{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/81126"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/81126","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Prospects for grid-connected solar PV in Kenya","abstract":"Kenya's electric power system is heavily reliant on hydropower, leaving it vulnerable during recurring droughts. Supply shortfalls are currently met through the use of expensive leased diesel generation. Therefore, plans for new generation focus on geothermal and conventional thermal sources. While these technologies offer a lower-cost alternative to leased diesel, they require large upfront capital investments in new infrastructure. I propose that grid-connected solar PV offers an alternative solution to displace expensive diesel generation, while capitalizing on Kenya's abundant solar resource and avoiding large upfront financing requirements. Coordinated operation of Kenya's extensive reservoir hydro capacity can overcome intermittency problems associated with solar generation and offer a low-cost path to grid-connected solar PV by eliminating the need for additional investment in storage. This study uses a static expansion planning model of Kenya's power system representing the years 2012 and 2017 to evaluate the feasibility of grid-connected solar PV under different price and hydrological conditions. These results reveal that high penetrations of solar PV can be integrated into the current system without increasing total system costs. By 2017 extensive planned investments in low-cost geothermal, imported hydro, and wind power will significantly reduce production from fuel oil plants and solar PV is no longer economically competitive at current prices. The 2017 analysis does not evaluate scenarios where the price of solar PV decreases, new capacity is delayed, or PV capacity eliminates the need for new transmission infrastructure required for planned generation assets. Any of these scenarios increases the competitiveness of solar PV in the 2017 system. The methodology developed in this study could be used for system level evaluation of solar and other intermittent renewables in other hydro-dominated electric power systems in Africa.","abstract_html":"Kenya&#x27;s electric power system is heavily reliant on hydropower, leaving it vulnerable during recurring droughts. Supply shortfalls are currently met through the use of expensive leased diesel generation. Therefore, plans for new generation focus on geothermal and conventional thermal sources. While these technologies offer a lower-cost alternative to leased diesel, they require large upfront capital investments in new infrastructure. I propose that grid-connected solar PV offers an alternative solution to displace expensive diesel generation, while capitalizing on Kenya&#x27;s abundant solar resource and avoiding large upfront financing requirements. Coordinated operation of Kenya&#x27;s extensive reservoir hydro capacity can overcome intermittency problems associated with solar generation and offer a low-cost path to grid-connected solar PV by eliminating the need for additional investment in storage. This study uses a static expansion planning model of Kenya&#x27;s power system representing the years 2012 and 2017 to evaluate the feasibility of grid-connected solar PV under different price and hydrological conditions. These results reveal that high penetrations of solar PV can be integrated into the current system without increasing total system costs. By 2017 extensive planned investments in low-cost geothermal, imported hydro, and wind power will significantly reduce production from fuel oil plants and solar PV is no longer economically competitive at current prices. The 2017 analysis does not evaluate scenarios where the price of solar PV decreases, new capacity is delayed, or PV capacity eliminates the need for new transmission infrastructure required for planned generation assets. Any of these scenarios increases the competitiveness of solar PV in the 2017 system. The methodology developed in this study could be used for system level evaluation of solar and other intermittent renewables in other hydro-dominated electric power systems in Africa.","abstract_has_math":false,"creators":["Rose, Amy Michelle"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Robert J. Stoner and Ignacio J. Pérez-Arriaga."],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013","date_published":"2013","updated_at":"2026-11-27T06:23:27Z","subjects":["Engineering Systems Division."],"languages":["en"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["858280418"],"render_values":[{"text":"858280418","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/81126","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/81126","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F81126","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F81126","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Robert J. Stoner and Ignacio J. Pérez-Arriaga."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Engineering Systems Division."]},{"key":"dc:creator","label":"Author","values":["Rose, Amy Michelle"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:coverage.spatial","label":"Dc Coverage Spatial","values":["f-ke---"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2013-09-24T19:44:34Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2013-09-24T19:44:34Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2013"]},{"key":"dc:date.issued","label":"Date","values":["2013"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Engineering Systems Division."