{"id":{"repo_id":"njit","oai_identifier":"oai:digitalcommons.njit.edu:theses-3455"},"canonical_url":"https://search.ndltd.org/etd/njit/oai:digitalcommons.njit.edu:theses-3455","repository":{"repo_id":"njit","name":"NJIT","base_url":"https://digitalcommons.njit.edu/do/oai/"},"display":{"title":"Simulation based modeling and scheduling of a generalized flow- line","abstract":"<p>Simulation is a state of art technique, widely used to analyze the behavior of complex and dynamic real time systems. This study consists of two parts. The first part involves in the development of a simulation model of a real time flow line, used to assemble Printed Circuit Boards. The desired performance measures of the system, like, utilization, starving, blocking, failure and maintenance are recorded. The model developed can be used as a test pad to analyze scheduling rules and heuristics. This is illustrated in the second part of the study which consists of studying the behavior of the Apparent Tardiness Cost (ATC) rule under different due date tightness factors. The parameters of this rule are experimented with to find their optimal values. The ATC rule was first proposed in the literature, to solve the weighted tardiness scheduling problem for a single work station. An attempt has been made in this study to extend its application to a flow line shop floor where the jobs arrive in batches. So, priorities are now assigned to batches of jobs instead of single jobs. Results prove the ATC rule to perform better than both the Earliest Due Date (EDD) rule, and, the Weighted Shortest Processing Time (WSPT) rule. But, the trends illustrated in the literature, when the ATC schedules relatively small number of single jobs to a single station problem, are no longer observed.</p>","abstract_html":"&lt;p&gt;Simulation is a state of art technique, widely used to analyze the behavior of complex and dynamic real time systems. This study consists of two parts. The first part involves in the development of a simulation model of a real time flow line, used to assemble Printed Circuit Boards. The desired performance measures of the system, like, utilization, starving, blocking, failure and maintenance are recorded. The model developed can be used as a test pad to analyze scheduling rules and heuristics. This is illustrated in the second part of the study which consists of studying the behavior of the Apparent Tardiness Cost (ATC) rule under different due date tightness factors. The parameters of this rule are experimented with to find their optimal values. The ATC rule was first proposed in the literature, to solve the weighted tardiness scheduling problem for a single work station. An attempt has been made in this study to extend its application to a flow line shop floor where the jobs arrive in batches. So, priorities are now assigned to batches of jobs instead of single jobs. Results prove the ATC rule to perform better than both the Earliest Due Date (EDD) rule, and, the Weighted Shortest Processing Time (WSPT) rule. But, the trends illustrated in the literature, when the ATC schedules relatively small number of single jobs to a single station problem, are no longer observed.&lt;/p&gt;","abstract_has_math":false,"creators":["Anne, Srinivas"],"institution":null,"degree_name":"Master of Science in Industrial Engineering - (M.S.)","degree_level":null,"degree_discipline":"Mechanical and Industrial Engineering","degree_department":null,"school":null,"contributors":["Golgen Bengu","Xiuli Chao","Suebsak Nanthavanij"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T08:42:32Z","subjects":["Scheduling (Management) -- Computer simulation","Production engineering -- Computer simulation","Production management -- Computer simulation","Industrial Engineering"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://digitalcommons.njit.edu/theses/2441","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://digitalcommons.njit.edu/theses/2441","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://digitalcommons.njit.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Adigitalcommons.njit.edu%3Atheses-3455","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Golgen Bengu","Xiuli Chao","Suebsak Nanthavanij"]},{"key":"dc:creator","label":"Author","values":["Anne, Srinivas"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.created","label":"Dc Date Created","values":["1990-12-31T08:00:00Z"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Mechanical and Industrial Engineering"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Industrial Engineering - (M.S.)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Scheduling (Management) -- Computer simulation","Production engineering -- Computer simulation","Production management -- Computer simulation","Industrial Engineering"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://digitalcommons.njit.edu/theses/2441"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["<p>Simulation is a state of art technique, widely used to analyze the behavior of complex and dynamic real time systems. This study consists of two parts. The first part involves in the development of a simulation model of a real time flow line, used to assemble Printed Circuit Boards. The desired performance measures of the system, like, utilization, starving, blocking, failure and maintenance are recorded. The model developed can be used as a test pad to analyze scheduling rules and heuristics. This is illustrated in the second part of the study which consists of studying the behavior of the Apparent Tardiness Cost (ATC) rule under different due date tightness factors. The parameters of this rule are experimented with to find their optimal values. The ATC rule was first proposed in the literature, to solve the weighted tardiness scheduling problem for a single work station. An attempt has been made in this study to extend its application to a flow line shop floor where the jobs arrive in batches. So, priorities are now assigned to batches of jobs instead of single jobs. Results prove the ATC rule to perform better than both the Earliest Due Date (EDD) rule, and, the Weighted Shortest Processing Time (WSPT) rule. But, the trends illustrated in the literature, when the ATC schedules relatively small number of single jobs to a single station problem, are no longer observed.</p>"]},{"key":"dc:title","label":"Title","values":["Simulation based modeling and scheduling of a generalized flow- line"]}]}],"canonical_facts":{"dc:contributor":["Golgen Bengu","Xiuli Chao","Suebsak Nanthavanij"],"dc:creator":["Anne, Srinivas"],"dc:date.created":["1990-12-31T08:00:00Z"],"dc:description.abstract":["<p>Simulation is a state of art technique, widely used to analyze the behavior of complex and dynamic real time systems. This study consists of two parts. The first part involves in the development of a simulation model of a real time flow line, used to assemble Printed Circuit Boards. The desired performance measures of the system, like, utilization, starving, blocking, failure and maintenance are recorded. The model developed can be used as a test pad to analyze scheduling rules and heuristics. This is illustrated in the second part of the study which consists of studying the behavior of the Apparent Tardiness Cost (ATC) rule under different due date tightness factors. The parameters of this rule are experimented with to find their optimal values. The ATC rule was first proposed in the literature, to solve the weighted tardiness scheduling problem for a single work station. An attempt has been made in this study to extend its application to a flow line shop floor where the jobs arrive in batches. So, priorities are now assigned to batches of jobs instead of single jobs. Results prove the ATC rule to perform better than both the Earliest Due Date (EDD) rule, and, the Weighted Shortest Processing Time (WSPT) rule. But, the trends illustrated in the literature, when the ATC schedules relatively small number of single jobs to a single station problem, are no longer observed.</p>"],"dc:identifier":["https://digitalcommons.njit.edu/theses/2441"],"dc:subject":["Scheduling (Management) -- Computer simulation","Production engineering -- Computer simulation","Production management -- Computer simulation","Industrial Engineering"],"dc:title":["Simulation based modeling and scheduling of a generalized flow- line"],"dc:type":["Thesis"],"thesis:degree_discipline":["Mechanical and Industrial Engineering"],"thesis:degree_name":["Master of Science in Industrial Engineering - (M.S.)"]},"updated_at":"2026-11-19T08:42:32Z"}