{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/66052"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/66052","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Improving work flow management in an order fulfillment organization","abstract":"Amazon.com is experiencing dramatic growth in customer demand through increasingly diversified product offerings and from introduction of Amazon Prime Shipping. As the volume of customer orders increases and a higher number of orders placed are single unit orders, labor and work management at the fulfillment centers must be improved to increase the throughput while fulfilling orders on time. Managing outbound work flow and labor at Amazon fulfillment centers is a complicated process that is controlled manually through limited tools, but has large implications on operational performance and customer experience. The six month LGO project focused on improving the outbound flow management process at the RNOI Fulfillment Center located in Fernley, Nevada. This thesis analyzes the current workflow management process, identifies major concerns with this process, and outlines the solutions implemented to improve flow 'management. The project was approached using lean principles and methodologies, especially when identifying and implementing solutions. Specifically, the concepts of Genchi Gembutsu, PDCA (Plan/Do/Check/Action) and effective change management were used heavily. The major changes implemented were flow management structure change, standardized training and tools to make flow decisions, optimal local settings for work in progress, inclusion of charge forecast into labor planning and hourly tracking of shift performance. The results demonstrated an annual cost savings of $353,000 at RNOI. The concepts described in this thesis extend beyond a fulfillment center setting to planning labor in manufacturing, service operations like customer service centers and healthcare facilities.","abstract_html":"Amazon.com is experiencing dramatic growth in customer demand through increasingly diversified product offerings and from introduction of Amazon Prime Shipping. As the volume of customer orders increases and a higher number of orders placed are single unit orders, labor and work management at the fulfillment centers must be improved to increase the throughput while fulfilling orders on time. Managing outbound work flow and labor at Amazon fulfillment centers is a complicated process that is controlled manually through limited tools, but has large implications on operational performance and customer experience. The six month LGO project focused on improving the outbound flow management process at the RNOI Fulfillment Center located in Fernley, Nevada. This thesis analyzes the current workflow management process, identifies major concerns with this process, and outlines the solutions implemented to improve flow &#x27;management. The project was approached using lean principles and methodologies, especially when identifying and implementing solutions. Specifically, the concepts of Genchi Gembutsu, PDCA (Plan/Do/Check/Action) and effective change management were used heavily. The major changes implemented were flow management structure change, standardized training and tools to make flow decisions, optimal local settings for work in progress, inclusion of charge forecast into labor planning and hourly tracking of shift performance. The results demonstrated an annual cost savings of $353,000 at RNOI. The concepts described in this thesis extend beyond a fulfillment center setting to planning labor in manufacturing, service operations like customer service centers and healthcare facilities.","abstract_has_math":false,"creators":["Sandhu, Kuldip (Kuldip Kaur)"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Chris Caplice, Andreas Schulz and Roy E. Welsch."],"committee_chairs":[],"committee_members":[],"year":2011,"date_issued":"2011","date_published":"2011","updated_at":"2026-11-27T06:22:37Z","subjects":["Sloan School of Management.","Engineering Systems Division.","Leaders for Global Operations Program."],"languages":["en"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["752310408"],"render_values":[{"text":"752310408","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/66052","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/66052","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F66052","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F66052","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Chris Caplice, Andreas Schulz and Roy E. Welsch."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Leaders for Global Operations Program."]},{"key":"dc:creator","label":"Author","values":["Sandhu, Kuldip (Kuldip Kaur)"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2011-09-27T18:37:11Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2011-09-27T18:37:11Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2011"]},{"key":"dc:date.issued","label":"Date","values":["2011"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Sloan School of Management.","Engineering Systems Division.","Leaders for Global Operations Program."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["752310408"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/66052"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"2fa5e490-e6e4-441e-add3-c997e2107168\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Improving work flow management in an order fulfillment organization</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2011</PublicationDate> <Authors> <Author> <DisplayName>Sandhu, Kuldip (Kuldip Kaur)</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Sloan School of Management.</Keyword> <Keyword>Engineering Systems Division.</Keyword> <Keyword>Leaders for Global Operations Program.</Keyword> <Abstract>Amazon.com is experiencing dramatic growth in customer demand through increasingly diversified product offerings and from introduction of Amazon Prime Shipping. As the volume of customer orders increases and a higher number of orders placed are single unit orders, labor and work management at the fulfillment centers must be improved to increase the throughput while fulfilling orders on time. Managing outbound work flow and labor at Amazon fulfillment centers is a complicated process that is controlled manually through limited tools, but has large implications on operational performance and customer experience. The six month LGO project focused on improving the outbound flow management process at the RNOI Fulfillment Center located in Fernley, Nevada. This thesis analyzes the current workflow management process, identifies major concerns with this process, and outlines the solutions implemented to improve flow 'management. The project was approached using lean principles and methodologies, especially when identifying and implementing solutions. Specifically, the concepts of Genchi Gembutsu, PDCA (Plan/Do/Check/Action) and effective change management were used heavily. The major changes implemented were flow management structure change, standardized training and tools to make flow decisions, optimal local settings for work in progress, inclusion of charge forecast into labor planning and hourly tracking of shift performance. The results demonstrated an annual cost savings of $353,000 at RNOI. The concepts described in this thesis extend beyond a fulfillment center setting to planning labor in manufacturing, service operations like customer service centers and healthcare facilities.