{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/34841"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/34841","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Six Sigma process improvements and sourcing strategies following factory fire","abstract":"This thesis addresses Six Sigma process improvements and the supplier management issues resulting from the shift to external suppliers in the aftermath of a fire. Originally, this thesis was to address a lean implementation in Raytheon's substrate fabrication area. It was intended to build on work done by Satish Krishnan, which focused on a lean implementation in a related area. However, a fire in Raytheon's El Segundo substrate area forced Raytheon to outsource substrate production and brought to the forefront a different set of challenging issues. The fire shut down production for 21 days, creating pressure to capture lost ground once operations resumed. The increased demand and burden on resources during the recovery uncovered inefficiencies in key processes. One of the areas that increased in importance following the fire was magnet assembly. The first half of this thesis (Chapter 3 through Chapter 6) applies Raytheon's Six Sigma framework to the magnet assembly process in an effort to reduce non-value added work and increase standardization and control. Six Sigma incorporates many of the principles of lean manufacturing, such as continuous improvement and the elimination of non-value added work.","abstract_html":"This thesis addresses Six Sigma process improvements and the supplier management issues resulting from the shift to external suppliers in the aftermath of a fire. Originally, this thesis was to address a lean implementation in Raytheon&#x27;s substrate fabrication area. It was intended to build on work done by Satish Krishnan, which focused on a lean implementation in a related area. However, a fire in Raytheon&#x27;s El Segundo substrate area forced Raytheon to outsource substrate production and brought to the forefront a different set of challenging issues. The fire shut down production for 21 days, creating pressure to capture lost ground once operations resumed. The increased demand and burden on resources during the recovery uncovered inefficiencies in key processes. One of the areas that increased in importance following the fire was magnet assembly. The first half of this thesis (Chapter 3 through Chapter 6) applies Raytheon&#x27;s Six Sigma framework to the magnet assembly process in an effort to reduce non-value added work and increase standardization and control. Six Sigma incorporates many of the principles of lean manufacturing, such as continuous improvement and the elimination of non-value added work.","abstract_has_math":false,"creators":["Egan, Sarah (Sarah J.)"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["David Simchi-Levi."],"committee_chairs":[],"committee_members":[],"year":2005,"date_issued":"2005","date_published":"2005","updated_at":"2026-11-27T06:22:17Z","subjects":["Sloan School of Management.","Civil and Environmental Engineering.","Leaders for Manufacturing Program."],"languages":["en"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["63192648"],"render_values":[{"text":"63192648","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/34841","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/34841","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F34841","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F34841","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["David Simchi-Levi."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Leaders for Manufacturing Program."]},{"key":"dc:creator","label":"Author","values":["Egan, Sarah (Sarah J.)"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2006-11-08T16:47:22Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2006-11-08T16:47:22Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2005"]},{"key":"dc:date.issued","label":"Date","values":["2005"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Sloan School of Management.","Civil and Environmental Engineering.","Leaders for Manufacturing Program."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["63192648"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/34841"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"2c1af6ae-34bb-43c8-bc54-efcf29d3b27b\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Six Sigma process improvements and sourcing strategies following factory fire</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2005</PublicationDate> <Authors> <Author> <DisplayName>Egan, Sarah (Sarah J.)</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Sloan School of Management.</Keyword> <Keyword>Civil and Environmental Engineering.</Keyword> <Keyword>Leaders for Manufacturing Program.</Keyword> <Abstract>This thesis addresses Six Sigma process improvements and the supplier management issues resulting from the shift to external suppliers in the aftermath of a fire. Originally, this thesis was to address a lean implementation in Raytheon's substrate fabrication area. It was intended to build on work done by Satish Krishnan, which focused on a lean implementation in a related area. However, a fire in Raytheon's El Segundo substrate area forced Raytheon to outsource substrate production and brought to the forefront a different set of challenging issues. The fire shut down production for 21 days, creating pressure to capture lost ground once operations resumed. The increased demand and burden on resources during the recovery uncovered inefficiencies in key processes. One of the areas that increased in importance following the fire was magnet assembly. The first half of this thesis (Chapter 3 through Chapter 6) applies Raytheon's Six Sigma framework to the magnet assembly process in an effort to reduce non-value added work and increase standardization and control. Six Sigma incorporates many of the principles of lean manufacturing, such as continuous improvement and the elimination of non-value added work.