{"id":{"repo_id":"montana-tech","oai_identifier":"oai:scholarworks.umt.edu:etd-5597"},"canonical_url":"https://search.ndltd.org/etd/montana-tech/oai:scholarworks.umt.edu:etd-5597","repository":{"repo_id":"montana-tech","name":"Montana Technology","base_url":"https://scholarworks.umt.edu/do/oai/"},"display":{"title":"The Role of Funding Programs in Promotion of Best Management Practices for Effective Stream Restoration","abstract":"Large amounts of money are spent on stream restoration projects across the United States every year. Restoration researchers and professionals commonly recommend a suite of Best Management Practices (BMPs), including project goals, objectives, monitoring, consideration of future conditions, adaptive management, and public reporting of results, which are widely recognized as contributing to effective projects. Studies over the last two decades demonstrated that these BMPs were not consistently incorporated into restoration projects, which highlighted the need to improve practices and for funding programs to incorporate BMPs into funding requirements. I reviewed 28 programs that fund stream restoration in the Rocky Mountain region to determine whether programs require information associated with BMPs in the application and evaluation process and if this varies with funding program size. Additionally, I reviewed budget restrictions and timelines to investigate impediments to achieving BMPs. Previous studies typically found few restoration plans included goals and objectives, but 91% of the current funding programs in my survey required both goals and objectives as part of the application process. The larger (project costs > $300,000) funding programs in this study had more comprehensive BMP requirements: all of the large funding programs required goals, objectives, and public reporting of project results, while none of the smaller (<$25,000 per project) funding programs required consideration for future conditions or adaptive management. Even though post-project monitoring is commonly indicated to be required, many funding timelines are less than two years which is too short to evaluate whether the restoration successfully achieved their objectives. To evaluate project success, smaller funding programs need to expand their BMP requirements. Overall, the field may need to consider alternatives for funding approaches that would better facilitate monitoring and adaptive management.","abstract_html":"Large amounts of money are spent on stream restoration projects across the United States every year. Restoration researchers and professionals commonly recommend a suite of Best Management Practices (BMPs), including project goals, objectives, monitoring, consideration of future conditions, adaptive management, and public reporting of results, which are widely recognized as contributing to effective projects. Studies over the last two decades demonstrated that these BMPs were not consistently incorporated into restoration projects, which highlighted the need to improve practices and for funding programs to incorporate BMPs into funding requirements. I reviewed 28 programs that fund stream restoration in the Rocky Mountain region to determine whether programs require information associated with BMPs in the application and evaluation process and if this varies with funding program size. Additionally, I reviewed budget restrictions and timelines to investigate impediments to achieving BMPs. Previous studies typically found few restoration plans included goals and objectives, but 91% of the current funding programs in my survey required both goals and objectives as part of the application process. The larger (project costs &gt; $300,000) funding programs in this study had more comprehensive BMP requirements: all of the large funding programs required goals, objectives, and public reporting of project results, while none of the smaller (&lt;$25,000 per project) funding programs required consideration for future conditions or adaptive management. Even though post-project monitoring is commonly indicated to be required, many funding timelines are less than two years which is too short to evaluate whether the restoration successfully achieved their objectives. To evaluate project success, smaller funding programs need to expand their BMP requirements. Overall, the field may need to consider alternatives for funding approaches that would better facilitate monitoring and adaptive management.","abstract_has_math":true,"creators":["Wendt, Tracy R"],"institution":"University of Montana","degree_name":"Master of Science (MS)","degree_level":null,"degree_discipline":null,"degree_department":"College of Forestry and Conservation","school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T08:32:16Z","subjects":["restoration","aquatic","funding","riparian","Rocky Mountains","Natural Resources and Conservation"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://scholarworks.umt.edu/etd/4564","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://scholarworks.umt.edu/etd/4564","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://scholarworks.umt.