{"id":{"repo_id":"ndsu","oai_identifier":"oai:library.ndsu.edu:10365/33462"},"canonical_url":"https://search.ndltd.org/etd/ndsu/oai:library.ndsu.edu:10365/33462","repository":{"repo_id":"ndsu","name":"North Dakota State University","base_url":"https://library.ndsu.edu/server/oai/request"},"display":{"title":"Evaluating the Effects of Rail Preemption Strategies on Highway Safety and Operations","abstract":"Previous research related to signal preemption near highway-rail grade crossings has emphasized safety considerations, which are paramount due to the severity of potential train-vehicle collisions. The purpose of this research was to quantify the safety and efficiency implications of several common preemption strategies using the conditions in a small urban context. The research evaluates several important characteristics of rail preemption, including track clearance time, advance preempt time, and dwell cycle strategy, particularly with regard to surface street operational efficiency, that current traffic engineering practice do not adequately address. The context and preemption strategies were modeled using simulation software VISSIM. The results identified two separate and potentially serious safety issues related to the interaction of advance preempt time, track clearance time, and existence of four-quadrant gates at railroad crossing. In addition, the research also highlighted the negative effect of excessive track clearance time and dwell cycle on adjacent surface street operations.","abstract_html":"Previous research related to signal preemption near highway-rail grade crossings has emphasized safety considerations, which are paramount due to the severity of potential train-vehicle collisions. The purpose of this research was to quantify the safety and efficiency implications of several common preemption strategies using the conditions in a small urban context. The research evaluates several important characteristics of rail preemption, including track clearance time, advance preempt time, and dwell cycle strategy, particularly with regard to surface street operational efficiency, that current traffic engineering practice do not adequately address. The context and preemption strategies were modeled using simulation software VISSIM. The results identified two separate and potentially serious safety issues related to the interaction of advance preempt time, track clearance time, and existence of four-quadrant gates at railroad crossing. In addition, the research also highlighted the negative effect of excessive track clearance time and dwell cycle on adjacent surface street operations.","abstract_has_math":false,"creators":["Bratlien, Andrew Lee"],"institution":"North Dakota State University","degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2011,"date_issued":"2011","date_published":"2011","updated_at":"2026-11-19T13:43:40Z","subjects":["Traffic signal preemption.","Railroad crossings.","Traffic signs and signals."],"languages":[],"rights":["NDSU policy 190.6.2"],"rights_urls":["https://www.ndsu.edu/fileadmin/policy/190.pdf"],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10365/33462","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10365/33462","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://library.ndsu.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Alibrary.ndsu.edu%3A10365%2F33462","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Bratlien, Andrew Lee"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2023-12-26T21:22:03Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2023-12-26T21:22:03Z"]},{"key":"dc:date.issued","label":"Date","values":["2011"]},{"key":"dc:publisher","label":"Institution","values":["North Dakota State University"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Traffic signal preemption.","Railroad crossings.","Traffic signs and signals."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["NDSU policy 190.6.2"]},{"key":"dc:rights.uri","label":"Rights URI","values":["https://www.ndsu.edu/fileadmin/policy/190.pdf"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10365/33462"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Previous research related to signal preemption near highway-rail grade crossings has emphasized safety considerations, which are paramount due to the severity of potential train-vehicle collisions. The purpose of this research was to quantify the safety and efficiency implications of several common preemption strategies using the conditions in a small urban context. The research evaluates several important characteristics of rail preemption, including track clearance time, advance preempt time, and dwell cycle strategy, particularly with regard to surface street operational efficiency, that current traffic engineering practice do not adequately address. The context and preemption strategies were modeled using simulation software VISSIM. The results identified two separate and potentially serious safety issues related to the interaction of advance preempt time, track clearance time, and existence of four-quadrant gates at railroad crossing. In addition, the research also highlighted the negative effect of excessive track clearance time and dwell cycle on adjacent surface street operations."]},{"key":"dc:title","label":"Title","values":["Evaluating the Effects of Rail Preemption Strategies on Highway Safety and Operations"]}]}],"canonical_facts":{"dc:creator":["Bratlien, Andrew Lee"],"dc:date.accessioned":["2023-12-26T21:22:03Z"],"dc:date.available":["2023-12-26T21:22:03Z"],"dc:date.issued":["2011"],"dc:description.abstract":["Previous research related to signal preemption near highway-rail grade crossings has emphasized safety considerations, which are paramount due to the severity of potential train-vehicle collisions. The purpose of this research was to quantify the safety and efficiency implications of several common preemption strategies using the conditions in a small urban context. The research evaluates several important characteristics of rail preemption, including track clearance time, advance preempt time, and dwell cycle strategy, particularly with regard to surface street operational efficiency, that current traffic engineering practice do not adequately address. The context and preemption strategies were modeled using simulation software VISSIM. The results identified two separate and potentially serious safety issues related to the interaction of advance preempt time, track clearance time, and existence of four-quadrant gates at railroad crossing. In addition, the research also highlighted the negative effect of excessive track clearance time and dwell cycle on adjacent surface street operations."],"dc:identifier.uri":["https://hdl.handle.net/10365/33462"],"dc:publisher":["North Dakota State University"],"dc:rights":["NDSU policy 190.6.2"],"dc:rights.uri":["https://www.ndsu.edu/fileadmin/policy/190.pdf"],"dc:subject.lcsh":["Traffic signal preemption.","Railroad crossings.","Traffic signs and signals."],"dc:title":["Evaluating the Effects of Rail Preemption Strategies on Highway Safety and Operations"],"dc:type":["Thesis"]},"updated_at":"2026-11-19T13:43:40Z"}