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["858280418"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/81126"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"3a39b325-f1cd-45c4-9e67-a8ba255159c7\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Prospects for grid-connected solar PV in Kenya</Title> <Subtitle>Prospects for grid-connected solar photovoltaics in Kenya</Subtitle> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2013</PublicationDate> <Authors> <Author> <DisplayName>Rose, Amy Michelle</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Engineering Systems Division.</Keyword> <Abstract>Kenya's electric power system is heavily reliant on hydropower, leaving it vulnerable during recurring droughts. Supply shortfalls are currently met through the use of expensive leased diesel generation. Therefore, plans for new generation focus on geothermal and conventional thermal sources. While these technologies offer a lower-cost alternative to leased diesel, they require large upfront capital investments in new infrastructure. I propose that grid-connected solar PV offers an alternative solution to displace expensive diesel generation, while capitalizing on Kenya's abundant solar resource and avoiding large upfront financing requirements. Coordinated operation of Kenya's extensive reservoir hydro capacity can overcome intermittency problems associated with solar generation and offer a low-cost path to grid-connected solar PV by eliminating the need for additional investment in storage. This study uses a static expansion planning model of Kenya's power system representing the years 2012 and 2017 to evaluate the feasibility of grid-connected solar PV under different price and hydrological conditions. These results reveal that high penetrations of solar PV can be integrated into the current system without increasing total system costs. By 2017 extensive planned investments in low-cost geothermal, imported hydro, and wind power will significantly reduce production from fuel oil plants and solar PV is no longer economically competitive at current prices. The 2017 analysis does not evaluate scenarios where the price of solar PV decreases, new capacity is delayed, or PV capacity eliminates the need for new transmission infrastructure required for planned generation assets. Any of these scenarios increases the competitiveness of solar PV in the 2017 system. The methodology developed in this study could be used for system level evaluation of solar and other intermittent renewables in other hydro-dominated electric power systems in Africa.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description","label":"Description","values":["Thesis (S.M. in Technology and Policy)--Massachusetts Institute of Technology, Engineering Systems Division, 2013.","Cataloged from PDF version of thesis.","Includes bibliographical references (p. 187-195)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Kenya's electric power system is heavily reliant on hydropower, leaving it vulnerable during recurring droughts. Supply shortfalls are currently met through the use of expensive leased diesel generation. Therefore, plans for new generation focus on geothermal and conventional thermal sources. While these technologies offer a lower-cost alternative to leased diesel, they require large upfront capital investments in new infrastructure. I propose that grid-connected solar PV offers an alternative solution to displace expensive diesel generation, while capitalizing on Kenya's abundant solar resource and avoiding large upfront financing requirements. Coordinated operation of Kenya's extensive reservoir hydro capacity can overcome intermittency problems associated with solar generation and offer a low-cost path to grid-connected solar PV by eliminating the need for additional investment in storage. This study uses a static expansion planning model of Kenya's power system representing the years 2012 and 2017 to evaluate the feasibility of grid-connected solar PV under different price and hydrological conditions. These results reveal that high penetrations of solar PV can be integrated into the current system without increasing total system costs. By 2017 extensive planned investments in low-cost geothermal, imported hydro, and wind power will significantly reduce production from fuel oil plants and solar PV is no longer economically competitive at current prices. The 2017 analysis does not evaluate scenarios where the price of solar PV decreases, new capacity is delayed, or PV capacity eliminates the need for new transmission infrastructure required for planned generation assets. Any of these scenarios increases the competitiveness of solar PV in the 2017 system. The methodology developed in this study could be used for system level evaluation of solar and other intermittent renewables in other hydro-dominated electric power systems in Africa."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.M. in Technology and Policy"]},{"key":"dc:description.statementofresponsibility","label":"Dc Description Statementofresponsibility","values":["by Amy Michelle Rose."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["195 p."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Prospects for grid-connected solar PV in Kenya"]},{"key":"dc:title.alternative","label":"Alternative Title","values":["Prospects for grid-connected solar photovoltaics in Kenya"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"3a39b325-f1cd-45c4-9e67-a8ba255159c7\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Prospects for grid-connected solar PV in Kenya</Title> <Subtitle>Prospects for grid-connected solar photovoltaics in Kenya</Subtitle> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2013</PublicationDate> <Authors> <Author> <DisplayName>Rose, Amy Michelle</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Engineering Systems Division.