{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/34869"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/34869","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Total supply chain cost model","abstract":"Sourcing and outsourcing decisions have taken on increased importance within Teradyne to improve efficiency and competitiveness. This project delivered a conceptual framework and a software tool to analyze supply chain costs associated with a specified supply chain design. Determining total supply chain cost is a complex challenge. This work developed the concept of a hierarchical, inter-related, multi-level supply chain cost architecture. Within this architecture, supply chain costs can be expressed as a sum of only 5 supply chain cost factors (material, labor, logistics, inventory holding, and overhead costs). The reduction of a large number of potential cost factors eases communication about total supply chain costs within an organization. An interactive Excel VBA software was developed which allows the user to experimentally model changes to a specific supply chain design. The VBA program automatically recalculates the supply chain costs based on the changes made. The output of the program is a comparison of costs associated with different supply chain designs. In a case study, the total supply chain cost model was applied to evaluate different supply chain node locations in Southeast Asia for one of Teradyne's testers.","abstract_html":"Sourcing and outsourcing decisions have taken on increased importance within Teradyne to improve efficiency and competitiveness. This project delivered a conceptual framework and a software tool to analyze supply chain costs associated with a specified supply chain design. Determining total supply chain cost is a complex challenge. This work developed the concept of a hierarchical, inter-related, multi-level supply chain cost architecture. Within this architecture, supply chain costs can be expressed as a sum of only 5 supply chain cost factors (material, labor, logistics, inventory holding, and overhead costs). The reduction of a large number of potential cost factors eases communication about total supply chain costs within an organization. An interactive Excel VBA software was developed which allows the user to experimentally model changes to a specific supply chain design. The VBA program automatically recalculates the supply chain costs based on the changes made. The output of the program is a comparison of costs associated with different supply chain designs. In a case study, the total supply chain cost model was applied to evaluate different supply chain node locations in Southeast Asia for one of Teradyne&#x27;s testers.","abstract_has_math":false,"creators":["Wu, Claudia"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Stephen C. Graves and Abbott Weiss."],"committee_chairs":[],"committee_members":[],"year":2005,"date_issued":"2005","date_published":"2005","updated_at":"2026-11-27T06:22:28Z","subjects":["Sloan School of Management.","Electrical Engineering and Computer Science.","Leaders for Manufacturing Program."],"languages":["en"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["64560808"],"render_values":[{"text":"64560808","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/34869","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/34869","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F34869","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F34869","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Stephen C. Graves and Abbott Weiss."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Leaders for Manufacturing Program."]},{"key":"dc:creator","label":"Author","values":["Wu, Claudia"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2006-11-08T16:52:39Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2006-11-08T16:52:39Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2005"]},{"key":"dc:date.issued","label":"Date","values":["2005"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Sloan School of Management.","Electrical Engineering and Computer Science.","Leaders for Manufacturing Program."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["64560808"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/34869"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"2e22b405-6cf4-4dde-84cf-c4fb8db9ee27\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Total supply chain cost model</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2005</PublicationDate> <Authors> <Author> <DisplayName>Wu, Claudia</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Sloan School of Management.</Keyword> <Keyword>Electrical Engineering and Computer Science.</Keyword> <Keyword>Leaders for Manufacturing Program.</Keyword> <Abstract>Sourcing and outsourcing decisions have taken on increased importance within Teradyne to improve efficiency and competitiveness. This project delivered a conceptual framework and a software tool to analyze supply chain costs associated with a specified supply chain design. Determining total supply chain cost is a complex challenge. This work developed the concept of a hierarchical, inter-related, multi-level supply chain cost architecture. Within this architecture, supply chain costs can be expressed as a sum of only 5 supply chain cost factors (material, labor, logistics, inventory holding, and overhead costs). The reduction of a large number of potential cost factors eases communication about total supply chain costs within an organization. An interactive Excel VBA software was developed which allows the user to experimentally model changes to a specific supply chain design. The VBA program automatically recalculates the supply chain costs based on the changes made. The output of the program is a comparison of costs associated with different supply chain designs. In a case study, the total supply chain cost model was applied to evaluate different supply chain node locations in Southeast Asia for one of Teradyne's testers.