{"id":{"repo_id":"nanyang","oai_identifier":"oai:dr.ntu.edu.sg:10356/12246"},"canonical_url":"https://search.ndltd.org/etd/nanyang/oai:dr.ntu.edu.sg:10356/12246","repository":{"repo_id":"nanyang","name":"Nanyang Technological University","base_url":"https://dr.ntu.edu.sg/oai/request"},"display":{"title":"Development of a rock mass characteristics model for TBM penetration rate prediction","abstract":"With the advances of technology, TBMs are becoming more versatile and TBM tunneling has become a common tunneling method. During project planning, the prediction of TBM performance is a key factor for selection of tunneling methods and preparation of project schedules. During the construction, TBM performance need to be evaluated based on the encountered rock mass conditions and the machine parameters. A suitable prediction and evaluation model is required by the developer, contractors and TBM manufacturers. The objectives of this research are to study rock mass fragmentation mechanism induced by TBM cutters, and to develop a TBM penetration rate prediction model based on in situ measurements and laboratory tests.","abstract_html":"With the advances of technology, TBMs are becoming more versatile and TBM tunneling has become a common tunneling method. During project planning, the prediction of TBM performance is a key factor for selection of tunneling methods and preparation of project schedules. During the construction, TBM performance need to be evaluated based on the encountered rock mass conditions and the machine parameters. A suitable prediction and evaluation model is required by the developer, contractors and TBM manufacturers. The objectives of this research are to study rock mass fragmentation mechanism induced by TBM cutters, and to develop a TBM penetration rate prediction model based on in situ measurements and laboratory tests.","abstract_has_math":false,"creators":["Gong, Qiuming"],"institution":null,"degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":"School of Civil and Environmental Engineering","contributors":[],"advisors":["Zhao Jian"],"committee_chairs":[],"committee_members":[],"year":2006,"date_issued":"2006","date_published":"2006","updated_at":"2026-11-28T08:05:58Z","subjects":["DRNTU::Engineering::Civil engineering::Geotechnical"],"languages":["en"],"rights":["Nanyang Technological University"],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10356/12246"],"render_values":[{"text":"https://hdl.handle.net/10356/12246","href":"https://hdl.handle.net/10356/12246","code":true}]},{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["Gong, Q. M. (2006). Development of a rock mass characteristics model for TBM penetration rate prediction. Doctoral thesis, Nanyang Technological University, Singapore."],"render_values":[{"text":"Gong, Q. M. (2006). Development of a rock mass characteristics model for TBM penetration rate prediction. Doctoral thesis, Nanyang Technological University, Singapore.","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.32657/10356/12246","outbound_label":"DOI","outbound_source":"dc:identifier.doi","record_url":"https://doi.org/10.32657/10356/12246","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier.doi","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Ananyang%3Aoai%3Adr.ntu.edu.sg%3A10356%2F12246","prefix":"oai_dc"},"source_record":{"url":"https://dr.ntu.edu.sg/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adr.ntu.edu.sg%3A10356%2F12246","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.school","label":"School","values":["School of Civil and Environmental Engineering"]},{"key":"dc:contributor.supervisor","label":"Supervisor","values":["Zhao Jian"]},{"key":"dc:creator","label":"Author","values":["Gong, Qiuming"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2008-09-25T06:41:27Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2008-09-25T06:41:27Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2006"]},{"key":"dc:date.issued","label":"Date","values":["2006"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["DRNTU::Engineering::Civil engineering::Geotechnical"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]},{"key":"dc:rights","label":"Dc Rights","values":["Nanyang Technological University"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["Gong, Q. M. (2006). Development of a rock mass characteristics model for TBM penetration rate prediction. Doctoral thesis, Nanyang Technological University, Singapore."]