</Keyword> <Abstract>Kenya's electric power system is heavily reliant on hydropower, leaving it vulnerable during recurring droughts. Supply shortfalls are currently met through the use of expensive leased diesel generation. Therefore, plans for new generation focus on geothermal and conventional thermal sources. While these technologies offer a lower-cost alternative to leased diesel, they require large upfront capital investments in new infrastructure. I propose that grid-connected solar PV offers an alternative solution to displace expensive diesel generation, while capitalizing on Kenya's abundant solar resource and avoiding large upfront financing requirements. Coordinated operation of Kenya's extensive reservoir hydro capacity can overcome intermittency problems associated with solar generation and offer a low-cost path to grid-connected solar PV by eliminating the need for additional investment in storage. This study uses a static expansion planning model of Kenya's power system representing the years 2012 and 2017 to evaluate the feasibility of grid-connected solar PV under different price and hydrological conditions. These results reveal that high penetrations of solar PV can be integrated into the current system without increasing total system costs. By 2017 extensive planned investments in low-cost geothermal, imported hydro, and wind power will significantly reduce production from fuel oil plants and solar PV is no longer economically competitive at current prices. The 2017 analysis does not evaluate scenarios where the price of solar PV decreases, new capacity is delayed, or PV capacity eliminates the need for new transmission infrastructure required for planned generation assets. Any of these scenarios increases the competitiveness of solar PV in the 2017 system. The methodology developed in this study could be used for system level evaluation of solar and other intermittent renewables in other hydro-dominated electric power systems in Africa.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["Robert J. Stoner and Ignacio J. Pérez-Arriaga."],"dc:contributor.other":["Massachusetts Institute of Technology. Engineering Systems Division."],"dc:coverage.spatial":["f-ke---"],"dc:creator":["Rose, Amy Michelle"],"dc:date.accessioned":["2013-09-24T19:44:34Z"],"dc:date.available":["2013-09-24T19:44:34Z"],"dc:date.copyright":["2013"],"dc:date.issued":["2013"],"dc:description":["Thesis (S.M. in Technology and Policy)--Massachusetts Institute of Technology, Engineering Systems Division, 2013.","Cataloged from PDF version of thesis.","Includes bibliographical references (p. 187-195)."],"dc:description.abstract":["Kenya's electric power system is heavily reliant on hydropower, leaving it vulnerable during recurring droughts. Supply shortfalls are currently met through the use of expensive leased diesel generation. Therefore, plans for new generation focus on geothermal and conventional thermal sources. While these technologies offer a lower-cost alternative to leased diesel, they require large upfront capital investments in new infrastructure. I propose that grid-connected solar PV offers an alternative solution to displace expensive diesel generation, while capitalizing on Kenya's abundant solar resource and avoiding large upfront financing requirements. Coordinated operation of Kenya's extensive reservoir hydro capacity can overcome intermittency problems associated with solar generation and offer a low-cost path to grid-connected solar PV by eliminating the need for additional investment in storage. This study uses a static expansion planning model of Kenya's power system representing the years 2012 and 2017 to evaluate the feasibility of grid-connected solar PV under different price and hydrological conditions. These results reveal that high penetrations of solar PV can be integrated into the current system without increasing total system costs. By 2017 extensive planned investments in low-cost geothermal, imported hydro, and wind power will significantly reduce production from fuel oil plants and solar PV is no longer economically competitive at current prices. The 2017 analysis does not evaluate scenarios where the price of solar PV decreases, new capacity is delayed, or PV capacity eliminates the need for new transmission infrastructure required for planned generation assets. Any of these scenarios increases the competitiveness of solar PV in the 2017 system. The methodology developed in this study could be used for system level evaluation of solar and other intermittent renewables in other hydro-dominated electric power systems in Africa."],"dc:description.degree":["S.M. in Technology and Policy"],"dc:description.statementofresponsibility":["by Amy Michelle Rose."],"dc:format.extent":["195 p."],"dc:format.mimetype":["application/pdf"],"dc:identifier.oclc":["858280418"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/81126"],"dc:language.iso":["en"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Engineering Systems Division."],"dc:title":["Prospects for grid-connected solar PV in Kenya"],"dc:title.alternative":["Prospects for grid-connected solar photovoltaics in Kenya"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"]},"updated_at":"2026-11-27T06:23:27Z"}