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description","label":"Description","values":["Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Electrical Engineering and Computer Science; in conjunction with the Leaders for Manufacturing Program at MIT, 2005.","Includes bibliographical references (leaves 72-73)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Sourcing and outsourcing decisions have taken on increased importance within Teradyne to improve efficiency and competitiveness. This project delivered a conceptual framework and a software tool to analyze supply chain costs associated with a specified supply chain design. Determining total supply chain cost is a complex challenge. This work developed the concept of a hierarchical, inter-related, multi-level supply chain cost architecture. Within this architecture, supply chain costs can be expressed as a sum of only 5 supply chain cost factors (material, labor, logistics, inventory holding, and overhead costs). The reduction of a large number of potential cost factors eases communication about total supply chain costs within an organization. An interactive Excel VBA software was developed which allows the user to experimentally model changes to a specific supply chain design. The VBA program automatically recalculates the supply chain costs based on the changes made. The output of the program is a comparison of costs associated with different supply chain designs. In a case study, the total supply chain cost model was applied to evaluate different supply chain node locations in Southeast Asia for one of Teradyne's testers."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M.","M.B.A."]},{"key":"dc:description.statementofresponsibility","label":"Dc Description Statementofresponsibility","values":["by Claudia Wu."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["73 leaves","3316557 bytes","3319532 bytes"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Total supply chain cost model"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"2e22b405-6cf4-4dde-84cf-c4fb8db9ee27\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Total supply chain cost model</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2005</PublicationDate> <Authors> <Author> <DisplayName>Wu, Claudia</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Sloan School of Management.</Keyword> <Keyword>Electrical Engineering and Computer Science.</Keyword> <Keyword>Leaders for Manufacturing Program.</Keyword> <Abstract>Sourcing and outsourcing decisions have taken on increased importance within Teradyne to improve efficiency and competitiveness. This project delivered a conceptual framework and a software tool to analyze supply chain costs associated with a specified supply chain design. Determining total supply chain cost is a complex challenge. This work developed the concept of a hierarchical, inter-related, multi-level supply chain cost architecture. Within this architecture, supply chain costs can be expressed as a sum of only 5 supply chain cost factors (material, labor, logistics, inventory holding, and overhead costs). The reduction of a large number of potential cost factors eases communication about total supply chain costs within an organization. An interactive Excel VBA software was developed which allows the user to experimentally model changes to a specific supply chain design. The VBA program automatically recalculates the supply chain costs based on the changes made. The output of the program is a comparison of costs associated with different supply chain designs. In a case study, the total supply chain cost model was applied to evaluate different supply chain node locations in Southeast Asia for one of Teradyne's testers.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["Stephen C. Graves and Abbott Weiss."],"dc:contributor.other":["Leaders for Manufacturing Program."],"dc:creator":["Wu, Claudia"],"dc:date.accessioned":["2006-11-08T16:52:39Z"],"dc:date.available":["2006-11-08T16:52:39Z"],"dc:date.copyright":["2005"],"dc:date.issued":["2005"],"dc:description":["Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Electrical Engineering and Computer Science; in conjunction with the Leaders for Manufacturing Program at MIT, 2005.","Includes bibliographical references (leaves 72-73)."],"dc:description.abstract":["Sourcing and outsourcing decisions have taken on increased importance within Teradyne to improve efficiency and competitiveness. This project delivered a conceptual framework and a software tool to analyze supply chain costs associated with a specified supply chain design. Determining total supply chain cost is a complex challenge. This work developed the concept of a hierarchical, inter-related, multi-level supply chain cost architecture. Within this architecture, supply chain costs can be expressed as a sum of only 5 supply chain cost factors (material, labor, logistics, inventory holding, and overhead costs). The reduction of a large number of potential cost factors eases communication about total supply chain costs within an organization. An interactive Excel VBA software was developed which allows the user to experimentally model changes to a specific supply chain design. The VBA program automatically recalculates the supply chain costs based on the changes made. The output of the program is a comparison of costs associated with different supply chain designs. In a case study, the total supply chain cost model was applied to evaluate different supply chain node locations in Southeast Asia for one of Teradyne's testers."],"dc:description.degree":["S.M.","M.B.A."],"dc:description.statementofresponsibility":["by Claudia Wu."],"dc:format.extent":["73 leaves","3316557 bytes","3319532 bytes"],"dc:format.mimetype":["application/pdf"],"dc:identifier.oclc":["64560808"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/34869"],"dc:language.iso":["en"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Sloan School of Management.","Electrical Engineering and Computer Science.","Leaders for Manufacturing Program."],"dc:title":["Total supply chain cost model"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"]},"updated_at":"2026-11-27T06:22:28Z"}