</Abstract> <Abstract>(cont.) The first half of this thesis focuses on the Six Sigma framework because of Raytheon's strong commitment to the approach, rather than the larger set of issues in lean manufacturing. Typically, the vertical integration decision is one of the key strategic choices facing a firm. The fire crippled Raytheon's substrate fabrication area and changed this decision from a strategic one to a tactical one. Rebuilding the substrate capability in El Segundo would require close to a year. In the short term, Raytheon was forced to shift substrate production from El Segundo to external suppliers or alternate internal sites. The second half of this thesis (Chapter 7 and Chapter 8) addresses the issues associated with outsourcing a technically complex product. The initial substrate offload accelerated the timeframe for establishing suppliers and for dealing with concerns like intellectual property, coordination, dependency and the strategic consequences of outsourcing a key technology. This thesis attempts to address these implementation issues as well as the strategic implications of outsourcing substrates.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description","label":"Description","values":["Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2005.","Includes bibliographical references (p. 61)."]},{"key":"dc:description.abstract","label":"Abstract","values":["This thesis addresses Six Sigma process improvements and the supplier management issues resulting from the shift to external suppliers in the aftermath of a fire. Originally, this thesis was to address a lean implementation in Raytheon's substrate fabrication area. It was intended to build on work done by Satish Krishnan, which focused on a lean implementation in a related area. However, a fire in Raytheon's El Segundo substrate area forced Raytheon to outsource substrate production and brought to the forefront a different set of challenging issues. The fire shut down production for 21 days, creating pressure to capture lost ground once operations resumed. The increased demand and burden on resources during the recovery uncovered inefficiencies in key processes. One of the areas that increased in importance following the fire was magnet assembly. The first half of this thesis (Chapter 3 through Chapter 6) applies Raytheon's Six Sigma framework to the magnet assembly process in an effort to reduce non-value added work and increase standardization and control. Six Sigma incorporates many of the principles of lean manufacturing, such as continuous improvement and the elimination of non-value added work.","(cont.) The first half of this thesis focuses on the Six Sigma framework because of Raytheon's strong commitment to the approach, rather than the larger set of issues in lean manufacturing. Typically, the vertical integration decision is one of the key strategic choices facing a firm. The fire crippled Raytheon's substrate fabrication area and changed this decision from a strategic one to a tactical one. Rebuilding the substrate capability in El Segundo would require close to a year. In the short term, Raytheon was forced to shift substrate production from El Segundo to external suppliers or alternate internal sites. The second half of this thesis (Chapter 7 and Chapter 8) addresses the issues associated with outsourcing a technically complex product. The initial substrate offload accelerated the timeframe for establishing suppliers and for dealing with concerns like intellectual property, coordination, dependency and the strategic consequences of outsourcing a key technology. This thesis attempts to address these implementation issues as well as the strategic implications of outsourcing substrates."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M.","M.B.A."]},{"key":"dc:description.statementofresponsibility","label":"Dc Description Statementofresponsibility","values":["by Sarah Egan."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["61 p.","3110247 bytes","3112710 bytes"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Six Sigma process improvements and sourcing strategies following factory fire"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"2c1af6ae-34bb-43c8-bc54-efcf29d3b27b\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Six Sigma process improvements and sourcing strategies following factory fire</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2005</PublicationDate> <Authors> <Author> <DisplayName>Egan, Sarah (Sarah J.)</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Sloan School of Management.</Keyword> <Keyword>Civil and Environmental Engineering.</Keyword> <Keyword>Leaders for Manufacturing Program.