{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/36275"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/36275","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Estimation of ship construction costs","abstract":"Since the end of the Cold War naval procurement for the US Navy has seen a dramatic decrease. This decrease in defense spending has placed existing programs under more scrutiny than previous years. As a result there is less tolerance on the part of taxpayers and Congress for procurement cost growth. This Thesis attempts to examine the current method that the Navy conducts ship cost estimates and suggests changes in order to improve the confidence level and accuracy of the forecasts. An examination of how industry is conducting cost estimates was used as a comparison to the current Navy practices. Finally using only a weight based approach to ship cost estimating is insufficient. It is necessary to develop and use a model that incorporates other cost driving factors in order to develop estimates of sufficient quality at the preliminary design level.","abstract_html":"Since the end of the Cold War naval procurement for the US Navy has seen a dramatic decrease. This decrease in defense spending has placed existing programs under more scrutiny than previous years. As a result there is less tolerance on the part of taxpayers and Congress for procurement cost growth. This Thesis attempts to examine the current method that the Navy conducts ship cost estimates and suggests changes in order to improve the confidence level and accuracy of the forecasts. An examination of how industry is conducting cost estimates was used as a comparison to the current Navy practices. Finally using only a weight based approach to ship cost estimating is insufficient. It is necessary to develop and use a model that incorporates other cost driving factors in order to develop estimates of sufficient quality at the preliminary design level.","abstract_has_math":false,"creators":["Miroyannis, Aristides"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Henry S. Marcus."],"committee_chairs":[],"committee_members":[],"year":2006,"date_issued":"2006","date_published":"2006","updated_at":"2026-11-29T16:46:09Z","subjects":["Mechanical Engineering."],"languages":["en"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["77500634"],"render_values":[{"text":"77500634","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/36275","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/36275","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F36275","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F36275","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Henry S. Marcus."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."]},{"key":"dc:creator","label":"Author","values":["Miroyannis, Aristides"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2007-02-21T13:19:55Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2007-02-21T13:19:55Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2006"]},{"key":"dc:date.issued","label":"Date","values":["2006"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Mechanical Engineering."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["77500634"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/36275"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"66bbfde8-e04c-41bb-ba32-c4aec326fb2b\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Estimation of ship construction costs</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2006</PublicationDate> <Authors> <Author> <DisplayName>Miroyannis, Aristides</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Mechanical Engineering.</Keyword> <Abstract>Since the end of the Cold War naval procurement for the US Navy has seen a dramatic decrease. This decrease in defense spending has placed existing programs under more scrutiny than previous years. As a result there is less tolerance on the part of taxpayers and Congress for procurement cost growth. This Thesis attempts to examine the current method that the Navy conducts ship cost estimates and suggests changes in order to improve the confidence level and accuracy of the forecasts. An examination of how industry is conducting cost estimates was used as a comparison to the current Navy practices. Finally using only a weight based approach to ship cost estimating is insufficient. It is necessary to develop and use a model that incorporates other cost driving factors in order to develop estimates of sufficient quality at the preliminary design level.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description","label":"Description","values":["Thesis (S.M. in Ocean Systems Management)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2006.","Includes bibliographical references (p. 105-107)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Since the end of the Cold War naval procurement for the US Navy has seen a dramatic decrease. This decrease in defense spending has placed existing programs under more scrutiny than previous years. As a result there is less tolerance on the part of taxpayers and Congress for procurement cost growth. This Thesis attempts to examine the current method that the Navy conducts ship cost estimates and suggests changes in order to improve the confidence level and accuracy of the forecasts. An examination of how industry is conducting cost estimates was used as a comparison to the current Navy practices. Finally using only a weight based approach to ship cost estimating is insufficient. It is necessary to develop and use a model that incorporates other cost driving factors in order to develop estimates of sufficient quality at the preliminary design level."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M. in Ocean Systems Management"]},{"key":"dc:description.statementofresponsibility","label":"Dc Description Statementofresponsibility","values":["by Aristides Miroyannis."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["107 p."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Estimation of ship construction costs"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"66bbfde8-e04c-41bb-ba32-c4aec326fb2b\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Estimation of ship construction costs</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2006</PublicationDate> <Authors> <Author> <DisplayName>Miroyannis, Aristides</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Mechanical Engineering.</Keyword> <Abstract>Since the end of the Cold War naval procurement for the US Navy has seen a dramatic decrease. This decrease in defense spending has placed existing programs under more scrutiny than previous years. As a result there is less tolerance on the part of taxpayers and Congress for procurement cost growth. This Thesis attempts to examine the current method that the Navy conducts ship cost estimates and suggests changes in order to improve the confidence level and accuracy of the forecasts. An examination of how industry is conducting cost estimates was used as a comparison to the current Navy practices. Finally using only a weight based approach to ship cost estimating is insufficient. It is necessary to develop and use a model that incorporates other cost driving factors in order to develop estimates of sufficient quality at the preliminary design level.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["Henry S. Marcus."],"dc:contributor.other":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."],"dc:creator":["Miroyannis, Aristides"],"dc:date.accessioned":["2007-02-21T13:19:55Z"],"dc:date.available":["2007-02-21T13:19:55Z"],"dc:date.copyright":["2006"],"dc:date.issued":["2006"],"dc:description":["Thesis (S.M. in Ocean Systems Management)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2006.","Includes bibliographical references (p. 105-107)."],"dc:description.abstract":["Since the end of the Cold War naval procurement for the US Navy has seen a dramatic decrease. This decrease in defense spending has placed existing programs under more scrutiny than previous years. As a result there is less tolerance on the part of taxpayers and Congress for procurement cost growth. This Thesis attempts to examine the current method that the Navy conducts ship cost estimates and suggests changes in order to improve the confidence level and accuracy of the forecasts. An examination of how industry is conducting cost estimates was used as a comparison to the current Navy practices. Finally using only a weight based approach to ship cost estimating is insufficient. It is necessary to develop and use a model that incorporates other cost driving factors in order to develop estimates of sufficient quality at the preliminary design level."],"dc:description.degree":["S.M. in Ocean Systems Management"],"dc:description.statementofresponsibility":["by Aristides Miroyannis."],"dc:format.extent":["107 p."],"dc:format.mimetype":["application/pdf"],"dc:identifier.oclc":["77500634"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/36275"],"dc:language.iso":["en"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Mechanical Engineering."],"dc:title":["Estimation of ship construction costs"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"]},"updated_at":"2026-11-29T16:46:09Z"}