{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/85792"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/85792","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Prioritization and control of order picking system","abstract":"Order Picking System (OPS) efficiency at a warehouse was studied with the goal of reducing production order lead time to 8 hours. Current material flow system and strategy were studied through interviews with personnel involved. In addition, data extraction and analysis were performed using the company's SAP Extended Warehouse Management (EWM) database to analyze the past performance in the warehouse. Three areas for improvement are recommended. First, updating the Vertical Lift Module (VLM) picking machine to operate in the First-In-First-Out manner will solve the picking idle time in other areas with an expected average time savings of 20 minutes per part. Second, integrating a signal to notify pickers when there are pick tasks outstanding in the areas will both reduce picking time lag and prevent the parts from staying overnight. Lastly, implementing the correlation-based storage assignment to store parts that are usually ordered together in the same vicinity is expected to saves 72 minutes of picking time a day on average. These recommendations are to be combined with other material flow improvements. It was determined that the goal of 8 hours lead time is unrealistic. However, calculations suggest that lead time will be reduced to 16 hours.","abstract_html":"Order Picking System (OPS) efficiency at a warehouse was studied with the goal of reducing production order lead time to 8 hours. Current material flow system and strategy were studied through interviews with personnel involved. In addition, data extraction and analysis were performed using the company&#x27;s SAP Extended Warehouse Management (EWM) database to analyze the past performance in the warehouse. Three areas for improvement are recommended. First, updating the Vertical Lift Module (VLM) picking machine to operate in the First-In-First-Out manner will solve the picking idle time in other areas with an expected average time savings of 20 minutes per part. Second, integrating a signal to notify pickers when there are pick tasks outstanding in the areas will both reduce picking time lag and prevent the parts from staying overnight. Lastly, implementing the correlation-based storage assignment to store parts that are usually ordered together in the same vicinity is expected to saves 72 minutes of picking time a day on average. These recommendations are to be combined with other material flow improvements. It was determined that the goal of 8 hours lead time is unrealistic. However, calculations suggest that lead time will be reduced to 16 hours.","abstract_has_math":false,"creators":["Kanburapa, Prachyathit"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Stephen C. Graves."],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013","date_published":"2013","updated_at":"2026-11-27T07:24:36Z","subjects":["Mechanical Engineering."],"languages":["en"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["871550492"],"render_values":[{"text":"871550492","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/85792","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/85792","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F85792","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F85792","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Stephen C. Graves."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Department of Mechanical Engineering."]},{"key":"dc:creator","label":"Author","values":["Kanburapa, Prachyathit"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-03-19T15:45:40Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-03-19T15:45:40Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2013"]},{"key":"dc:date.issued","label":"Date","values":["2013"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Mechanical Engineering."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["871550492"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/85792"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"4093684a-d49a-4ca4-bea2-c5b485c0bec2\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Prioritization and control of order picking system</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2013</PublicationDate> <Authors> <Author> <DisplayName>Kanburapa, Prachyathit</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Mechanical Engineering.</Keyword> <Abstract>Order Picking System (OPS) efficiency at a warehouse was studied with the goal of reducing production order lead time to 8 hours. Current material flow system and strategy were studied through interviews with personnel involved. In addition, data extraction and analysis were performed using the company's SAP Extended Warehouse Management (EWM) database to analyze the past performance in the warehouse. Three areas for improvement are recommended. First, updating the Vertical Lift Module (VLM) picking machine to operate in the First-In-First-Out manner will solve the picking idle time in other areas with an expected average time savings of 20 minutes per part. Second, integrating a signal to notify pickers when there are pick tasks outstanding in the areas will both reduce picking time lag and prevent the parts from staying overnight. Lastly, implementing the correlation-based storage assignment to store parts that are usually ordered together in the same vicinity is expected to saves 72 minutes of picking time a day on average. These recommendations are to be combined with other material flow improvements. It was determined that the goal of 8 hours lead time is unrealistic. However, calculations suggest that lead time will be reduced to 16 hours.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description","label":"Description","values":["Thesis: M. Eng. in Manufacturing, Massachusetts Institute of Technology, Department of Mechanical Engineering, 2013.","Cataloged from PDF version of thesis.","Includes bibliographical references (pages 82-84)."]