{"id":{"repo_id":"msu","oai_identifier":"oai:d.lib.msu.edu:etd_52414"},"canonical_url":"https://search.ndltd.org/etd/msu/oai:d.lib.msu.edu:etd_52414","repository":{"repo_id":"msu","name":"Michigan State University","base_url":"https://d.lib.msu.edu/oai"},"display":{"title":"Project Management Practices and Information Flow in the Preconstruction Stage of Mass Timber Construction Projects","abstract":"Thesis (M.S.)--Michigan State University. Construction Management - Master of Science, 2025","abstract_html":"Thesis (M.S.)--Michigan State University. Construction Management - Master of Science, 2025","abstract_has_math":false,"creators":["Gouru, Venkata Revanth Reddy"],"institution":null,"degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":["Berghorn, George H","Syal, Matt M.G","Nankar, Bhushan"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2025,"date_issued":"2025","date_published":"2025","updated_at":"2026-11-18T18:59:03Z","subjects":["Architecture","Civil engineering"],"languages":["eng"],"rights":["Attribution 4.0 International"],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["etd:52414","local:Gouru_grad.msu_0128N_21348"],"render_values":[{"text":"etd:52414","href":null,"code":true},{"text":"local:Gouru_grad.msu_0128N_21348","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/doi:10.25335/b4v4-4d91","outbound_label":"DOI","outbound_source":"dc:identifier","record_url":"https://doi.org/doi:10.25335/b4v4-4d91","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://d.lib.msu.edu/oai?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Ad.lib.msu.edu%3Aetd_52414","prefix":"oai_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Berghorn, George H","Syal, Matt M.G","Nankar, Bhushan"]},{"key":"dc:creator","label":"Author","values":["Gouru, Venkata Revanth Reddy"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2025"]},{"key":"dc:relation","label":"Dc Relation","values":["Electronic Theses & Dissertations"]},{"key":"dc:type","label":"Dc Type","values":["text","Electronic dissertations"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Architecture","Civil engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["Attribution 4.0 International"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["etd:52414","local:Gouru_grad.msu_0128N_21348","https://doi.org/doi:10.25335/b4v4-4d91"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Thesis (M.S.)--Michigan State University. Construction Management - Master of Science, 2025","An effective and environmentally friendly substitute for traditional steel and concrete building is mass timber construction, or MTC. Despite its increasing use, the preconstruction stage of mass timber projects poses difficulties because of the coordination between different teams, the integration of digital workflows, and the complexity of procurement. This research aims to investigate project management practices during the preconstruction phase of mass timber construction projects, focusing on the flow of information, stakeholder roles, and decision-making processes. The study employs a qualitative exploratory approach, utilizing literature review, industry interviews, and case studies to identify key stakeholders, their interactions, and the efficiency of information exchange. The findings will contribute to developing an optimized information flow model that enhances coordination and project efficiency in mass timber projects. By addressing existing gaps and challenges, this research seeks to provide industry practitioners with insights into best practices for improving preconstruction management in mass timber construction.","Description based on online resource. Title from PDF t.p. (Michigan State University Fedora Repository, viewed ).","Includes bibliographical references."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf","1 online resource (107 p.) : ill."]},{"key":"dc:title","label":"Title","values":["Project Management Practices and Information Flow in the Preconstruction Stage of Mass Timber Construction Projects"]}]}],"canonical_facts":{"dc:contributor":["Berghorn, George H","Syal, Matt M.G","Nankar, Bhushan"],"dc:creator":["Gouru, Venkata Revanth Reddy"],"dc:date":["2025"],"dc:description":["Thesis (M.S.)--Michigan State University. Construction Management - Master of Science, 2025","An effective and environmentally friendly substitute for traditional steel and concrete building is mass timber construction, or MTC. Despite its increasing use, the preconstruction stage of mass timber projects poses difficulties because of the coordination between different teams, the integration of digital workflows, and the complexity of procurement. This research aims to investigate project management practices during the preconstruction phase of mass timber construction projects, focusing on the flow of information, stakeholder roles, and decision-making processes. The study employs a qualitative exploratory approach, utilizing literature review, industry interviews, and case studies to identify key stakeholders, their interactions, and the efficiency of information exchange. The findings will contribute to developing an optimized information flow model that enhances coordination and project efficiency in mass timber projects. By addressing existing gaps and challenges, this research seeks to provide industry practitioners with insights into best practices for improving preconstruction management in mass timber construction.","Description based on online resource. Title from PDF t.p. (Michigan State University Fedora Repository, viewed ).","Includes bibliographical references."],"dc:format":["application/pdf","1 online resource (107 p.) : ill."],"dc:identifier":["etd:52414","local:Gouru_grad.msu_0128N_21348","https://doi.org/doi:10.25335/b4v4-4d91"],"dc:language":["eng"],"dc:relation":["Electronic Theses & Dissertations"],"dc:rights":["Attribution 4.0 International"],"dc:subject":["Architecture","Civil engineering"],"dc:title":["Project Management Practices and Information Flow in the Preconstruction Stage of Mass Timber Construction Projects"],"dc:type":["text","Electronic dissertations"]},"updated_at":"2026-11-18T18:59:03Z"}