{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/43861"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/43861","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Analysis of the effect of planning/design phase factors on rework","abstract":"Over the past several years, Raytheon has experienced great growth in their revenue and sales. One of the contributing organizations to that growth has been the Space and Airborne Systems (SAS) business sector. To continue this growth, SAS has started initiatives to improve their Operations. One of these initiatives is to reduce the amount of rework performed within the manufacturing centers. By reducing rework, SAS will be able to reduce costs, meet aggressive schedules, and continue to satisfy customer's needs. This paper describes the development of two tools to reduce rework in an attempt to meet Raytheon's goals. One is a manufacturing/Earned-Value Measurement System monitoring tool. The second tool determines the factors during the design and planning phases of a project that affect rework. Developing these two tools will help increase transparency on the manufacturing shop floor and help reduce the amount of rework performed.","abstract_html":"Over the past several years, Raytheon has experienced great growth in their revenue and sales. One of the contributing organizations to that growth has been the Space and Airborne Systems (SAS) business sector. To continue this growth, SAS has started initiatives to improve their Operations. One of these initiatives is to reduce the amount of rework performed within the manufacturing centers. By reducing rework, SAS will be able to reduce costs, meet aggressive schedules, and continue to satisfy customer&#x27;s needs. This paper describes the development of two tools to reduce rework in an attempt to meet Raytheon&#x27;s goals. One is a manufacturing/Earned-Value Measurement System monitoring tool. The second tool determines the factors during the design and planning phases of a project that affect rework. Developing these two tools will help increase transparency on the manufacturing shop floor and help reduce the amount of rework performed.","abstract_has_math":false,"creators":["Liu, Michael W. (Michael Wen-Tseng)"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Dan Frey and Roy Welsch."],"committee_chairs":[],"committee_members":[],"year":2008,"date_issued":"2008","date_published":"2008","updated_at":"2026-11-27T04:19:24Z","subjects":["Engineering Systems Division.","Sloan School of Manufacturing.","Leaders for Manufacturing Program."],"languages":["en"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["263164498"],"render_values":[{"text":"263164498","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/43861","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/43861","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F43861","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F43861","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Dan Frey and Roy Welsch."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Leaders for Manufacturing Program."]},{"key":"dc:creator","label":"Author","values":["Liu, Michael W. (Michael Wen-Tseng)"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2008-12-11T18:41:12Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2008-12-11T18:41:12Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2008"]},{"key":"dc:date.issued","label":"Date","values":["2008"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Engineering Systems Division.","Sloan School of Manufacturing.","Leaders for Manufacturing Program."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["263164498"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/43861"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"16b8318f-c812-4eae-a96f-e377f0e89a23\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Analysis of the effect of planning/design phase factors on rework</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2008</PublicationDate> <Authors> <Author> <DisplayName>Liu, Michael W. (Michael Wen-Tseng)</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Engineering Systems Division.</Keyword> <Keyword>Sloan School of Manufacturing.</Keyword> <Keyword>Leaders for Manufacturing Program.</Keyword> <Abstract>Over the past several years, Raytheon has experienced great growth in their revenue and sales. One of the contributing organizations to that growth has been the Space and Airborne Systems (SAS) business sector. To continue this growth, SAS has started initiatives to improve their Operations. One of these initiatives is to reduce the amount of rework performed within the manufacturing centers. By reducing rework, SAS will be able to reduce costs, meet aggressive schedules, and continue to satisfy customer's needs. This paper describes the development of two tools to reduce rework in an attempt to meet Raytheon's goals. One is a manufacturing/Earned-Value Measurement System monitoring tool. The second tool determines the factors during the design and planning phases of a project that affect rework. Developing these two tools will help increase transparency on the manufacturing shop floor and help reduce the amount of rework performed.