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Ascholarworks.umt.edu%3Aetd-5597","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.role","label":"Dc Contributor Role","values":["Lisa Eby"]},{"key":"dc:creator","label":"Author","values":["Wendt, Tracy R"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.created","label":"Dc Date Created","values":["2015-01-01T08:00:00Z"]},{"key":"dc:publisher","label":"Institution","values":["University of Montana"]},{"key":"dc:type","label":"Dc Type","values":["Professional Paper"]},{"key":"thesis:degree_department","label":"Department","values":["College of Forestry and Conservation"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science (MS)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["restoration","aquatic","funding","riparian","Rocky Mountains","Natural Resources and Conservation"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://scholarworks.umt.edu/etd/4564"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Large amounts of money are spent on stream restoration projects across the United States every year. Restoration researchers and professionals commonly recommend a suite of Best Management Practices (BMPs), including project goals, objectives, monitoring, consideration of future conditions, adaptive management, and public reporting of results, which are widely recognized as contributing to effective projects. Studies over the last two decades demonstrated that these BMPs were not consistently incorporated into restoration projects, which highlighted the need to improve practices and for funding programs to incorporate BMPs into funding requirements. I reviewed 28 programs that fund stream restoration in the Rocky Mountain region to determine whether programs require information associated with BMPs in the application and evaluation process and if this varies with funding program size. Additionally, I reviewed budget restrictions and timelines to investigate impediments to achieving BMPs. Previous studies typically found few restoration plans included goals and objectives, but 91% of the current funding programs in my survey required both goals and objectives as part of the application process. The larger (project costs > $300,000) funding programs in this study had more comprehensive BMP requirements: all of the large funding programs required goals, objectives, and public reporting of project results, while none of the smaller (<$25,000 per project) funding programs required consideration for future conditions or adaptive management. Even though post-project monitoring is commonly indicated to be required, many funding timelines are less than two years which is too short to evaluate whether the restoration successfully achieved their objectives. To evaluate project success, smaller funding programs need to expand their BMP requirements. Overall, the field may need to consider alternatives for funding approaches that would better facilitate monitoring and adaptive management."]},{"key":"dc:title","label":"Title","values":["The Role of Funding Programs in Promotion of Best Management Practices for Effective Stream Restoration"]}]}],"canonical_facts":{"dc:contributor.role":["Lisa Eby"],"dc:creator":["Wendt, Tracy R"],"dc:date.created":["2015-01-01T08:00:00Z"],"dc:description.abstract":["Large amounts of money are spent on stream restoration projects across the United States every year. Restoration researchers and professionals commonly recommend a suite of Best Management Practices (BMPs), including project goals, objectives, monitoring, consideration of future conditions, adaptive management, and public reporting of results, which are widely recognized as contributing to effective projects. Studies over the last two decades demonstrated that these BMPs were not consistently incorporated into restoration projects, which highlighted the need to improve practices and for funding programs to incorporate BMPs into funding requirements. I reviewed 28 programs that fund stream restoration in the Rocky Mountain region to determine whether programs require information associated with BMPs in the application and evaluation process and if this varies with funding program size. Additionally, I reviewed budget restrictions and timelines to investigate impediments to achieving BMPs. Previous studies typically found few restoration plans included goals and objectives, but 91% of the current funding programs in my survey required both goals and objectives as part of the application process. The larger (project costs > $300,000) funding programs in this study had more comprehensive BMP requirements: all of the large funding programs required goals, objectives, and public reporting of project results, while none of the smaller (<$25,000 per project) funding programs required consideration for future conditions or adaptive management. Even though post-project monitoring is commonly indicated to be required, many funding timelines are less than two years which is too short to evaluate whether the restoration successfully achieved their objectives. To evaluate project success, smaller funding programs need to expand their BMP requirements. Overall, the field may need to consider alternatives for funding approaches that would better facilitate monitoring and adaptive management."],"dc:identifier":["https://scholarworks.umt.edu/etd/4564"],"dc:publisher":["University of Montana"],"dc:subject":["restoration","aquatic","funding","riparian","Rocky Mountains","Natural Resources and Conservation"],"dc:title":["The Role of Funding Programs in Promotion of Best Management Practices for Effective Stream Restoration"],"dc:type":["Professional Paper"],"thesis:degree_department":["College of Forestry and Conservation"],"thesis:degree_name":["Master of Science (MS)"]},"updated_at":"2026-11-19T08:32:16Z"}