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description","label":"Description","values":["Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; in conjunction with the Leaders for Global Operations Program at MIT, 2011.","Cataloged from PDF version of thesis.","Includes bibliographical references (p. 75-76)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Amazon.com is experiencing dramatic growth in customer demand through increasingly diversified product offerings and from introduction of Amazon Prime Shipping. As the volume of customer orders increases and a higher number of orders placed are single unit orders, labor and work management at the fulfillment centers must be improved to increase the throughput while fulfilling orders on time. Managing outbound work flow and labor at Amazon fulfillment centers is a complicated process that is controlled manually through limited tools, but has large implications on operational performance and customer experience. The six month LGO project focused on improving the outbound flow management process at the RNOI Fulfillment Center located in Fernley, Nevada. This thesis analyzes the current workflow management process, identifies major concerns with this process, and outlines the solutions implemented to improve flow 'management. The project was approached using lean principles and methodologies, especially when identifying and implementing solutions. Specifically, the concepts of Genchi Gembutsu, PDCA (Plan/Do/Check/Action) and effective change management were used heavily. The major changes implemented were flow management structure change, standardized training and tools to make flow decisions, optimal local settings for work in progress, inclusion of charge forecast into labor planning and hourly tracking of shift performance. The results demonstrated an annual cost savings of $353,000 at RNOI. The concepts described in this thesis extend beyond a fulfillment center setting to planning labor in manufacturing, service operations like customer service centers and healthcare facilities."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M.","M.B.A."]},{"key":"dc:description.statementofresponsibility","label":"Dc Description Statementofresponsibility","values":["by Kuldip Sandhu."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["76 p."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Improving work flow management in an order fulfillment organization"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"2fa5e490-e6e4-441e-add3-c997e2107168\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Improving work flow management in an order fulfillment organization</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2011</PublicationDate> <Authors> <Author> <DisplayName>Sandhu, Kuldip (Kuldip Kaur)</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Sloan School of Management.</Keyword> <Keyword>Engineering Systems Division.</Keyword> <Keyword>Leaders for Global Operations Program.</Keyword> <Abstract>Amazon.com is experiencing dramatic growth in customer demand through increasingly diversified product offerings and from introduction of Amazon Prime Shipping. As the volume of customer orders increases and a higher number of orders placed are single unit orders, labor and work management at the fulfillment centers must be improved to increase the throughput while fulfilling orders on time. Managing outbound work flow and labor at Amazon fulfillment centers is a complicated process that is controlled manually through limited tools, but has large implications on operational performance and customer experience. The six month LGO project focused on improving the outbound flow management process at the RNOI Fulfillment Center located in Fernley, Nevada. This thesis analyzes the current workflow management process, identifies major concerns with this process, and outlines the solutions implemented to improve flow 'management. The project was approached using lean principles and methodologies, especially when identifying and implementing solutions. Specifically, the concepts of Genchi Gembutsu, PDCA (Plan/Do/Check/Action) and effective change management were used heavily. The major changes implemented were flow management structure change, standardized training and tools to make flow decisions, optimal local settings for work in progress, inclusion of charge forecast into labor planning and hourly tracking of shift performance. The results demonstrated an annual cost savings of $353,000 at RNOI. The concepts described in this thesis extend beyond a fulfillment center setting to planning labor in manufacturing, service operations like customer service centers and healthcare facilities.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["Chris Caplice, Andreas Schulz and Roy E. Welsch."],"dc:contributor.other":["Leaders for Global Operations Program."],"dc:creator":["Sandhu, Kuldip (Kuldip Kaur)"],"dc:date.accessioned":["2011-09-27T18:37:11Z"],"dc:date.available":["2011-09-27T18:37:11Z"],"dc:date.copyright":["2011"],"dc:date.issued":["2011"],"dc:description":["Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; in conjunction with the Leaders for Global Operations Program at MIT, 2011.","Cataloged from PDF version of thesis.","Includes bibliographical references (p. 75-76)."],"dc:description.abstract":["Amazon.com is experiencing dramatic growth in customer demand through increasingly diversified product offerings and from introduction of Amazon Prime Shipping. As the volume of customer orders increases and a higher number of orders placed are single unit orders, labor and work management at the fulfillment centers must be improved to increase the throughput while fulfilling orders on time. Managing outbound work flow and labor at Amazon fulfillment centers is a complicated process that is controlled manually through limited tools, but has large implications on operational performance and customer experience. The six month LGO project focused on improving the outbound flow management process at the RNOI Fulfillment Center located in Fernley, Nevada. This thesis analyzes the current workflow management process, identifies major concerns with this process, and outlines the solutions implemented to improve flow 'management. The project was approached using lean principles and methodologies, especially when identifying and implementing solutions. Specifically, the concepts of Genchi Gembutsu, PDCA (Plan/Do/Check/Action) and effective change management were used heavily. The major changes implemented were flow management structure change, standardized training and tools to make flow decisions, optimal local settings for work in progress, inclusion of charge forecast into labor planning and hourly tracking of shift performance. The results demonstrated an annual cost savings of $353,000 at RNOI. The concepts described in this thesis extend beyond a fulfillment center setting to planning labor in manufacturing, service operations like customer service centers and healthcare facilities."],"dc:description.degree":["S.M.","M.B.A."],"dc:description.statementofresponsibility":["by Kuldip Sandhu."],"dc:format.extent":["76 p."],"dc:format.mimetype":["application/pdf"],"dc:identifier.oclc":["752310408"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/66052"],"dc:language.iso":["en"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Sloan School of Management.","Engineering Systems Division.","Leaders for Global Operations Program."],"dc:title":["Improving work flow management in an order fulfillment organization"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"]},"updated_at":"2026-11-27T06:22:37Z"}