dc:date.issued":["1985"],"dc:description":["Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1985.","MICROFICHE COPY AVAILABLE IN ARCHIVES AND ENGINEERING","Bibliography: leaves 121-123."],"dc:description.degree":["M.S."],"dc:description.statementofresponsibility":["by José Bermúdez Marcos."],"dc:format.extent":["123 leaves","6733871 bytes","6733630 bytes"],"dc:format.mimetype":["application/pdf"],"dc:identifier.oclc":["14229340"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/15145"],"dc:language.iso":["en"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Civil Engineering."],"dc:title":["Analysis and quantification of risk of cost overruns in construction projects"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"]},"updated_at":"2026-11-29T16:48:21Z"}