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description","label":"Description","values":["Thesis (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; and, (M.B.A.) -- Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2008.","Includes bibliographical references (p. 59-60)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Over the past several years, Raytheon has experienced great growth in their revenue and sales. One of the contributing organizations to that growth has been the Space and Airborne Systems (SAS) business sector. To continue this growth, SAS has started initiatives to improve their Operations. One of these initiatives is to reduce the amount of rework performed within the manufacturing centers. By reducing rework, SAS will be able to reduce costs, meet aggressive schedules, and continue to satisfy customer's needs. This paper describes the development of two tools to reduce rework in an attempt to meet Raytheon's goals. One is a manufacturing/Earned-Value Measurement System monitoring tool. The second tool determines the factors during the design and planning phases of a project that affect rework. Developing these two tools will help increase transparency on the manufacturing shop floor and help reduce the amount of rework performed."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.B.A.","S.M."]},{"key":"dc:description.statementofresponsibility","label":"Dc Description Statementofresponsibility","values":["by Michael W. Liu."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["60 p."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Analysis of the effect of planning/design phase factors on rework"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"16b8318f-c812-4eae-a96f-e377f0e89a23\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Analysis of the effect of planning/design phase factors on rework</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2008</PublicationDate> <Authors> <Author> <DisplayName>Liu, Michael W. (Michael Wen-Tseng)</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Engineering Systems Division.</Keyword> <Keyword>Sloan School of Manufacturing.</Keyword> <Keyword>Leaders for Manufacturing Program.</Keyword> <Abstract>Over the past several years, Raytheon has experienced great growth in their revenue and sales. One of the contributing organizations to that growth has been the Space and Airborne Systems (SAS) business sector. To continue this growth, SAS has started initiatives to improve their Operations. One of these initiatives is to reduce the amount of rework performed within the manufacturing centers. By reducing rework, SAS will be able to reduce costs, meet aggressive schedules, and continue to satisfy customer's needs. This paper describes the development of two tools to reduce rework in an attempt to meet Raytheon's goals. One is a manufacturing/Earned-Value Measurement System monitoring tool. The second tool determines the factors during the design and planning phases of a project that affect rework. Developing these two tools will help increase transparency on the manufacturing shop floor and help reduce the amount of rework performed.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["Dan Frey and Roy Welsch."],"dc:contributor.other":["Leaders for Manufacturing Program."],"dc:creator":["Liu, Michael W. (Michael Wen-Tseng)"],"dc:date.accessioned":["2008-12-11T18:41:12Z"],"dc:date.available":["2008-12-11T18:41:12Z"],"dc:date.copyright":["2008"],"dc:date.issued":["2008"],"dc:description":["Thesis (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; and, (M.B.A.) -- Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2008.","Includes bibliographical references (p. 59-60)."],"dc:description.abstract":["Over the past several years, Raytheon has experienced great growth in their revenue and sales. One of the contributing organizations to that growth has been the Space and Airborne Systems (SAS) business sector. To continue this growth, SAS has started initiatives to improve their Operations. One of these initiatives is to reduce the amount of rework performed within the manufacturing centers. By reducing rework, SAS will be able to reduce costs, meet aggressive schedules, and continue to satisfy customer's needs. This paper describes the development of two tools to reduce rework in an attempt to meet Raytheon's goals. One is a manufacturing/Earned-Value Measurement System monitoring tool. The second tool determines the factors during the design and planning phases of a project that affect rework. Developing these two tools will help increase transparency on the manufacturing shop floor and help reduce the amount of rework performed."],"dc:description.degree":["M.B.A.","S.M."],"dc:description.statementofresponsibility":["by Michael W. Liu."],"dc:format.extent":["60 p."],"dc:format.mimetype":["application/pdf"],"dc:identifier.oclc":["263164498"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/43861"],"dc:language.iso":["en"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Engineering Systems Division.","Sloan School of Manufacturing.","Leaders for Manufacturing Program."],"dc:title":["Analysis of the effect of planning/design phase factors on rework"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"]},"updated_at":"2026-11-27T04:19:24Z"}