</Keyword> <Abstract>This thesis addresses Six Sigma process improvements and the supplier management issues resulting from the shift to external suppliers in the aftermath of a fire. Originally, this thesis was to address a lean implementation in Raytheon's substrate fabrication area. It was intended to build on work done by Satish Krishnan, which focused on a lean implementation in a related area. However, a fire in Raytheon's El Segundo substrate area forced Raytheon to outsource substrate production and brought to the forefront a different set of challenging issues. The fire shut down production for 21 days, creating pressure to capture lost ground once operations resumed. The increased demand and burden on resources during the recovery uncovered inefficiencies in key processes. One of the areas that increased in importance following the fire was magnet assembly. The first half of this thesis (Chapter 3 through Chapter 6) applies Raytheon's Six Sigma framework to the magnet assembly process in an effort to reduce non-value added work and increase standardization and control. Six Sigma incorporates many of the principles of lean manufacturing, such as continuous improvement and the elimination of non-value added work.</Abstract> <Abstract>(cont.) The first half of this thesis focuses on the Six Sigma framework because of Raytheon's strong commitment to the approach, rather than the larger set of issues in lean manufacturing. Typically, the vertical integration decision is one of the key strategic choices facing a firm. The fire crippled Raytheon's substrate fabrication area and changed this decision from a strategic one to a tactical one. Rebuilding the substrate capability in El Segundo would require close to a year. In the short term, Raytheon was forced to shift substrate production from El Segundo to external suppliers or alternate internal sites. The second half of this thesis (Chapter 7 and Chapter 8) addresses the issues associated with outsourcing a technically complex product. The initial substrate offload accelerated the timeframe for establishing suppliers and for dealing with concerns like intellectual property, coordination, dependency and the strategic consequences of outsourcing a key technology. This thesis attempts to address these implementation issues as well as the strategic implications of outsourcing substrates.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["David Simchi-Levi."],"dc:contributor.other":["Leaders for Manufacturing Program."],"dc:creator":["Egan, Sarah (Sarah J.)"],"dc:date.accessioned":["2006-11-08T16:47:22Z"],"dc:date.available":["2006-11-08T16:47:22Z"],"dc:date.copyright":["2005"],"dc:date.issued":["2005"],"dc:description":["Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2005.","Includes bibliographical references (p. 61)."],"dc:description.abstract":["This thesis addresses Six Sigma process improvements and the supplier management issues resulting from the shift to external suppliers in the aftermath of a fire. Originally, this thesis was to address a lean implementation in Raytheon's substrate fabrication area. It was intended to build on work done by Satish Krishnan, which focused on a lean implementation in a related area. However, a fire in Raytheon's El Segundo substrate area forced Raytheon to outsource substrate production and brought to the forefront a different set of challenging issues. The fire shut down production for 21 days, creating pressure to capture lost ground once operations resumed. The increased demand and burden on resources during the recovery uncovered inefficiencies in key processes. One of the areas that increased in importance following the fire was magnet assembly. The first half of this thesis (Chapter 3 through Chapter 6) applies Raytheon's Six Sigma framework to the magnet assembly process in an effort to reduce non-value added work and increase standardization and control. Six Sigma incorporates many of the principles of lean manufacturing, such as continuous improvement and the elimination of non-value added work.","(cont.) The first half of this thesis focuses on the Six Sigma framework because of Raytheon's strong commitment to the approach, rather than the larger set of issues in lean manufacturing. Typically, the vertical integration decision is one of the key strategic choices facing a firm. The fire crippled Raytheon's substrate fabrication area and changed this decision from a strategic one to a tactical one. Rebuilding the substrate capability in El Segundo would require close to a year. In the short term, Raytheon was forced to shift substrate production from El Segundo to external suppliers or alternate internal sites. The second half of this thesis (Chapter 7 and Chapter 8) addresses the issues associated with outsourcing a technically complex product. The initial substrate offload accelerated the timeframe for establishing suppliers and for dealing with concerns like intellectual property, coordination, dependency and the strategic consequences of outsourcing a key technology. This thesis attempts to address these implementation issues as well as the strategic implications of outsourcing substrates."],"dc:description.degree":["S.M.","M.B.A."],"dc:description.statementofresponsibility":["by Sarah Egan."],"dc:format.extent":["61 p.","3110247 bytes","3112710 bytes"],"dc:format.mimetype":["application/pdf"],"dc:identifier.oclc":["63192648"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/34841"],"dc:language.iso":["en"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Sloan School of Management.","Civil and Environmental Engineering.","Leaders for Manufacturing Program."],"dc:title":["Six Sigma process improvements and sourcing strategies following factory fire"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"]},"updated_at":"2026-11-27T06:22:17Z"}