{"id":{"repo_id":"ndsu","oai_identifier":"oai:library.ndsu.edu:10365/27228"},"canonical_url":"https://search.ndltd.org/etd/ndsu/oai:library.ndsu.edu:10365/27228","repository":{"repo_id":"ndsu","name":"North Dakota State University","base_url":"https://library.ndsu.edu/server/oai/request"},"display":{"title":"Assessment of Owner Risk Associated with Airport Capital and Maintenance Projects","abstract":"The thesis produces a risk management process that effectively determines risk and its effects on commercial airport owner activities. To achieve this goal, the thesis reviewed these objectives: 1) Determination of major risks in the US commercial aviation industry; 2) Assessment and analysis of these risks in US commercial facilities; and 3) Producing risk dynamic in a project cycle associated with airport owner activities. The owner of airport facilities faces multiple risks in planning, design & construction of commercial airports. Literature on airport risk and damages was reviewed and used to produce a survey sent to select facilities in the USA. Survey feedback was analyzed utilizing the probability impact matrix, risk ranking equations and normal descriptive statistics. Results of this analysis produced a top 10 risk list for project objectives affected by noted risks and a general top 20 risk list assigned to a project cycle risk dynamic.","abstract_html":"The thesis produces a risk management process that effectively determines risk and its effects on commercial airport owner activities. To achieve this goal, the thesis reviewed these objectives: 1) Determination of major risks in the US commercial aviation industry; 2) Assessment and analysis of these risks in US commercial facilities; and 3) Producing risk dynamic in a project cycle associated with airport owner activities. The owner of airport facilities faces multiple risks in planning, design &amp; construction of commercial airports. Literature on airport risk and damages was reviewed and used to produce a survey sent to select facilities in the USA. Survey feedback was analyzed utilizing the probability impact matrix, risk ranking equations and normal descriptive statistics. Results of this analysis produced a top 10 risk list for project objectives affected by noted risks and a general top 20 risk list assigned to a project cycle risk dynamic.","abstract_has_math":false,"creators":["Ehiemere, Chidozie"],"institution":"North Dakota State University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2013,"date_issued":"2013","date_published":"2013","updated_at":"2026-11-19T13:46:36Z","subjects":[],"languages":[],"rights":["NDSU Policy 190.6.2"],"rights_urls":["https://www.ndsu.edu/fileadmin/policy/190.pdf"],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10365/27228","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10365/27228","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://library.ndsu.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Alibrary.ndsu.edu%3A10365%2F27228","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Ehiemere, Chidozie"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2018-01-14T20:25:49Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2018-01-14T20:25:49Z"]},{"key":"dc:date.issued","label":"Date","values":["2013"]},{"key":"dc:publisher","label":"Institution","values":["North Dakota State University"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["NDSU Policy 190.6.2"]},{"key":"dc:rights.uri","label":"Rights URI","values":["https://www.ndsu.edu/fileadmin/policy/190.pdf"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10365/27228"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The thesis produces a risk management process that effectively determines risk and its effects on commercial airport owner activities. To achieve this goal, the thesis reviewed these objectives: 1) Determination of major risks in the US commercial aviation industry; 2) Assessment and analysis of these risks in US commercial facilities; and 3) Producing risk dynamic in a project cycle associated with airport owner activities. The owner of airport facilities faces multiple risks in planning, design & construction of commercial airports. Literature on airport risk and damages was reviewed and used to produce a survey sent to select facilities in the USA. Survey feedback was analyzed utilizing the probability impact matrix, risk ranking equations and normal descriptive statistics. Results of this analysis produced a top 10 risk list for project objectives affected by noted risks and a general top 20 risk list assigned to a project cycle risk dynamic."]},{"key":"dc:title","label":"Title","values":["Assessment of Owner Risk Associated with Airport Capital and Maintenance Projects"]}]}],"canonical_facts":{"dc:creator":["Ehiemere, Chidozie"],"dc:date.accessioned":["2018-01-14T20:25:49Z"],"dc:date.available":["2018-01-14T20:25:49Z"],"dc:date.issued":["2013"],"dc:description.abstract":["The thesis produces a risk management process that effectively determines risk and its effects on commercial airport owner activities. To achieve this goal, the thesis reviewed these objectives: 1) Determination of major risks in the US commercial aviation industry; 2) Assessment and analysis of these risks in US commercial facilities; and 3) Producing risk dynamic in a project cycle associated with airport owner activities. The owner of airport facilities faces multiple risks in planning, design & construction of commercial airports. Literature on airport risk and damages was reviewed and used to produce a survey sent to select facilities in the USA. Survey feedback was analyzed utilizing the probability impact matrix, risk ranking equations and normal descriptive statistics. Results of this analysis produced a top 10 risk list for project objectives affected by noted risks and a general top 20 risk list assigned to a project cycle risk dynamic."],"dc:identifier.uri":["https://hdl.handle.net/10365/27228"],"dc:publisher":["North Dakota State University"],"dc:rights":["NDSU Policy 190.6.2"],"dc:rights.uri":["https://www.ndsu.edu/fileadmin/policy/190.pdf"],"dc:title":["Assessment of Owner Risk Associated with Airport Capital and Maintenance Projects"],"dc:type":["Thesis"]},"updated_at":"2026-11-19T13:46:36Z"}