{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/46160"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/46160","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Multiple-part-type production scheduling for high volume manufacturing (token-based approach)","abstract":"Multiple-part-type production scheduling is a common industrial problem with no generalized solution. In this thesis, a systematic approach is presented to aid in the mentioned production decision making in an actual factory. This strategy involves first generating production targets by optimization followed by a real-time scheduling (token-based) method --- the Control Point Policy. Based on the simulation results, the proposed strategy is able to schedule the production effectively. In addition, it was demonstrated that there was a tradeoff between the amount of inventory and the number of changeovers. Keywords: Multiple-part-type, production scheduling, optimization, token-based Disclaimer: The content of the thesis is modified to protect the real identity of the attachment company. Company name and confidential information are omitted.","abstract_html":"Multiple-part-type production scheduling is a common industrial problem with no generalized solution. In this thesis, a systematic approach is presented to aid in the mentioned production decision making in an actual factory. This strategy involves first generating production targets by optimization followed by a real-time scheduling (token-based) method --- the Control Point Policy. Based on the simulation results, the proposed strategy is able to schedule the production effectively. In addition, it was demonstrated that there was a tradeoff between the amount of inventory and the number of changeovers. Keywords: Multiple-part-type, production scheduling, optimization, token-based Disclaimer: The content of the thesis is modified to protect the real identity of the attachment company. Company name and confidential information are omitted.","abstract_has_math":false,"creators":["Ng, Sing Hng"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Stanley B. Gershwin."],"committee_chairs":[],"committee_members":[],"year":2008,"date_issued":"2008","date_published":"2008","updated_at":"2026-11-27T06:22:13Z","subjects":["Mechanical Engineering."],"languages":["en"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["399648635"],"render_values":[{"text":"399648635","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/46160","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/46160","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F46160","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F46160","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Stanley B. Gershwin."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."]},{"key":"dc:creator","label":"Author","values":["Ng, Sing Hng"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2009-06-30T17:32:31Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2009-06-30T17:32:31Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2008"]},{"key":"dc:date.issued","label":"Date","values":["2008"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Mechanical Engineering."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["399648635"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/46160"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"2b3dd584-fde4-4f56-91ce-d07066d2c80c\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Multiple-part-type production scheduling for high volume manufacturing (token-based approach)</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2008</PublicationDate> <Authors> <Author> <DisplayName>Ng, Sing Hng</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Mechanical Engineering.</Keyword> <Abstract>Multiple-part-type production scheduling is a common industrial problem with no generalized solution. In this thesis, a systematic approach is presented to aid in the mentioned production decision making in an actual factory. This strategy involves first generating production targets by optimization followed by a real-time scheduling (token-based) method --- the Control Point Policy. Based on the simulation results, the proposed strategy is able to schedule the production effectively. In addition, it was demonstrated that there was a tradeoff between the amount of inventory and the number of changeovers. Keywords: Multiple-part-type, production scheduling, optimization, token-based Disclaimer: The content of the thesis is modified to protect the real identity of the attachment company. Company name and confidential information are omitted.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description","label":"Description","values":["Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008.","Includes bibliographical references (leaf 46)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Multiple-part-type production scheduling is a common industrial problem with no generalized solution. In this thesis, a systematic approach is presented to aid in the mentioned production decision making in an actual factory. This strategy involves first generating production targets by optimization followed by a real-time scheduling (token-based) method --- the Control Point Policy. Based on the simulation results, the proposed strategy is able to schedule the production effectively. In addition, it was demonstrated that there was a tradeoff between the amount of inventory and the number of changeovers. Keywords: Multiple-part-type, production scheduling, optimization, token-based Disclaimer: The content of the thesis is modified to protect the real identity of the attachment company. Company name and confidential information are omitted."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.Eng."]},{"key":"dc:description.statementofresponsibility","label":"Dc Description Statementofresponsibility","values":["by Sing Hng Ng."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["51 leaves"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Multiple-part-type production scheduling for high volume manufacturing (token-based approach)"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"2b3dd584-fde4-4f56-91ce-d07066d2c80c\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Multiple-part-type production scheduling for high volume manufacturing (token-based approach)</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2008</PublicationDate> <Authors> <Author> <DisplayName>Ng, Sing Hng</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Mechanical Engineering.</Keyword> <Abstract>Multiple-part-type production scheduling is a common industrial problem with no generalized solution. In this thesis, a systematic approach is presented to aid in the mentioned production decision making in an actual factory. This strategy involves first generating production targets by optimization followed by a real-time scheduling (token-based) method --- the Control Point Policy. Based on the simulation results, the proposed strategy is able to schedule the production effectively. In addition, it was demonstrated that there was a tradeoff between the amount of inventory and the number of changeovers. Keywords: Multiple-part-type, production scheduling, optimization, token-based Disclaimer: The content of the thesis is modified to protect the real identity of the attachment company. Company name and confidential information are omitted.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["Stanley B. Gershwin."],"dc:contributor.other":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."],"dc:creator":["Ng, Sing Hng"],"dc:date.accessioned":["2009-06-30T17:32:31Z"],"dc:date.available":["2009-06-30T17:32:31Z"],"dc:date.copyright":["2008"],"dc:date.issued":["2008"],"dc:description":["Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008.","Includes bibliographical references (leaf 46)."],"dc:description.abstract":["Multiple-part-type production scheduling is a common industrial problem with no generalized solution. In this thesis, a systematic approach is presented to aid in the mentioned production decision making in an actual factory. This strategy involves first generating production targets by optimization followed by a real-time scheduling (token-based) method --- the Control Point Policy. Based on the simulation results, the proposed strategy is able to schedule the production effectively. In addition, it was demonstrated that there was a tradeoff between the amount of inventory and the number of changeovers. Keywords: Multiple-part-type, production scheduling, optimization, token-based Disclaimer: The content of the thesis is modified to protect the real identity of the attachment company. Company name and confidential information are omitted."],"dc:description.degree":["M.Eng."],"dc:description.statementofresponsibility":["by Sing Hng Ng."],"dc:format.extent":["51 leaves"],"dc:format.mimetype":["application/pdf"],"dc:identifier.oclc":["399648635"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/46160"],"dc:language.iso":["en"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Mechanical Engineering."],"dc:title":["Multiple-part-type production scheduling for high volume manufacturing (token-based approach)"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"]},"updated_at":"2026-11-27T06:22:13Z"}