{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/17912"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/17912","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"The benefits of structured training on manufacturing process ramp-up : a process based cost model approach","abstract":"Manufacturing facilities ramping up a new production process are faced with critical decisions, which determine the ability of that process to be cost efficient. Without quantitative analyses, these decisions are made with limited data and may cause manufacturing problems. Two critical decisions are examined in this research: what level of structured training to provide to employees and what cycle time to run when compared with the long-term optimal cycle time. By examining these decisions and their impact on two production metrics, unplanned equipment downtime and reject rate, a series of analyses are presented. A framework for conducting analyses is developed using Process Based Cost Modeling. This framework is applied to various automobile part manufacturing processes. The results indicate that production experience is critical for reducing the two performance metrics of unplanned downtime and reject rate. Additional analyses indicate that to achieve the best cycle times, a significant investment in structured training should be provided. Analytically determining the optimal cycle time is critical to improving production ramp-up because costs increase when running other cycle times. Future work would apply this framework to other manufacturing processes and gather additional data on the processes examined here.","abstract_html":"Manufacturing facilities ramping up a new production process are faced with critical decisions, which determine the ability of that process to be cost efficient. Without quantitative analyses, these decisions are made with limited data and may cause manufacturing problems. Two critical decisions are examined in this research: what level of structured training to provide to employees and what cycle time to run when compared with the long-term optimal cycle time. By examining these decisions and their impact on two production metrics, unplanned equipment downtime and reject rate, a series of analyses are presented. A framework for conducting analyses is developed using Process Based Cost Modeling. This framework is applied to various automobile part manufacturing processes. The results indicate that production experience is critical for reducing the two performance metrics of unplanned downtime and reject rate. Additional analyses indicate that to achieve the best cycle times, a significant investment in structured training should be provided. Analytically determining the optimal cycle time is critical to improving production ramp-up because costs increase when running other cycle times. Future work would apply this framework to other manufacturing processes and gather additional data on the processes examined here.","abstract_has_math":false,"creators":["Akehurst, Colleen Beth, 1976-"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Richard Roth, Randolph E. Kirchain, Jr. and Frank R. Field, III."],"committee_chairs":[],"committee_members":[],"year":2004,"date_issued":"2004","date_published":"2004","updated_at":"2026-11-27T04:18:06Z","subjects":["Technology and Policy Program."],"languages":["en"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["56727063"],"render_values":[{"text":"56727063","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/17912","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/17912","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F17912","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F17912","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Richard Roth, Randolph E. Kirchain, Jr. and Frank R. Field, III."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Technology and Policy Program."]},{"key":"dc:creator","label":"Author","values":["Akehurst, Colleen Beth, 1976-"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2005-06-02T19:09:31Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2005-06-02T19:09:31Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2004"]},{"key":"dc:date.issued","label":"Date","values":["2004"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Technology and Policy Program."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["56727063"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/17912"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"0cc8d363-0db9-4601-afff-5d914b9889e8\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>The benefits of structured training on manufacturing process ramp-up : a process based cost model approach</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2004</PublicationDate> <Authors> <Author> <DisplayName>Akehurst, Colleen Beth, 1976-</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Technology and Policy Program.</Keyword> <Abstract>Manufacturing facilities ramping up a new production process are faced with critical decisions, which determine the ability of that process to be cost efficient. Without quantitative analyses, these decisions are made with limited data and may cause manufacturing problems. Two critical decisions are examined in this research: what level of structured training to provide to employees and what cycle time to run when compared with the long-term optimal cycle time. By examining these decisions and their impact on two production metrics, unplanned equipment downtime and reject rate, a series of analyses are presented. A framework for conducting analyses is developed using Process Based Cost Modeling. This framework is applied to various automobile part manufacturing processes. The results indicate that production experience is critical for reducing the two performance metrics of unplanned downtime and reject rate. Additional analyses indicate that to achieve the best cycle times, a significant investment in structured training should be provided. Analytically determining the optimal cycle time is critical to improving production ramp-up because costs increase when running other cycle times. Future work would apply this framework to other manufacturing processes and gather additional data on the processes examined here.