},{"key":"dc:description.abstract","label":"Abstract","values":["Order Picking System (OPS) efficiency at a warehouse was studied with the goal of reducing production order lead time to 8 hours. Current material flow system and strategy were studied through interviews with personnel involved. In addition, data extraction and analysis were performed using the company's SAP Extended Warehouse Management (EWM) database to analyze the past performance in the warehouse. Three areas for improvement are recommended. First, updating the Vertical Lift Module (VLM) picking machine to operate in the First-In-First-Out manner will solve the picking idle time in other areas with an expected average time savings of 20 minutes per part. Second, integrating a signal to notify pickers when there are pick tasks outstanding in the areas will both reduce picking time lag and prevent the parts from staying overnight. Lastly, implementing the correlation-based storage assignment to store parts that are usually ordered together in the same vicinity is expected to saves 72 minutes of picking time a day on average. These recommendations are to be combined with other material flow improvements. It was determined that the goal of 8 hours lead time is unrealistic. However, calculations suggest that lead time will be reduced to 16 hours."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["M.Eng. in Manufacturing"]},{"key":"dc:description.statementofresponsibility","label":"Dc Description Statementofresponsibility","values":["by Prachyathit Kanburapa."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["84 pages"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Prioritization and control of order picking system"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"4093684a-d49a-4ca4-bea2-c5b485c0bec2\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Prioritization and control of order picking system</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2013</PublicationDate> <Authors> <Author> <DisplayName>Kanburapa, Prachyathit</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Mechanical Engineering.</Keyword> <Abstract>Order Picking System (OPS) efficiency at a warehouse was studied with the goal of reducing production order lead time to 8 hours. Current material flow system and strategy were studied through interviews with personnel involved. In addition, data extraction and analysis were performed using the company's SAP Extended Warehouse Management (EWM) database to analyze the past performance in the warehouse. Three areas for improvement are recommended. First, updating the Vertical Lift Module (VLM) picking machine to operate in the First-In-First-Out manner will solve the picking idle time in other areas with an expected average time savings of 20 minutes per part. Second, integrating a signal to notify pickers when there are pick tasks outstanding in the areas will both reduce picking time lag and prevent the parts from staying overnight. Lastly, implementing the correlation-based storage assignment to store parts that are usually ordered together in the same vicinity is expected to saves 72 minutes of picking time a day on average. These recommendations are to be combined with other material flow improvements. It was determined that the goal of 8 hours lead time is unrealistic. However, calculations suggest that lead time will be reduced to 16 hours.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["Stephen C. Graves."],"dc:contributor.other":["Massachusetts Institute of Technology. Department of Mechanical Engineering."],"dc:creator":["Kanburapa, Prachyathit"],"dc:date.accessioned":["2014-03-19T15:45:40Z"],"dc:date.available":["2014-03-19T15:45:40Z"],"dc:date.copyright":["2013"],"dc:date.issued":["2013"],"dc:description":["Thesis: M. Eng. in Manufacturing, Massachusetts Institute of Technology, Department of Mechanical Engineering, 2013.","Cataloged from PDF version of thesis.","Includes bibliographical references (pages 82-84)."],"dc:description.abstract":["Order Picking System (OPS) efficiency at a warehouse was studied with the goal of reducing production order lead time to 8 hours. Current material flow system and strategy were studied through interviews with personnel involved. In addition, data extraction and analysis were performed using the company's SAP Extended Warehouse Management (EWM) database to analyze the past performance in the warehouse. Three areas for improvement are recommended. First, updating the Vertical Lift Module (VLM) picking machine to operate in the First-In-First-Out manner will solve the picking idle time in other areas with an expected average time savings of 20 minutes per part. Second, integrating a signal to notify pickers when there are pick tasks outstanding in the areas will both reduce picking time lag and prevent the parts from staying overnight. Lastly, implementing the correlation-based storage assignment to store parts that are usually ordered together in the same vicinity is expected to saves 72 minutes of picking time a day on average. These recommendations are to be combined with other material flow improvements. It was determined that the goal of 8 hours lead time is unrealistic. However, calculations suggest that lead time will be reduced to 16 hours."],"dc:description.degree":["M.Eng. in Manufacturing"],"dc:description.statementofresponsibility":["by Prachyathit Kanburapa."],"dc:format.extent":["84 pages"],"dc:format.mimetype":["application/pdf"],"dc:identifier.oclc":["871550492"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/85792"],"dc:language.iso":["en"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Mechanical Engineering."],"dc:title":["Prioritization and control of order picking system"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"]},"updated_at":"2026-11-27T07:24:36Z"}