{"id":{"repo_id":"mit","oai_identifier":"oai:dspace.mit.edu:1721.1/9356"},"canonical_url":"https://search.ndltd.org/etd/mit/oai:dspace.mit.edu:1721.1/9356","repository":{"repo_id":"mit","name":"MIT","base_url":"https://dspace.mit.edu/oai/request"},"display":{"title":"Development and implementation of setup time reduction strategies for a 700-ton Danley progressive die press","abstract":"Setup time reduction is one of the principle forces enabling lean manufacturing. This thesis documents the formulation and reduction to practice of two stages of a setup time reduction strategy for a 700-ton Danley progressive die press. Common methodologies of setup time reduction were presented and discussed, with the purpose of developing a general algebra for setup reduction. The algebra was applied to develop a specific strategy for setup time reduction of a 700-ton Danley progressive die press. Attempts were then made to reduce the strategy to practice.","abstract_html":"Setup time reduction is one of the principle forces enabling lean manufacturing. This thesis documents the formulation and reduction to practice of two stages of a setup time reduction strategy for a 700-ton Danley progressive die press. Common methodologies of setup time reduction were presented and discussed, with the purpose of developing a general algebra for setup reduction. The algebra was applied to develop a specific strategy for setup time reduction of a 700-ton Danley progressive die press. Attempts were then made to reduce the strategy to practice.","abstract_has_math":false,"creators":["Souke, Chad C. (Chad Conway), 1976-"],"institution":"Massachusetts Institute of Technology","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["David Cochran."],"committee_chairs":[],"committee_members":[],"year":1999,"date_issued":"1999","date_published":"1999","updated_at":"2026-11-27T04:19:48Z","subjects":["Mechanical Engineering."],"languages":["en"],"rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"rights_urls":["http://dspace.mit.edu/handle/1721.1/7582"],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["44458622"],"render_values":[{"text":"44458622","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/1721.1/9356","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/1721.1/9356","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Amit%3Aoai%3Adspace.mit.edu%3A1721.1%2F9356","prefix":"oai_dc"},"source_record":{"url":"https://dspace.mit.edu/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adspace.mit.edu%3A1721.1%2F9356","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["David Cochran."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."]},{"key":"dc:creator","label":"Author","values":["Souke, Chad C. (Chad Conway), 1976-"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2005-08-22T20:33:50Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2005-08-22T20:33:50Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["1999"]},{"key":"dc:date.issued","label":"Date","values":["1999"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Mechanical Engineering."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://dspace.mit.edu/handle/1721.1/7582"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["44458622"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://hdl.handle.net/1721.1/9356"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"1b7585dd-f03b-4f62-909d-b47f84d5a5d2\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Development and implementation of setup time reduction strategies for a 700-ton Danley progressive die press</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>1999</PublicationDate> <Authors> <Author> <DisplayName>Souke, Chad C. (Chad Conway), 1976-</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Mechanical Engineering.</Keyword> <Abstract>Setup time reduction is one of the principle forces enabling lean manufacturing. This thesis documents the formulation and reduction to practice of two stages of a setup time reduction strategy for a 700-ton Danley progressive die press. Common methodologies of setup time reduction were presented and discussed, with the purpose of developing a general algebra for setup reduction. The algebra was applied to develop a specific strategy for setup time reduction of a 700-ton Danley progressive die press. Attempts were then made to reduce the strategy to practice.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description","label":"Description","values":["Thesis (S.B.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1999."]},{"key":"dc:description.abstract","label":"Abstract","values":["Setup time reduction is one of the principle forces enabling lean manufacturing. This thesis documents the formulation and reduction to practice of two stages of a setup time reduction strategy for a 700-ton Danley progressive die press. Common methodologies of setup time reduction were presented and discussed, with the purpose of developing a general algebra for setup reduction. The algebra was applied to develop a specific strategy for setup time reduction of a 700-ton Danley progressive die press. Attempts were then made to reduce the strategy to practice."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["S.B."]},{"key":"dc:description.statementofresponsibility","label":"Dc Description Statementofresponsibility","values":["by Chad C. Souke."]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["69, [11] leaves","5469845 bytes","5469605 bytes"]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Development and implementation of setup time reduction strategies for a 700-ton Danley progressive die press"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"others:access_status","label":"Others Access Status","values":["unknown"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"1b7585dd-f03b-4f62-909d-b47f84d5a5d2\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Development and implementation of setup time reduction strategies for a 700-ton Danley progressive die press</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>1999</PublicationDate> <Authors> <Author> <DisplayName>Souke, Chad C. (Chad Conway), 1976-</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <DisplayName>Massachusetts Institute of Technology</DisplayName> <OrgUnit /> </Publisher> </Publishers> <License>http://dspace.mit.edu/handle/1721.1/7582</License> <Keyword>Mechanical Engineering.</Keyword> <Abstract>Setup time reduction is one of the principle forces enabling lean manufacturing. This thesis documents the formulation and reduction to practice of two stages of a setup time reduction strategy for a 700-ton Danley progressive die press. Common methodologies of setup time reduction were presented and discussed, with the purpose of developing a general algebra for setup reduction. The algebra was applied to develop a specific strategy for setup time reduction of a 700-ton Danley progressive die press. Attempts were then made to reduce the strategy to practice.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.advisor":["David Cochran."],"dc:contributor.other":["Massachusetts Institute of Technology. Dept. of Mechanical Engineering."],"dc:creator":["Souke, Chad C. (Chad Conway), 1976-"],"dc:date.accessioned":["2005-08-22T20:33:50Z"],"dc:date.available":["2005-08-22T20:33:50Z"],"dc:date.copyright":["1999"],"dc:date.issued":["1999"],"dc:description":["Thesis (S.B.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1999."],"dc:description.abstract":["Setup time reduction is one of the principle forces enabling lean manufacturing. This thesis documents the formulation and reduction to practice of two stages of a setup time reduction strategy for a 700-ton Danley progressive die press. Common methodologies of setup time reduction were presented and discussed, with the purpose of developing a general algebra for setup reduction. The algebra was applied to develop a specific strategy for setup time reduction of a 700-ton Danley progressive die press. Attempts were then made to reduce the strategy to practice."],"dc:description.degree":["S.B."],"dc:description.statementofresponsibility":["by Chad C. Souke."],"dc:format.extent":["69, [11] leaves","5469845 bytes","5469605 bytes"],"dc:format.mimetype":["application/pdf"],"dc:identifier.oclc":["44458622"],"dc:identifier.uri":["http://hdl.handle.net/1721.1/9356"],"dc:language.iso":["en"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:rights":["M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission."],"dc:rights.uri":["http://dspace.mit.edu/handle/1721.1/7582"],"dc:subject":["Mechanical Engineering."],"dc:title":["Development and implementation of setup time reduction strategies for a 700-ton Danley progressive die press"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"others:access_status":["unknown"]},"updated_at":"2026-11-27T04:19:48Z"}