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description","label":"Description","values":["Thesis (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division, Technology and Policy Program, 2004.","Includes bibliographical references (p. 79-81)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Manufacturing facilities ramping up a new production process are faced with critical decisions, which determine the ability of that process to be cost efficient. Without quantitative analyses, these decisions are made with limited data and may cause manufacturing problems. Two critical decisions are examined in this research: what level of structured training to provide to employees and what cycle time to run when compared with the long-term optimal cycle time. By examining these decisions and their impact on two production metrics, unplanned equipment downtime and reject rate, a series of analyses are presented. A framework for conducting analyses is developed using Process Based Cost Modeling. This framework is applied to various automobile part manufacturing processes. The results indicate that production experience is critical for reducing the two performance metrics of unplanned downtime and reject rate. Additional analyses indicate that to achieve the best cycle times, a significant investment in structured training should be provided. Analytically determining the optimal cycle time is critical to improving production ramp-up because costs increase when running other cycle times. Future work would apply this framework to other manufacturing processes and gather additional data on the processes examined here."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M."]},{"key":"dc:description.statementofresponsibility","label":"Dc Description Statementofresponsibility","values":["by Colleen Beth Akehurst."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["81 p.","3101159 bytes","3100967 bytes"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["The benefits of structured training on manufacturing process ramp-up : a process based cost model approach"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"0cc8d363-0db9-4601-afff-5d914b9889e8\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>The benefits of structured training on manufacturing process ramp-up : a process based cost model approach</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2004</PublicationDate> <Authors> <Author> <DisplayName>Akehurst, Colleen Beth, 1976-</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Technology and Policy Program.</Keyword> <Abstract>Manufacturing facilities ramping up a new production process are faced with critical decisions, which determine the ability of that process to be cost efficient. Without quantitative analyses, these decisions are made with limited data and may cause manufacturing problems. Two critical decisions are examined in this research: what level of structured training to provide to employees and what cycle time to run when compared with the long-term optimal cycle time. By examining these decisions and their impact on two production metrics, unplanned equipment downtime and reject rate, a series of analyses are presented. A framework for conducting analyses is developed using Process Based Cost Modeling. This framework is applied to various automobile part manufacturing processes. The results indicate that production experience is critical for reducing the two performance metrics of unplanned downtime and reject rate. Additional analyses indicate that to achieve the best cycle times, a significant investment in structured training should be provided. Analytically determining the optimal cycle time is critical to improving production ramp-up because costs increase when running other cycle times. Future work would apply this framework to other manufacturing processes and gather additional data on the processes examined here.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["Richard Roth, Randolph E. Kirchain, Jr. and Frank R. Field, III."],"dc:contributor.other":["Massachusetts Institute of Technology. Technology and Policy Program."],"dc:creator":["Akehurst, Colleen Beth, 1976-"],"dc:date.accessioned":["2005-06-02T19:09:31Z"],"dc:date.available":["2005-06-02T19:09:31Z"],"dc:date.copyright":["2004"],"dc:date.issued":["2004"],"dc:description":["Thesis (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division, Technology and Policy Program, 2004.","Includes bibliographical references (p. 79-81)."],"dc:description.abstract":["Manufacturing facilities ramping up a new production process are faced with critical decisions, which determine the ability of that process to be cost efficient. Without quantitative analyses, these decisions are made with limited data and may cause manufacturing problems. Two critical decisions are examined in this research: what level of structured training to provide to employees and what cycle time to run when compared with the long-term optimal cycle time. By examining these decisions and their impact on two production metrics, unplanned equipment downtime and reject rate, a series of analyses are presented. A framework for conducting analyses is developed using Process Based Cost Modeling. This framework is applied to various automobile part manufacturing processes. The results indicate that production experience is critical for reducing the two performance metrics of unplanned downtime and reject rate. Additional analyses indicate that to achieve the best cycle times, a significant investment in structured training should be provided. Analytically determining the optimal cycle time is critical to improving production ramp-up because costs increase when running other cycle times. Future work would apply this framework to other manufacturing processes and gather additional data on the processes examined here."],"dc:description.degree":["S.M."],"dc:description.statementofresponsibility":["by Colleen Beth Akehurst."],"dc:format.extent":["81 p.","3101159 bytes","3100967 bytes"],"dc:format.mimetype":["application/pdf"],"dc:identifier.oclc":["56727063"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/17912"],"dc:language.iso":["en"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Technology and Policy Program."],"dc:title":["The benefits of structured training on manufacturing process ramp-up : a process based cost model approach"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"]},"updated_at":"2026-11-27T04:18:06Z"}