},{"key":"dc:identifier.doi","label":"DOI","values":["10.32657/10356/12246"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10356/12246"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"bb36628a-2550-46f3-a48f-e9f004c1fae6\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Development of a rock mass characteristics model for TBM penetration rate prediction</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2006</PublicationDate> <DOI>10.32657/10356/12246</DOI> <Authors> <Author> <DisplayName>Gong, Qiuming</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <OrgUnit /> </Publisher> </Publishers> <Keyword>DRNTU::Engineering::Civil engineering::Geotechnical</Keyword> <Abstract>With the advances of technology, TBMs are becoming more versatile and TBM tunneling has become a common tunneling method. During project planning, the prediction of TBM performance is a key factor for selection of tunneling methods and preparation of project schedules. During the construction, TBM performance need to be evaluated based on the encountered rock mass conditions and the machine parameters. A suitable prediction and evaluation model is required by the developer, contractors and TBM manufacturers. The objectives of this research are to study rock mass fragmentation mechanism induced by TBM cutters, and to develop a TBM penetration rate prediction model based on in situ measurements and laboratory tests.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description.abstract","label":"Abstract","values":["With the advances of technology, TBMs are becoming more versatile and TBM tunneling has become a common tunneling method. During project planning, the prediction of TBM performance is a key factor for selection of tunneling methods and preparation of project schedules. During the construction, TBM performance need to be evaluated based on the encountered rock mass conditions and the machine parameters. A suitable prediction and evaluation model is required by the developer, contractors and TBM manufacturers. The objectives of this research are to study rock mass fragmentation mechanism induced by TBM cutters, and to develop a TBM penetration rate prediction model based on in situ measurements and laboratory tests."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["Doctor of Philosophy (CEE)"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["283 p."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Development of a rock mass characteristics model for TBM penetration rate prediction"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"bb36628a-2550-46f3-a48f-e9f004c1fae6\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>Development of a rock mass characteristics model for TBM penetration rate prediction</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2006</PublicationDate> <DOI>10.32657/10356/12246</DOI> <Authors> <Author> <DisplayName>Gong, Qiuming</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <OrgUnit /> </Publisher> </Publishers> <Keyword>DRNTU::Engineering::Civil engineering::Geotechnical</Keyword> <Abstract>With the advances of technology, TBMs are becoming more versatile and TBM tunneling has become a common tunneling method. During project planning, the prediction of TBM performance is a key factor for selection of tunneling methods and preparation of project schedules. During the construction, TBM performance need to be evaluated based on the encountered rock mass conditions and the machine parameters. A suitable prediction and evaluation model is required by the developer, contractors and TBM manufacturers. The objectives of this research are to study rock mass fragmentation mechanism induced by TBM cutters, and to develop a TBM penetration rate prediction model based on in situ measurements and laboratory tests.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.school":["School of Civil and Environmental Engineering"],"dc:contributor.supervisor":["Zhao Jian"],"dc:creator":["Gong, Qiuming"],"dc:date.accessioned":["2008-09-25T06:41:27Z"],"dc:date.available":["2008-09-25T06:41:27Z"],"dc:date.copyright":["2006"],"dc:date.issued":["2006"],"dc:description.abstract":["With the advances of technology, TBMs are becoming more versatile and TBM tunneling has become a common tunneling method. During project planning, the prediction of TBM performance is a key factor for selection of tunneling methods and preparation of project schedules. During the construction, TBM performance need to be evaluated based on the encountered rock mass conditions and the machine parameters. A suitable prediction and evaluation model is required by the developer, contractors and TBM manufacturers. The objectives of this research are to study rock mass fragmentation mechanism induced by TBM cutters, and to develop a TBM penetration rate prediction model based on in situ measurements and laboratory tests."],"dc:description.degree":["Doctor of Philosophy (CEE)"],"dc:format.extent":["283 p."],"dc:format.mimetype":["application/pdf"],"dc:identifier.citation":["Gong, Q. M. (2006). Development of a rock mass characteristics model for TBM penetration rate prediction. Doctoral thesis, Nanyang Technological University, Singapore."],"dc:identifier.doi":["10.32657/10356/12246"],"dc:identifier.uri":["https://hdl.handle.net/10356/12246"],"dc:language.iso":["en"],"dc:rights":["Nanyang Technological University"],"dc:subject":["DRNTU::Engineering::Civil engineering::Geotechnical"],"dc:title":["Development of a rock mass characteristics model for TBM penetration rate prediction"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"]},"updated_at":"2026-11-28T08:05:58Z"}