{"id":{"repo_id":"njit","oai_identifier":"oai:digitalcommons.njit.edu:theses-4615"},"canonical_url":"https://search.ndltd.org/etd/njit/oai:digitalcommons.njit.edu:theses-4615","repository":{"repo_id":"njit","name":"NJIT","base_url":"https://digitalcommons.njit.edu/do/oai/"},"display":{"title":"Transportation alternatives for peak period passenger travel in greater Georgetown","abstract":"<p>Alternatives to present a workable and cost effective solution(s) to the inadequate supply of public transportation during the peak hour periods in Greater Georgetown (Guyana) are examined. Various transportation system management strategies that could help in either to service the peak period demands by more effective utilization of available transport resources or to manage these demands by altering peaks patterns, are discussed. Data from the transportation study aspect of the \"Physical Plan for Greater Georgetown\", conducted by the Central Housing and Planning Authority as well as data from the files of the Central Transport Planning Unit of the Ministry of Transport (Guyana) are used. The transportation survey was conducted during February 1981 to July 1981 and the author has had the privilege to be involved in most of the data collection for that survey.</p><p>Saving potentials do exist, both in terms of operating costs and foreign (overseas) costs as well as staving off capital investment, if a concerted effort is made towards managing peak demands and providing a complex package of integrated service arrangements, utilizing all transport resources (buses, hire cars, private automobiles, etc.), which in their ensemble will allow full area wide mobility for the many kinds of people and travel needs within the region.</p>","abstract_html":"&lt;p&gt;Alternatives to present a workable and cost effective solution(s) to the inadequate supply of public transportation during the peak hour periods in Greater Georgetown (Guyana) are examined. Various transportation system management strategies that could help in either to service the peak period demands by more effective utilization of available transport resources or to manage these demands by altering peaks patterns, are discussed. Data from the transportation study aspect of the &quot;Physical Plan for Greater Georgetown&quot;, conducted by the Central Housing and Planning Authority as well as data from the files of the Central Transport Planning Unit of the Ministry of Transport (Guyana) are used. The transportation survey was conducted during February 1981 to July 1981 and the author has had the privilege to be involved in most of the data collection for that survey.&lt;/p&gt;&lt;p&gt;Saving potentials do exist, both in terms of operating costs and foreign (overseas) costs as well as staving off capital investment, if a concerted effort is made towards managing peak demands and providing a complex package of integrated service arrangements, utilizing all transport resources (buses, hire cars, private automobiles, etc.), which in their ensemble will allow full area wide mobility for the many kinds of people and travel needs within the region.&lt;/p&gt;","abstract_has_math":false,"creators":["Baksh, Ahamad"],"institution":null,"degree_name":"Master of Science in Civil Engineering - (M.S.)","degree_level":null,"degree_discipline":"Civil and Environmental Engineering","degree_department":null,"school":null,"contributors":["Ira S. Kuperstein"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T08:44:11Z","subjects":["Urban transportation -- Guyana -- Georgetown","Transportation -- Planning -- Guyana -- Georgetown","Civil Engineering"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://digitalcommons.njit.edu/theses/3591","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://digitalcommons.njit.edu/theses/3591","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://digitalcommons.njit.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Adigitalcommons.njit.edu%3Atheses-4615","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Ira S. Kuperstein"]},{"key":"dc:creator","label":"Author","values":["Baksh, Ahamad"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.created","label":"Dc Date Created","values":["1982-09-30T07:00:00Z"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil and Environmental Engineering"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Civil Engineering - (M.S.)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Urban transportation -- Guyana -- Georgetown","Transportation -- Planning -- Guyana -- Georgetown","Civil Engineering"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://digitalcommons.njit.edu/theses/3591"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["<p>Alternatives to present a workable and cost effective solution(s) to the inadequate supply of public transportation during the peak hour periods in Greater Georgetown (Guyana) are examined. Various transportation system management strategies that could help in either to service the peak period demands by more effective utilization of available transport resources or to manage these demands by altering peaks patterns, are discussed. Data from the transportation study aspect of the \"Physical Plan for Greater Georgetown\", conducted by the Central Housing and Planning Authority as well as data from the files of the Central Transport Planning Unit of the Ministry of Transport (Guyana) are used. The transportation survey was conducted during February 1981 to July 1981 and the author has had the privilege to be involved in most of the data collection for that survey.</p><p>Saving potentials do exist, both in terms of operating costs and foreign (overseas) costs as well as staving off capital investment, if a concerted effort is made towards managing peak demands and providing a complex package of integrated service arrangements, utilizing all transport resources (buses, hire cars, private automobiles, etc.), which in their ensemble will allow full area wide mobility for the many kinds of people and travel needs within the region.</p>"]},{"key":"dc:title","label":"Title","values":["Transportation alternatives for peak period passenger travel in greater Georgetown"]}]}],"canonical_facts":{"dc:contributor":["Ira S. Kuperstein"],"dc:creator":["Baksh, Ahamad"],"dc:date.created":["1982-09-30T07:00:00Z"],"dc:description.abstract":["<p>Alternatives to present a workable and cost effective solution(s) to the inadequate supply of public transportation during the peak hour periods in Greater Georgetown (Guyana) are examined. Various transportation system management strategies that could help in either to service the peak period demands by more effective utilization of available transport resources or to manage these demands by altering peaks patterns, are discussed. Data from the transportation study aspect of the \"Physical Plan for Greater Georgetown\", conducted by the Central Housing and Planning Authority as well as data from the files of the Central Transport Planning Unit of the Ministry of Transport (Guyana) are used. The transportation survey was conducted during February 1981 to July 1981 and the author has had the privilege to be involved in most of the data collection for that survey.</p><p>Saving potentials do exist, both in terms of operating costs and foreign (overseas) costs as well as staving off capital investment, if a concerted effort is made towards managing peak demands and providing a complex package of integrated service arrangements, utilizing all transport resources (buses, hire cars, private automobiles, etc.), which in their ensemble will allow full area wide mobility for the many kinds of people and travel needs within the region.</p>"],"dc:identifier":["https://digitalcommons.njit.edu/theses/3591"],"dc:subject":["Urban transportation -- Guyana -- Georgetown","Transportation -- Planning -- Guyana -- Georgetown","Civil Engineering"],"dc:title":["Transportation alternatives for peak period passenger travel in greater Georgetown"],"dc:type":["Thesis"],"thesis:degree_discipline":["Civil and Environmental Engineering"],"thesis:degree_name":["Master of Science in Civil Engineering - (M.S.)"]},"updated_at":"2026-11-19T08:44:11Z"}