{"id":{"repo_id":"nanyang","oai_identifier":"oai:dr.ntu.edu.sg:10356/60653"},"canonical_url":"https://search.ndltd.org/etd/nanyang/oai:dr.ntu.edu.sg:10356/60653","repository":{"repo_id":"nanyang","name":"Nanyang Technological University","base_url":"https://dr.ntu.edu.sg/oai/request"},"display":{"title":"A study of semiconductor back-end manufacturing : special focus on scheduling techniques","abstract":"The purpose of this project was to study the impact of release input, lot dispatch and lot batching policies on the mean and variance of cycle time in the semiconductor back-end facility.","abstract_html":"The purpose of this project was to study the impact of release input, lot dispatch and lot batching policies on the mean and variance of cycle time in the semiconductor back-end facility.","abstract_has_math":false,"creators":["Ong, Choon Keong","Teo, Chee Chong","Yeo, Lip Pin"],"institution":null,"degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":"School of Mechanical and Aerospace Engineering","contributors":[],"advisors":["Appa Iyer Sivakumar"],"committee_chairs":[],"committee_members":[],"year":2001,"date_issued":"2001","date_published":"2001","updated_at":"2026-11-27T10:22:29Z","subjects":["DRNTU::Engineering::Manufacturing"],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10356/60653","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10356/60653","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Ananyang%3Aoai%3Adr.ntu.edu.sg%3A10356%2F60653","prefix":"oai_dc"},"source_record":{"url":"https://dr.ntu.edu.sg/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Adr.ntu.edu.sg%3A10356%2F60653","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.school","label":"School","values":["School of Mechanical and Aerospace Engineering"]},{"key":"dc:contributor.supervisor","label":"Supervisor","values":["Appa Iyer Sivakumar"]},{"key":"dc:creator","label":"Author","values":["Ong, Choon Keong","Teo, Chee Chong","Yeo, Lip Pin"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2014-05-29T03:49:54Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2014-05-29T03:49:54Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2001"]},{"key":"dc:date.issued","label":"Date","values":["2001"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["DRNTU::Engineering::Manufacturing"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10356/60653"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"cerif:openaire","label":"Cerif Openaire","values":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"47a3c885-b4d3-422f-8886-9c494b09d56f\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>A study of semiconductor back-end manufacturing : special focus on scheduling techniques</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2001</PublicationDate> <Authors> <Author> <DisplayName>Ong, Choon Keong</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> <Author> <DisplayName>Teo, Chee Chong</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> <Author> <DisplayName>Yeo, Lip Pin</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <OrgUnit /> </Publisher> </Publishers> <Keyword>DRNTU::Engineering::Manufacturing</Keyword> <Abstract>The purpose of this project was to study the impact of release input, lot dispatch and lot batching policies on the mean and variance of cycle time in the semiconductor back-end facility.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"]},{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this project was to study the impact of release input, lot dispatch and lot batching policies on the mean and variance of cycle time in the semiconductor back-end facility."]},{"key":"dc:description.degree","label":"Dc Description Degree","values":["​Master of Science (IMST)"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["105 p."]},{"key":"dc:title","label":"Title","values":["A study of semiconductor back-end manufacturing : special focus on scheduling techniques"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"cerif:openaire":["<Publication xmlns=\"https://www.openaire.eu/cerif-profile/1.1/\" id=\"47a3c885-b4d3-422f-8886-9c494b09d56f\"> <Type xmlns=\"https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types\">http://purl.org/coar/resource_type/c_1843</Type> <Language>en</Language> <Title>A study of semiconductor back-end manufacturing : special focus on scheduling techniques</Title> <PublishedIn> <Publication> </Publication> </PublishedIn> <PublicationDate>2001</PublicationDate> <Authors> <Author> <DisplayName>Ong, Choon Keong</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> <Author> <DisplayName>Teo, Chee Chong</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> <Author> <DisplayName>Yeo, Lip Pin</DisplayName> <Affiliation> <OrgUnit> </OrgUnit> </Affiliation> </Author> </Authors> <Editors> </Editors> <Publishers> <Publisher> <OrgUnit /> </Publisher> </Publishers> <Keyword>DRNTU::Engineering::Manufacturing</Keyword> <Abstract>The purpose of this project was to study the impact of release input, lot dispatch and lot batching policies on the mean and variance of cycle time in the semiconductor back-end facility.</Abstract> <Access xmlns=\"http://purl.org/coar/access_right\" > </Access> </Publication>"],"dc:contributor.school":["School of Mechanical and Aerospace Engineering"],"dc:contributor.supervisor":["Appa Iyer Sivakumar"],"dc:creator":["Ong, Choon Keong","Teo, Chee Chong","Yeo, Lip Pin"],"dc:date.accessioned":["2014-05-29T03:49:54Z"],"dc:date.available":["2014-05-29T03:49:54Z"],"dc:date.copyright":["2001"],"dc:date.issued":["2001"],"dc:description.abstract":["The purpose of this project was to study the impact of release input, lot dispatch and lot batching policies on the mean and variance of cycle time in the semiconductor back-end facility."],"dc:description.degree":["​Master of Science (IMST)"],"dc:format.extent":["105 p."],"dc:identifier.uri":["https://hdl.handle.net/10356/60653"],"dc:language.iso":["en"],"dc:subject":["DRNTU::Engineering::Manufacturing"],"dc:title":["A study of semiconductor back-end manufacturing : special focus on scheduling techniques"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"]},"updated_at":"2026-11-27T10:22:29Z"}